Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Simplex Infrastructures Team. If you also belong to the team, you can get access from here

Simplex Infrastructures Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Simplex Infrastructures Civil Site Engineer Interview Questions, Process, and Tips

Updated 20 Feb 2022

Top Simplex Infrastructures Civil Site Engineer Interview Questions and Answers

Simplex Infrastructures Civil Site Engineer Interview Experiences

3 interviews found

Round 1 - Technical 

(1 Question)

  • Q1. Question about metro projects and pile foundation.
Round 2 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why we will hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok.You can join there. Currently they have a lot of projects in india.

I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Grade of concrete , reinforcement dia
  • Ans. 

    Grade of concrete and reinforcement diameter are important factors in civil engineering design.

    • The grade of concrete determines its strength and durability.

    • Common grades of concrete include M20, M25, and M30.

    • Reinforcement diameter affects the strength and stability of the structure.

    • Common reinforcement diameters include 8mm, 10mm, and 12mm.

    • The appropriate grade of concrete and reinforcement diameter depend on the speci

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is very important for all interviewer

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is a Foundation
  • Ans. 

    A foundation is a structural element that supports a building or other structure by transferring its load to the underlying soil or rock.

    • Foundations are typically made of concrete, masonry, or steel.

    • They are designed to distribute the weight of the structure evenly and prevent settlement or movement.

    • Different types of foundations include shallow foundations (such as strip footings and mat foundations) and deep foundati...

  • Answered by AI
  • Q2. Full name of RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete.

    • RCC is a composite material made of cement, sand, aggregates, and steel reinforcement.

    • It is widely used in construction for its strength and durability.

    • The steel reinforcement provides tensile strength to the concrete, while the cement, sand, and aggregates provide compressive strength.

    • RCC is commonly used in the construction of buildings, bridges, dams, and other structures.

    • Ex...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil structure site engineer 5 year experience in RCC work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Working time in site work
  • Q2. Working time period
  • Q3. Som soil survey steel
  • Q4. Highway engineering
  • Q5. Irrigation Fluid machinces
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. About your previous job?
  • Q2. What have you learned at your previous job?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident when you answer the questions. Do prepare for your interview.

I applied via Naukri.com and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Many can't describe all.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your best. Highly qualified and experienced engineers will take the interview. Be prepared to face some really tough questions. Think 100 times before you answer any question.
All the best.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Explain compression test of concrete
  • Ans. 

    Compression test of concrete is a method to determine the compressive strength of concrete.

    • A cylindrical sample of concrete is prepared and placed in a compression testing machine.

    • The machine applies a load at a constant rate until the sample fails.

    • The maximum load that the sample can bear before failure is recorded as the compressive strength of the concrete.

    • The test is important to ensure the quality and durability o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just grabs more knowledge to keep growing and fix for goal ambition and create a path and just work on it to get success.

I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cement test ,initially setting time
  • Q2. Cube mould size
  • Ans. 

    Cube mould size is a standard size used for testing the compressive strength of concrete.

    • Cube moulds are typically made of steel or cast iron.

    • The standard size for cube moulds is 150mm x 150mm x 150mm.

    • Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.

    • The moulds are filled with concrete and left to cure before being tested for compressive strength.

    • Cube moulds are used to ensure that the c...

  • Answered by AI
  • Q3. 1m. 8mm Dia steel rod weight,how to calculate
  • Ans. 

    To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.

    • Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length

    • Find the density of steel, which is typically around 7850 kg/m^3

    • Multiply the volume by the density to get the weight of the rod

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical strong.This interview was both knowledge and communication between sub contractor and engineer. Most of the questions related to diploma circling.
Contribute & help others!
anonymous
You can choose to be anonymous

Simplex Infrastructures Interview FAQs

How many rounds are there in Simplex Infrastructures Civil Site Engineer interview?
Simplex Infrastructures interview process usually has 2 rounds. The most common rounds in the Simplex Infrastructures interview process are Technical and HR.
What are the top questions asked in Simplex Infrastructures Civil Site Engineer interview?

Some of the top questions asked at the Simplex Infrastructures Civil Site Engineer interview -

  1. What is dia of six...read more
  2. What is formula of ...read more
  3. What is leveli...read more

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

SALARIES

Tata Technologies

SALARIES

Army Public School

INTERVIEWS

Simplex Infrastructures

No Interviews

INTERVIEWS

Simplex Infrastructures

No Interviews

INTERVIEWS

Sterling & Wilson

No Interviews

Tell us how to improve this page.

Simplex Infrastructures Civil Site Engineer Salary
based on 71 salaries
₹1.2 L/yr - ₹5.5 L/yr
6% less than the average Civil Site Engineer Salary in India
View more details

Simplex Infrastructures Civil Site Engineer Reviews and Ratings

based on 23 reviews

2.6/5

Rating in categories

3.5

Skill development

2.9

Work-life balance

3.2

Salary

3.4

Job security

3.5

Company culture

3.3

Promotions

3.4

Work satisfaction

Explore 23 Reviews and Ratings
Assistant Manager
213 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
154 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
153 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
135 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
111 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Simplex Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview