Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Simplex Infrastructures Team. If you also belong to the team, you can get access from here

Simplex Infrastructures Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Simplex Infrastructures Assistant Manager Interview Questions and Answers

Updated 29 Nov 2022

Simplex Infrastructures Assistant Manager Interview Experiences

2 interviews found

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Axis Bank
Q4. How many joint holders we can process in an account in once ?
asked in Adani Group
Q5. What IS Codes do you follow for structural steel fabrication and ... read more

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Realted work
  • Q2. IS code amendments
  • Q3. Lab tests And relevant is codes
  • Q4. Feild tests and relevant IS codes
  • Q5. QMS - Breifing

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and go through your resume prior to interview.Fake it but atleast have technical knowledge

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Assistant Manager interview?
Simplex Infrastructures interview process usually has 2-3 rounds. The most common rounds in the Simplex Infrastructures interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in Simplex Infrastructures Assistant Manager interview?

Some of the top questions asked at the Simplex Infrastructures Assistant Manager interview -

  1. What is the roles and responsibilities of safety person as per the BOCW ...read more
  2. Question from subje...read more

Tell us how to improve this page.

Simplex Infrastructures Assistant Manager Salary
based on 212 salaries
₹3.5 L/yr - ₹11 L/yr
11% less than the average Assistant Manager Salary in India
View more details

Simplex Infrastructures Assistant Manager Reviews and Ratings

based on 64 reviews

3.0/5

Rating in categories

3.1

Skill development

2.9

Work-life balance

2.4

Salary

3.3

Job security

2.9

Company culture

2.5

Promotions

2.9

Work satisfaction

Explore 64 Reviews and Ratings
Assistant Manager
212 salaries
unlock blur

₹3.5 L/yr - ₹11 L/yr

Assistant Engineer
154 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Assistant Engineer - Civil
153 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Project Engineer
128 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
110 salaries
unlock blur

₹5.5 L/yr - ₹12 L/yr

Explore more salaries
Compare Simplex Infrastructures with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview