i
Rohan Builders
Filter interviews by
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
posted on 27 Nov 2023
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
PCC stands for Plain Cement Concrete and RCC stands for Reinforced Cement Concrete.
PCC is a mixture of cement, sand, and coarse aggregates, used as a base for flooring, foundations, etc.
RCC is a combination of PCC and reinforcement bars, used in structural elements like beams, columns, slabs, etc.
PCC has a lower strength compared to RCC.
RCC provides better resistance against cracks and structural stability.
PCC is commo...
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 24 Aug 2024
posted on 22 Feb 2023
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
The sequence of activities for aluminium (mivan) structure construction involves several steps.
Preparing the site and marking the layout
Constructing the foundation and footings
Erecting the aluminium formwork panels
Fixing reinforcement bars and embedment items
Pouring concrete into the formwork
Curing the concrete
Stripping the formwork
Finishing and cleaning the structure
The finishing work sequence of activities involves the final steps in a construction project to complete the project and prepare it for use.
Inspecting and correcting any defects or deficiencies
Installing finishes such as flooring, paint, and fixtures
Completing final electrical and plumbing work
Cleaning and tidying up the site
Obtaining necessary permits and certifications
Conducting final inspections
Handing over the comp
Waterproofing ponding test hours determine the duration for which a waterproofing system can withstand water ponding.
Waterproofing ponding test hours measure the ability of a waterproofing system to resist water penetration under prolonged ponding conditions.
The test involves subjecting the waterproofing system to a specified water depth for a certain duration.
The duration of the test can vary depending on the project ...
The accepted rolling margin value for 8mm to 10mm steel rods varies depending on the specific project requirements and industry standards.
The accepted rolling margin value can range from 2% to 5%.
It is important to consult project specifications and industry guidelines for the specific rolling margin value.
For example, if the rolling margin value is set at 3%, a 10mm steel rod could have a diameter between 9.7mm and 10...
The unit weight of steel refers to the weight of a given volume of steel material.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel being used.
For example, the unit weight of structural steel is around 490 pounds per cubic foot or 7850 kilograms per cubic meter.
The unit weight of reinfo...
I was interviewed before Jun 2023.
Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.
Use measuring tape and chalk to mark the layout according to the blueprint
Calculate the column ring cutting length using the formula: 2 x π x radius + height
Ensure accuracy in measurements to avoid errors in construction
I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Senior Engineer
78
salaries
| ₹4.1 L/yr - ₹9 L/yr |
Safety Officer
78
salaries
| ₹2 L/yr - ₹6 L/yr |
Assistant Engineer
48
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
Junior Engineer
41
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Junior Engineer Civil
41
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF