I appeared for an interview before Oct 2023.
I expect a competitive salary based on my experience and qualifications. As for the working period, I am open to discussing and negotiating the number of days.
I am looking for a salary that reflects my expertise and the responsibilities of the senior civil engineer role.
I am open to discussing the salary range during the interview process.
Regarding the working period, I am flexible and willing to negotiate the number o...
I applied via Job Portal
Aparna Constructions and Estates interview questions for designations
Top trending discussions
OPC stands for Ordinary Portland Cement, which is a widely used type of cement in construction work.
OPC is a type of cement that is commonly used in the construction industry.
It is known for its high strength and durability.
OPC is made by grinding clinker, gypsum, and other materials.
It is used in various applications such as concrete, mortar, and plaster.
OPC is available in different grades, such as OPC 33, OPC 43, an
I applied via Referral
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
One meter is equal to 39.37 inches.
One meter is equivalent to 100 centimeters.
One inch is equal to 2.54 centimeters.
To convert meters to inches, multiply by 39.37 (100 * 2.54).
Steel density is typically around 7.85 g/cm^3.
Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel can vary depending on the specific alloy composition.
For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
The sequence of activities for aluminium (mivan) structure construction involves several steps.
Preparing the site and marking the layout
Constructing the foundation and footings
Erecting the aluminium formwork panels
Fixing reinforcement bars and embedment items
Pouring concrete into the formwork
Curing the concrete
Stripping the formwork
Finishing and cleaning the structure
The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.
Inspecting and correcting any defects or deficiencies
Installing finishes such as flooring, paint, and fixtures
Completing final electrical and plumbing work
Cleaning and tidying up the site
Obtaining necessary permits and certifications
Conducting final inspections
Handing over the comp
Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.
Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.
The test involves subjecting the waterproofing system to a specified water depth for a certain duration.
The duration of the test can vary depending on the project ...
The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.
The accepted rolling margin value can range from 2% to 5%.
It is important to consult project specifications and industry guidelines for the specific rolling margin value.
For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...
The unit weight of steel refers to the weight of a given volume of steel material.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel being used.
For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.
The unit weight of reinfo...
Some of the top questions asked at the Aparna Constructions and Estates Senior Civil Engineer interview -
based on 4 interviews
Interview experience
based on 3 reviews
Rating in categories
Assistant Engineer
196
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Junior Engineer
104
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
99
salaries
| ₹4.2 L/yr - ₹9.2 L/yr |
Engineer
87
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
80
salaries
| ₹2.8 L/yr - ₹5.3 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties