VRAJ INFRASTRUCTURE Interview Questions, Process, and Tips

Updated 8 Jul 2022

Top VRAJ INFRASTRUCTURE Interview Questions and Answers

View all 9 questions

VRAJ INFRASTRUCTURE Interview Experiences

Popular Designations

3 interviews found

I applied via Naukri.com and was interviewed in Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

9 Questions

  • Q1. What is the density of cement?
  • Ans. 

    The density of cement is typically around 1440 kg/m³.

    • The density of cement is a measure of its mass per unit volume.

    • It is commonly expressed in kilograms per cubic meter (kg/m³).

    • The density of cement can vary slightly depending on factors such as the type of cement and its composition.

    • For example, ordinary Portland cement typically has a density of around 1440 kg/m³.

    • Other types of cement, such as lightweight cement, ma...

  • Answered by AI
  • Q2. What is the density of bricks
  • Ans. 

    The density of bricks varies depending on the type of brick used.

    • The density of clay bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of concrete bricks ranges from 1,800 to 2,500 kg/m³.

    • The density of fly ash bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of sand-lime bricks ranges from 1,800 to 2,200 kg/m³.

    • The density of fire bricks ranges from 2,000 to 2,500 kg/m³.

  • Answered by AI
  • Q3. If you have 10x10 feet room and you have 600x600 mm size tiles then how many tiles will required for that room?
  • Ans. 

    Approximately 278 tiles will be required for the 10x10 feet room.

    • Convert the room dimensions to the same unit as the tile size.

    • Calculate the area of the room.

    • Divide the room area by the tile area to get the number of tiles required.

    • Round up the result to the nearest whole number.

  • Answered by AI
  • Q4. What is the density of steel?
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • The density of steel is commonly measured in grams per cubic centimeter (g/cm³).

    • The density of steel can vary depending on the specific type and composition of the steel.

    • For example, the density of carbon steel is typically around 7.85 g/cm³.

    • Stainless steel, on the other hand, has a slightly lower density of around 7.75 g/cm³.

    • The density of steel is ...

  • Answered by AI
  • Q5. Cube test related questions?
  • Q6. Initial settings time of concrete?
  • Ans. 

    Initial setting time of concrete refers to the time taken for the concrete to change from a liquid state to a solid state.

    • Initial setting time is influenced by factors such as temperature, cement type, water-cement ratio, and admixtures.

    • The initial setting time is typically measured using the Vicat apparatus, where a needle is used to penetrate the concrete.

    • The initial setting time is important for construction activit...

  • Answered by AI
  • Q7. How many brick use in 1m3?
  • Ans. 

    The number of bricks used in 1m3 varies depending on the size of the bricks.

    • The size of the bricks affects the number of bricks used in 1m3.

    • Different brick sizes have different volumes.

    • To determine the number of bricks, divide the volume of 1m3 by the volume of a single brick.

  • Answered by AI
  • Q8. What is Concrete density?
  • Ans. 

    Concrete density refers to the mass per unit volume of concrete.

    • Concrete density is typically measured in kilograms per cubic meter (kg/m³).

    • It is an important property of concrete as it affects its strength, durability, and other mechanical properties.

    • The density of concrete can vary depending on the mix design, aggregates used, and the amount of air entrainment.

    • Normal weight concrete has a density ranging from 2200 to...

  • Answered by AI
  • Q9. What is development Length?
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are adequately embedded in the concrete to prevent slippage or failure.

    • The development length is typically specified in...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear all basic civil fundamental and field related questions

Top VRAJ INFRASTRUCTURE Civil Site Engineer Interview Questions and Answers

Q1. If you have 10x10 feet room and you have 600x600 mm size tiles then how many tiles will required for that room?
View answer (16)

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Round 1 - HR 

(1 Question)

  • Q1. About qualifications
Round 2 - Technical 

(2 Questions)

  • Q1. Basic civil engineering related question
  • Q2. Like design mix ratio and brick related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Everything is easy . Just work hard once you get into this field you wil get alot of knowledge

Technical Trainee Engineer Interview Questions asked at other Companies

Q1. What is production , what is production quality problem in line
View answer (1)

Interview Questionnaire 

1 Question

  • Q1. Explanation of BBS in details
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed report that provides information about the reinforcement steel required for a construction project.

    • BBS is prepared by civil engineers to ensure the proper placement and quantity of reinforcement steel in a structure.

    • It includes details such as the diameter, length, and shape of each reinforcement bar.

    • BBS helps in estimating the quantity of steel required and assi...

  • Answered by AI

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Jobs at VRAJ INFRASTRUCTURE

View all

Interview questions from similar companies

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

3 Questions

  • Q1. Why do you want to join the company
  • Ans. 

    I want to join the company because of its innovative projects and strong company culture.

    • I am impressed by the company's track record of successful projects.

    • I believe the company's values align with my own professional goals.

    • I am excited about the opportunity to work with a talented team of professionals.

    • I see great potential for growth and development within the company.

  • Answered by AI
  • Q2. Why should we choose you
  • Ans. 

    I am a dedicated and hardworking individual with relevant skills and experience.

    • I have a strong work ethic and am committed to delivering high-quality results.

    • I have relevant experience and skills that align with the requirements of the position.

    • I am a quick learner and adaptable to new environments.

    • I am passionate about the industry and eager to contribute to the team.

  • Answered by AI
  • Q3. What profile would you like to like to work in
  • Ans. 

    I would like to work in a marketing and communications profile.

    • Experience in creating marketing campaigns

    • Strong communication skills

    • Ability to analyze market trends and consumer behavior

    • Proficiency in social media and digital marketing

    • Collaboration with cross-functional teams

  • Answered by AI

Interview Preparation Tips

College Name: NIT Kurukshetra

Interview Questionnaire 

1 Question

  • Q1. About Yourself

Interview Preparation Tips

Round: Test
Experience: Test level was medium, as i also sat for mahindra, i found L&T test was harder than mahindra!
Tips: Just study RS agarwal

Round: Group Discussion
Experience: It was easy for me, coz i was aware about tips of GD
Tips: Be the leader, if possibleTalk in between, even if u dont know topic much
Duration: 20 minutes

Round: Interview
Experience: This question was damn easy for me, coz i can talk more based on my activities & resume
Tips: Dont hesitate, stay calm & describe yourself, but not family background

General Tips: Be yourself, no technical knowledge is required(depends on panel u get)
Skill Tips: ""
College Name: IIT Roorkee
Motivation: To get placed!

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same
Contribute & help others!
anonymous
You can choose to be anonymous

VRAJ INFRASTRUCTURE Interview FAQs

How many rounds are there in VRAJ INFRASTRUCTURE interview?
VRAJ INFRASTRUCTURE interview process usually has 2 rounds. The most common rounds in the VRAJ INFRASTRUCTURE interview process are HR and Technical.
How to prepare for VRAJ INFRASTRUCTURE interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at VRAJ INFRASTRUCTURE. The most common topics and skills that interviewers at VRAJ INFRASTRUCTURE expect are Site Engineering, Civil Engineering, Project Management, Accounting and Building Construction.
What are the top questions asked in VRAJ INFRASTRUCTURE interview?

Some of the top questions asked at the VRAJ INFRASTRUCTURE interview -

  1. If you have 10x10 feet room and you have 600x600 mm size tiles then how many ti...read more
  2. What is the density of ceme...read more
  3. What is the density of ste...read more

Recently Viewed

INTERVIEWS

Larsen & Toubro Limited

No Interviews

INTERVIEWS

J B Mangharam Foods

No Interviews

INTERVIEWS

Maruti Suzuki

No Interviews

SALARIES

VRAJ INFRASTRUCTURE

SALARIES

VRAJ INFRASTRUCTURE

REVIEWS

VRAJ INFRASTRUCTURE

No Reviews

REVIEWS

Sobha

No Reviews

SALARIES

VRAJ INFRASTRUCTURE

SALARIES

VRAJ INFRASTRUCTURE

SALARIES

VRAJ INFRASTRUCTURE

Tell us how to improve this page.

VRAJ INFRASTRUCTURE Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 425 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

VRAJ INFRASTRUCTURE Reviews and Ratings

based on 36 reviews

3.5/5

Rating in categories

3.4

Skill development

2.9

Work-life balance

3.1

Salary

3.2

Job security

3.0

Company culture

3.0

Promotions

3.2

Work satisfaction

Explore 36 Reviews and Ratings
Marketing Department

Rajkot

1-5 Yrs

Not Disclosed

HR Professional

Rajkot

1-6 Yrs

Not Disclosed

Admin

Rajkot

1-6 Yrs

Not Disclosed

Explore more jobs
Civil Site Engineer
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
25 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Surveyor
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer Civil
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare VRAJ INFRASTRUCTURE with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview