i
Aparna Constructions and Estates
Filter interviews by
I appeared for an interview in Nov 2022.
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Estimation and costing of materials is a crucial aspect of civil engineering projects.
Estimation involves calculating the quantity of materials required for a project
Costing involves determining the cost of these materials
Factors such as market rates, transportation costs, and taxes must be considered
Software such as AutoCAD and Excel can be used for accurate estimation and costing
Regular updates and adjustments must b...
Top trending discussions
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
Project planning management estimate and costing
I appeared for an interview in Sep 2024, where I was asked the following questions.
My favorite core subject is Structural Engineering, as it combines creativity with technical skills to design safe and efficient structures.
Structural Engineering focuses on analyzing and designing structures like bridges and buildings.
It involves understanding material properties, load distribution, and safety factors.
For example, designing a bridge requires knowledge of tension and compression forces.
I enjoy using so...
In five years, I envision myself as a senior civil site engineer, leading projects and mentoring junior engineers.
I aim to lead major infrastructure projects, such as bridges or highways, ensuring they meet safety and quality standards.
I plan to enhance my technical skills by obtaining certifications in project management and advanced engineering software.
I aspire to mentor junior engineers, sharing my knowledge and ex...
I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.
Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.
Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.
It allows users to monitor and synchronize changes made to linked models.
Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.
It can also be used to monitor changes to parame...
Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.
Open the host model and go to the 'Insert' tab.
Click on 'Link Revit' and select the model to be linked.
Choose the appropriate settings for the link, such as positioning and visibility.
Repeat the process for any additional models to be linked.
Save the host model to ensure the links are maintained.
They gave an architectural model to create a structural model
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
based on 3 interviews
Interview experience
based on 14 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Junior Engineer
104
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
99
salaries
| ₹4.2 L/yr - ₹9.2 L/yr |
Engineer
87
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
80
salaries
| ₹2.8 L/yr - ₹5.3 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties