I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.
The density of cement is typically around 1440 kg/m³.
The density of cement is a measure of its mass per unit volume.
It is commonly expressed in kilograms per cubic meter (kg/m³).
The density of cement can vary slightly depending on factors such as the type of cement and its composition.
For example, ordinary Portland cement typically has a density of around 1440 kg/m³.
Other types of cement, such as lightweight cement, ma...
The density of bricks varies depending on the type of brick used.
The density of clay bricks ranges from 1,800 to 2,200 kg/m³.
The density of concrete bricks ranges from 1,800 to 2,500 kg/m³.
The density of fly ash bricks ranges from 1,800 to 2,200 kg/m³.
The density of sand-lime bricks ranges from 1,800 to 2,200 kg/m³.
The density of fire bricks ranges from 2,000 to 2,500 kg/m³.
Approximately 278 tiles will be required for the 10x10 feet room.
Convert the room dimensions to the same unit as the tile size.
Calculate the area of the room.
Divide the room area by the tile area to get the number of tiles required.
Round up the result to the nearest whole number.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is commonly measured in grams per cubic centimeter (g/cm³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is typically around 7.85 g/cm³.
Stainless steel, on the other hand, has a slightly lower density of around 7.75 g/cm³.
The density of steel is ...
Initial setting time of concrete refers to the time taken for the concrete to change from a liquid state to a solid state.
Initial setting time is influenced by factors such as temperature, cement type, water-cement ratio, and admixtures.
The initial setting time is typically measured using the Vicat apparatus, where a needle is used to penetrate the concrete.
The initial setting time is important for construction activit...
The number of bricks used in 1m3 varies depending on the size of the bricks.
The size of the bricks affects the number of bricks used in 1m3.
Different brick sizes have different volumes.
To determine the number of bricks, divide the volume of 1m3 by the volume of a single brick.
Concrete density refers to the mass per unit volume of concrete.
Concrete density is typically measured in kilograms per cubic meter (kg/m³).
It is an important property of concrete as it affects its strength, durability, and other mechanical properties.
The density of concrete can vary depending on the mix design, aggregates used, and the amount of air entrainment.
Normal weight concrete has a density ranging from 2200 to...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are adequately embedded in the concrete to prevent slippage or failure.
The development length is typically specified in...
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
posted on 2 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Estimation and costing of materials is a crucial aspect of civil engineering projects.
Estimation involves calculating the quantity of materials required for a project
Costing involves determining the cost of these materials
Factors such as market rates, transportation costs, and taxes must be considered
Software such as AutoCAD and Excel can be used for accurate estimation and costing
Regular updates and adjustments must b...
I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 12 Sep 2022
posted on 2 Dec 2024
based on 9 reviews
Rating in categories
Civil Site Engineer
41
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Site Engineer
25
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Civil Engineer
8
salaries
| ₹3.5 L/yr - ₹5.5 L/yr |
Senior Surveyor
6
salaries
| ₹3.5 L/yr - ₹4 L/yr |
Junior Engineer Civil
6
salaries
| ₹1.2 L/yr - ₹2.5 L/yr |
JLL
CBRE
NoBroker
Sobha