I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Answers to questions related to QA QC Engineer role
Shutdown is a temporary stoppage of a process while turnaround is a planned shutdown for maintenance
Pressure vessel parts include shell, head, nozzle, manhole, and support. Their functions vary from holding the process fluid to providing access for maintenance
Types of heat exchangers include shell and tube, plate and frame, and air-cooled
Distillation column is a proces...
Top trending discussions
I applied via Naukri.com
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
The question is about requirements for WPS PQR, piping, and tank RT.
WPS (Welding Procedure Specification) and PQR (Procedure Qualification Record) are required for welding processes.
Piping requirements include material selection, design, fabrication, installation, and testing.
Tank RT (Radiographic Testing) requirements involve inspecting welds and joints for defects using X-rays or gamma rays.
All of these requirements ...
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I was interviewed before Jun 2021.
DCA and PLC are commonly used acronyms in the field of engineering.
DCA stands for Direct Current Amplifier, which is a device used to amplify direct current signals.
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
DCA and PLC are essential components in various engineering applications such as industrial automation and control systems.
based on 3 interviews
Interview experience
based on 5 reviews
Rating in categories
Safety Officer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Supervisor
11
salaries
| ₹0 L/yr - ₹0 L/yr |
QC Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Energy Hydrocarbon
TechnipFMC
McDermott International
Essar Group