Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Aparna Constructions and Estates Team. If you also belong to the team, you can get access from here

Aparna Constructions and Estates Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 768 Reviews

Filter interviews by

Aparna Constructions and Estates Senior Civil Engineer Interview Questions and Answers

Updated 20 Oct 2024

Aparna Constructions and Estates Senior Civil Engineer Interview Experiences

4 interviews found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basics questions regarding slabs, areas, concreting
Round 3 - HR 

(2 Questions)

  • Q1. Again they did technical round, I don't understand that, why the hr do technical round
  • Q2. They asked how many experience, floor like silly questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Do only technical round by technical team as many time you want, don't do technical round by hr, this was worst interview in my career
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
-

I was interviewed before Oct 2023.

Round 1 - Technical 

(1 Question)

  • Q1. MD sir asked waterproofing related questions asked for terrace podium,balconies, toilets, sitouts etc...

Senior Civil Engineer Interview Questions Asked at Other Companies

Q1. Why reinforcement is provided alternative in column?
Q2. How much accepted 8mm to 10mm steel rod rolling margine value ?
Q3. Do you have idea about safety and safety rules at L&T?
asked in Dr. Reddy's
Q4. What is the estimated cost of 100 feet by 100 feet of office in t ... read more
Q5. What is the slump range for boom pressure?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Shuttering using steel bbs high rise building similar questions
Round 3 - HR 

(1 Question)

  • Q1. How much you expected salary and how many days working period
  • Ans. 

    I expect a competitive salary based on my experience and qualifications. As for the working period, I am open to discussing and negotiating the number of days.

    • I am looking for a salary that reflects my expertise and the responsibilities of the senior civil engineer role.

    • I am open to discussing the salary range during the interview process.

    • Regarding the working period, I am flexible and willing to negotiate the number o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be hard work and improve invovation skills
Round 1 - Technical 

(1 Question)

  • Q1. Civil Technical questions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and Negotiate
Round 3 - Behavioral 

(1 Question)

  • Q1. Past experience why select Our Organization

Interview Preparation Tips

Interview preparation tips for other job seekers - Go strong technical around prepare the technical around

Aparna Constructions and Estates interview questions for designations

 Civil Engineer

 (2)

 Senior Civil Foreman

 (1)

 Junior Engineer Civil

 (5)

 Civil Site Engineer

 (3)

 Assistant Engineer - Civil

 (1)

 Project Engineer - Civil

 (1)

 Civil Site Supervisor

 (1)

 Senior Engineer QS

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - One-on-one 

(6 Questions)

  • Q1. How many Concrete blocks is required for 100sft ?
  • Ans. 

    The number of concrete blocks required for 100sft depends on the size of the blocks and the thickness of the wall being built.

    • The number of concrete blocks needed can be calculated by dividing the total area (100sft) by the area of one block.

    • The size of the concrete block and the thickness of the wall will determine the number of blocks needed.

    • For example, if each concrete block is 1ft x 1ft and the wall is 4 inches th

  • Answered by AI
  • Q2. What is Concrete density?
  • Ans. 

    Concrete density is the mass per unit volume of concrete.

    • Concrete density is typically measured in kilograms per cubic meter (kg/m^3).

    • The density of normal concrete is around 2400 kg/m^3.

    • Higher density concrete, such as heavyweight concrete, can have densities up to 4000 kg/m^3.

    • Lightweight concrete, on the other hand, can have densities as low as 1600 kg/m^3.

  • Answered by AI
  • Q3. What is thickness for outer & inner walls Plastering?
  • Ans. 

    The thickness for outer and inner walls plastering typically ranges from 12mm to 20mm.

    • The thickness of plastering for outer walls is usually around 15mm to 20mm.

    • The thickness of plastering for inner walls is typically around 12mm to 15mm.

    • The thickness may vary based on the type of wall surface and the desired finish.

    • It is important to ensure proper curing and finishing for a durable and aesthetically pleasing result.

  • Answered by AI
  • Q4. Which formwork is used in all ur recently worked companies ?
  • Ans. 

    Various types of formwork have been used in my recently worked companies, including timber formwork, steel formwork, and aluminum formwork.

    • Timber formwork is commonly used for small to medium-sized projects due to its cost-effectiveness and flexibility.

    • Steel formwork is preferred for large and complex structures due to its durability and reusability.

    • Aluminum formwork is lightweight and easy to handle, making it suitabl

  • Answered by AI
  • Q5. What is the mix proportion of Plastering mortar?
  • Ans. 

    The mix proportion of plastering mortar typically consists of 1 part cement to 3-4 parts sand.

    • The mix proportion of plastering mortar is usually 1:3 or 1:4 (cement:sand)

    • The mix can also include lime to improve workability and durability

    • Water is added to achieve the desired consistency for application

    • Example: A common mix proportion for plastering mortar is 1 part cement, 3 parts sand, and water as needed

  • Answered by AI
  • Q6. How many materials required in 1m3 Plastering mortar?
  • Ans. 

    The materials required in 1m3 of plastering mortar include cement, sand, and water.

    • Cement is typically used in the ratio of 1:4 for plastering mortar.

    • Sand is used in the ratio of 3-4 times the amount of cement used.

    • Water is added as needed to achieve the desired consistency.

    • For example, for 1m3 of plastering mortar, you may need 0.25m3 of cement, 1m3 of sand, and water as needed.

  • Answered by AI
Round 2 - Aptitude Test 

Test was based on numerical, reasoning and verbal,Geometry,Profit & loss, Algebra, Simplication, trigonometry,Load calculation,etc

Round 3 - HR 

(5 Questions)

  • Q1. What are the roles & responsible in Recently worked company ?
  • Q2. They are analysing that Engineers are good consistency for their project work ?
  • Q3. Are you able to work in other states & countries ?
  • Q4. Will you able to work for 1-3 for our Sobha ltd company so you have to give ur contribution for gaining knowledge in Civil engineering technical world & to growth company also ?
  • Ans. 

    Yes, I am willing to work for 1-3 years at Sobha Ltd to contribute to the growth of the company and gain knowledge in the technical world of Civil engineering.

    • I am committed to continuous learning and professional development in the field of Civil engineering.

    • I understand the importance of gaining practical experience and knowledge to contribute effectively to the growth of the company.

    • I am excited about the opportunit...

  • Answered by AI
  • Q5. What are the designation in ur recently worked companies ?

Interview Preparation Tips

Topics to prepare for Sobha Senior Civil Engineer interview:
  • Civil engineering interview ques
  • User Experience
  • Labour Management
  • According to drawing
  • Civil engineering laws & code
  • Read Is standards
Interview preparation tips for other job seekers - Be always meditate on ur own way in Civil engineering technical world.🦁👍
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. BBS Mivan Shuttering
  • Q2. Regarding projects handled
Round 2 - HR 

(2 Questions)

  • Q1. Are you ready to work for 12 hours a day?
  • Q2. Are you ready to work at night also?
  • Ans. 

    Yes, I am ready to work at night as required for the job.

    • I am willing to work night shifts to meet project deadlines

    • I understand the importance of flexibility in the engineering field

    • I have previous experience working night shifts on construction projects

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job interview may b easy to moderate just be confident and review your Resume.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About your self
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Aluminium (mivan) structure sequence of activities?
  • Ans. 

    The sequence of activities for aluminium (mivan) structure construction involves several steps.

    • Preparing the site and marking the layout

    • Constructing the foundation and footings

    • Erecting the aluminium formwork panels

    • Fixing reinforcement bars and embedment items

    • Pouring concrete into the formwork

    • Curing the concrete

    • Stripping the formwork

    • Finishing and cleaning the structure

  • Answered by AI
  • Q2. Finishing worksequence of activities?
  • Ans. 

    The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.

    • Inspecting and correcting any defects or deficiencies

    • Installing finishes such as flooring, paint, and fixtures

    • Completing final electrical and plumbing work

    • Cleaning and tidying up the site

    • Obtaining necessary permits and certifications

    • Conducting final inspections

    • Handing over the comp

  • Answered by AI
  • Q3. Water proofing ponding test hours?
  • Ans. 

    Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.

    • Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.

    • The test involves subjecting the waterproofing system to a specified water depth for a certain duration.

    • The duration of the test can vary depending on the project ...

  • Answered by AI
  • Q4. How much accepted 8mm to 10mm steel rod rolling margine value ?
  • Ans. 

    The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.

    • The accepted rolling margin value can range from 2% to 5%.

    • It is important to consult project specifications and industry guidelines for the specific rolling margin value.

    • For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...

  • Answered by AI
  • Q5. Unit Weight of Steel?
  • Ans. 

    The unit weight of steel refers to the weight of a given volume of steel material.

    • The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • The specific unit weight of steel can vary depending on the type and grade of steel being used.

    • For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.

    • The unit weight of reinfo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1) Achieve your goals, give your best.
2) Don't do over thinking.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
No response

I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Earlier projects done
  • Ans. 

    I have worked on various civil engineering projects including construction of highways, bridges, and buildings.

    • Managed the construction of a 10 km highway project, ensuring timely completion and adherence to safety standards

    • Designed and supervised the construction of a 5-story commercial building, ensuring structural integrity and compliance with local regulations

    • Led a team of engineers in the construction of a pedestr...

  • Answered by AI
  • Q2. Which aggregate test done
  • Ans. 

    Various tests are done on aggregates, including sieve analysis, specific gravity, and absorption.

    • Sieve analysis determines the particle size distribution of the aggregate.

    • Specific gravity test measures the density of the aggregate compared to water.

    • Absorption test determines the amount of water absorbed by the aggregate.

    • Other tests include soundness test, crushing value test, and impact value test.

    • The results of these ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and have basic knowledge of the projects worked on earlier.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself
Round 2 - Technical 

(2 Questions)

  • Q1. Cutting length of beam
  • Ans. 

    Cutting length of a beam is the total length of the beam including the extra length required for bending and overlapping reinforcement.

    • Cutting length is calculated by adding the clear span of the beam to the development length of the reinforcement on both sides.

    • Extra length is added for bending and overlapping reinforcement to ensure proper strength and stability.

    • Proper calculation of cutting length is crucial for the ...

  • Answered by AI
  • Q2. Lapping zone in columns & beams
  • Ans. 

    Lapping zone in columns & beams refers to the overlapping area where two reinforcement bars are spliced together.

    • Lapping zone is typically located at the mid-height of the column or beam.

    • It is important to ensure proper lapping length and overlap to maintain structural integrity.

    • Lapping zone should be free from rust, oil, grease, or any other contaminants.

    • Proper anchorage length should be provided to prevent failure at...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Aparna Constructions and Estates Interview FAQs

How many rounds are there in Aparna Constructions and Estates Senior Civil Engineer interview?
Aparna Constructions and Estates interview process usually has 2-3 rounds. The most common rounds in the Aparna Constructions and Estates interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in Aparna Constructions and Estates Senior Civil Engineer interview?

Some of the top questions asked at the Aparna Constructions and Estates Senior Civil Engineer interview -

  1. Again they did technical round, I don't understand that, why the hr do technica...read more
  2. MD sir asked waterproofing related questions asked for terrace podium,balconies...read more
  3. They asked how many experience, floor like silly questi...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Aparna Constructions and Estates interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 122 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
Colliers India Interview Questions
3.9
 • 59 Interviews
Casagrand Interview Questions
3.8
 • 52 Interviews
Kalpataru Group Interview Questions
4.0
 • 49 Interviews
Rohan Builders Interview Questions
4.1
 • 40 Interviews
View all
Aparna Constructions and Estates Senior Civil Engineer Salary
based on 17 salaries
₹4.6 L/yr - ₹9.8 L/yr
9% more than the average Senior Civil Engineer Salary in India
View more details

Aparna Constructions and Estates Senior Civil Engineer Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

3.6

Skill development

3.2

Work-Life balance

4.0

Salary & Benefits

4.0

Job Security

4.0

Company culture

4.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 3 Reviews and Ratings
Assistant Engineer
197 salaries
unlock blur

₹2 L/yr - ₹6.4 L/yr

Junior Engineer
102 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Senior Engineer
86 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Engineer
83 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
83 salaries
unlock blur

₹2.5 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Aparna Constructions and Estates with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Godrej Properties

3.7
Compare

DLF

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview