I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Concrete is a composite material made of cement, water, aggregates, and sometimes admixtures, used in construction for its strength and durability.
Concrete is made by mixing cement, water, and aggregates like sand and gravel.
It hardens over time through a chemical process called hydration.
Different types of concrete can be used for various construction purposes, such as reinforced concrete for structures.
Admixtures can...
I applied via Campus Placement and was interviewed before Feb 2023. There was 1 interview round.
Answers to questions about type foundation, FAR, and weight per meter of rectangular bar.
1. Type foundation refers to the type of structure used to support a building or other construction.
2. FAR stands for Floor Area Ratio, which is the ratio of a building's total floor area to the size of the plot of land it is built on.
3. The weight per meter of a rectangular bar can be calculated by multiplying the cross-sectional
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
Aparna Constructions and Estates interview questions for designations
Top trending discussions
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
PCC stands for Plain Cement Concrete and RCC stands for Reinforced Cement Concrete.
PCC is a mixture of cement, sand, and coarse aggregates, used as a base for flooring, foundations, etc.
RCC is a combination of PCC and reinforcement bars, used in structural elements like beams, columns, slabs, etc.
PCC has a lower strength compared to RCC.
RCC provides better resistance against cracks and structural stability.
PCC is commo...
I was interviewed in Dec 2024.
The grade of concrete refers to its strength and is determined by the ratio of cement to sand to aggregate.
The grade of concrete is typically denoted by a number followed by the letter 'M', such as M20, M30, etc.
The number in the grade represents the compressive strength of the concrete in megapascals (MPa) after 28 days of curing.
For example, M20 concrete has a compressive strength of 20 MPa, while M30 concrete has a ...
The unit used for estimating painting work is square feet.
Square feet is commonly used to estimate the amount of paint needed for a project.
Other units like square meters can also be used depending on the region.
Calculations are based on the surface area to be painted.
RL in survey stands for Reduced Level, which is the vertical distance between a point and a reference point.
RL is used in surveying to determine the elevation of a point relative to a known reference point.
It is commonly used in construction projects to ensure accurate leveling of structures and surfaces.
RL can be calculated using leveling instruments such as a dumpy level or a theodolite.
For example, if a benchmark ha...
Types of cement include Portland cement, rapid-hardening cement, and sulfate-resistant cement.
Portland cement is the most common type and is used in general construction.
Rapid-hardening cement sets quickly and is often used in repair work.
Sulfate-resistant cement is used in areas where soil or water has high sulfate content.
The size of columns in civil engineering is determined based on the load they will support and the height of the structure.
Columns are sized based on the load they will support, with larger loads requiring larger columns.
The height of the structure also plays a role in determining column size, with taller structures requiring larger columns for stability.
Factors such as material strength, column spacing, and building c...
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge skills
Worked as a Project Engineer at a construction company for 5 years.
Managed multiple civil engineering projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Performed site inspections and quality control checks
Prepared project schedules and budgets
Resolved any issues or conflicts that arose during construction
2 Interview rounds
based on 11 reviews
Rating in categories
Assistant Engineer
191
salaries
| ₹2 L/yr - ₹6.4 L/yr |
Junior Engineer
103
salaries
| ₹2 L/yr - ₹5 L/yr |
Senior Engineer
90
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Engineer
84
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Assistant Engineer - Civil
83
salaries
| ₹2.5 L/yr - ₹5.3 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF