VRAJ INFRASTRUCTURE Civil Site Engineer Interview Questions, Process, and Tips

Updated 31 Jul 2020

VRAJ INFRASTRUCTURE Civil Site Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

9 Questions

  • Q1. What is the density of cement?
  • Ans. 

    The density of cement is typically around 1440 kg/m³.

    • The density of cement is a measure of its mass per unit volume.

    • It is commonly expressed in kilograms per cubic meter (kg/m³).

    • The density of cement can vary slightly depending on factors such as the type of cement and its composition.

    • For example, ordinary Portland cement typically has a density of around 1440 kg/m³.

    • Other types of cement, such as lightweight cement, ma...

  • Answered by AI
  • Q2. What is the density of bricks
  • Ans. 

    The density of bricks varies depending on the type of brick used.

    • The density of clay bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of concrete bricks ranges from 1,800 to 2,500 kg/m³.

    • The density of fly ash bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of sand-lime bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of fire bricks ranges from 2,000 to 2,500 kg/m³.

  • Answered by AI
  • Q3. If you have 10x10 feet room and you have 600x600 mm size tiles then how many tiles will required for that room?
  • Ans. 

    Approximately 278 tiles will be required for the 10x10 feet room.

    • Convert the room dimensions to the same unit as the tile size.

    • Calculate the area of the room.

    • Divide the room area by the tile area to get the number of tiles required.

    • Round up the result to the nearest whole number.

  • Answered by AI
  • Q4. What is the density of steel?
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is commonly measured in grams per cubic centimeter (g/cm³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is typically around 7.85 g/cm³.

    • Stainless steel, on the other hand, has a slightly lower density of around 7.75 g/cm³.

    • The density of steel is ...

  • Answered by AI
  • Q5. Cube test related questions?
  • Q6. Initial settings time of concrete?
  • Ans. 

    Initial setting time of concrete refers to the time taken for the concrete to change from a liquid state to a solid state.

    • Initial setting time is influenced by factors such as temperature, cement type, water-cement ratio, and admixtures.

    • The initial setting time is typically measured using the Vicat apparatus, where a needle is used to penetrate the concrete.

    • The initial setting time is important for construction activit...

  • Answered by AI
  • Q7. How many brick use in 1m3?
  • Ans. 

    The number of bricks used in 1m3 varies depending on the size of the bricks.

    • The size of the bricks affects the number of bricks used in 1m3.

    • Different brick sizes have different volumes.

    • To determine the number of bricks, divide the volume of 1m3 by the volume of a single brick.

  • Answered by AI
  • Q8. What is Concrete density?
  • Ans. 

    Concrete density refers to the mass per unit volume of concrete.

    • Concrete density is typically measured in kilograms per cubic meter (kg/m³).

    • It is an important property of concrete as it affects its strength, durability, and other mechanical properties.

    • The density of concrete can vary depending on the mix design, aggregates used, and the amount of air entrainment.

    • Normal weight concrete has a density ranging from 2200 to...

  • Answered by AI
  • Q9. What is development Length?
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are adequately embedded in the concrete to prevent slippage or failure.

    • The development length is typically specified in...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear all basic civil fundamental and field related questions

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Start to bottom rcc work up to finishing work
  • Q2. Finishing sequence(block work- concild zari -waterproof work-concild piping, electrical work- internal gypsum., dado work, painting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience of building &infrastructure execution work

I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to civil site or interior work also
Round 2 - Technical 

(1 Question)

  • Q1. Estimation & costing of materials related to civil works
  • Ans. 

    Estimation and costing of materials is a crucial aspect of civil engineering projects.

    • Estimation involves calculating the quantity of materials required for a project

    • Costing involves determining the cost of these materials

    • Factors such as market rates, transportation costs, and taxes must be considered

    • Software such as AutoCAD and Excel can be used for accurate estimation and costing

    • Regular updates and adjustments must b...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. To about my past work experience details
  • Q2. Ask me about my communication skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on your target and go hard untill success
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Start to end building finishing execution procedure Plaster procedure Wsterproofing procedure? Personal Qualifications? Family background? Living location?
  • Q2. University qualifications? Present job situation
  • Q3. Finishing sequence after complition of block madonary & RCC complition?
  • Q4. All educational certificate verification?

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain only work which you will be execution, Do job which is cable by yourself,
Do job Ownestly

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Round 1 - Technical 

(1 Question)

  • Q1. Site civil work and steel BBS ,

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil site Engineer , all site of work
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process

VRAJ INFRASTRUCTURE Interview FAQs

How to prepare for VRAJ INFRASTRUCTURE Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at VRAJ INFRASTRUCTURE. The most common topics and skills that interviewers at VRAJ INFRASTRUCTURE expect are Building Construction, Building Material, Concrete, Finishing and Plastering.
What are the top questions asked in VRAJ INFRASTRUCTURE Civil Site Engineer interview?

Some of the top questions asked at the VRAJ INFRASTRUCTURE Civil Site Engineer interview -

  1. If you have 10x10 feet room and you have 600x600 mm size tiles then how many ti...read more
  2. What is the density of ceme...read more
  3. What is the density of ste...read more

Tell us how to improve this page.

VRAJ INFRASTRUCTURE Civil Site Engineer Salary
based on 41 salaries
₹1.5 L/yr - ₹4.6 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

VRAJ INFRASTRUCTURE Civil Site Engineer Reviews and Ratings

based on 9 reviews

3.6/5

Rating in categories

3.8

Skill development

3.3

Work-life balance

3.4

Salary

3.5

Job security

2.5

Company culture

2.7

Promotions

3.3

Work satisfaction

Explore 9 Reviews and Ratings
Civil Site Engineer
41 salaries
unlock blur

₹1.5 L/yr - ₹4.6 L/yr

Site Engineer
25 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Civil Engineer
8 salaries
unlock blur

₹3.5 L/yr - ₹5.5 L/yr

Senior Surveyor
6 salaries
unlock blur

₹3.5 L/yr - ₹4 L/yr

Junior Engineer Civil
6 salaries
unlock blur

₹1.2 L/yr - ₹2.5 L/yr

Explore more salaries
Compare VRAJ INFRASTRUCTURE with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Sobha

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview