I applied via Walk-in and was interviewed in Feb 2021. There were 4 interview rounds.
Quality refers to the degree of excellence or superiority of a product or service.
Quality is a measure of how well a product or service meets customer expectations and requirements.
It involves ensuring that the product or service is free from defects or errors.
Quality also includes factors such as reliability, durability, and performance.
Quality can be subjective and may vary depending on the context and industry.
Examp...
The tolerance of sand bulkage refers to the acceptable variation in the volume of sand when it is compacted.
Tolerance of sand bulkage is typically expressed as a percentage.
It is important to measure and control sand bulkage to ensure consistency in construction materials.
The acceptable tolerance may vary depending on the specific application and industry standards.
For example, in concrete production, the tolerance for...
QA focuses on preventing defects while QC focuses on identifying and fixing defects.
QA is a process-oriented approach that aims to prevent defects from occurring in the first place.
QC is a product-oriented approach that focuses on identifying defects in the final product.
QA involves activities such as planning, designing, and implementing processes to ensure quality.
QC involves activities such as testing, inspecting, a...
QMS stands for Quality Management System.
QMS is a set of policies, processes, and procedures required for planning and execution of quality control.
It ensures that products or services meet customer requirements and comply with regulations.
QMS includes activities such as quality planning, quality control, quality assurance, and quality improvement.
Examples of QMS include ISO 9001, Six Sigma, and Total Quality Managemen
I applied via Walk-in
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Referral
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Senior Engineer
87
salaries
| ₹4.1 L/yr - ₹9 L/yr |
Safety Officer
82
salaries
| ₹1.9 L/yr - ₹6 L/yr |
Assistant Engineer
48
salaries
| ₹3.5 L/yr - ₹6.5 L/yr |
Junior Engineer
43
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Junior Engineer Civil
41
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties