Q1. What are the materials you have worked in. Low alloy steel, P91, Monel

Ans.

I have worked with low alloy steel, P91, and Monel materials.

  • I have experience working with low alloy steel, which is commonly used in construction and manufacturing industries.

  • I have also worked with P91, a high-strength steel alloy often used in power plants and petrochemical industries.

  • Additionally, I have experience with Monel, a nickel-based alloy known for its corrosion resistance and high strength.

  • I am familiar with the properties, testing methods, and quality control ...read more

Q2. What is the difference of QA or QC and how manage of NCR

Ans.

QA focuses on preventing defects while QC focuses on identifying and correcting defects.

  • QA involves creating processes and procedures to prevent defects from occurring in the first place

  • QC involves testing and inspecting products or services to identify defects and correct them

  • NCR (Non-Conformance Report) is managed by identifying the root cause of the non-conformance, taking corrective action, and preventing recurrence

  • Effective management of NCR involves documenting the non-...read more

QA/QC Manager Interview Questions and Answers for Freshers

illustration image

Q3. What are the code of references for concrete Mix Design?

Ans.

ACI 211.1 is the code of reference for concrete mix design.

  • ACI 211.1 is the standard practice for selecting proportions for normal, heavyweight, and mass concrete based on specified compressive strength.

  • Other codes of reference include ASTM C94, which provides standard specifications for ready-mixed concrete.

  • The mix design should also consider factors such as workability, durability, and exposure conditions.

  • The mix design should be tested and adjusted as necessary to meet pro...read more

Q4. What is the salt content on the blasted surface on onshore area?

Ans.

The salt content on the blasted surface in onshore areas is determined through testing and analysis.

  • Salt content on the blasted surface can be measured using various methods such as conductivity meters, chloride ion tests, or salt spray tests.

  • The salt content is usually expressed in terms of parts per million (ppm) or milligrams per square meter (mg/m²).

  • High salt content on the blasted surface can lead to corrosion and affect the quality and durability of coatings or structur...read more

Are these interview questions helpful?

Q5. What are the different phases of the Software Testing Life Cycle (STLC)?

Ans.

STLC consists of phases like requirement analysis, test planning, test design, test execution, and test closure.

  • Requirement Analysis: Understanding the project requirements and defining the scope of testing.

  • Test Planning: Creating a test plan which includes test strategy, test objectives, and resource planning.

  • Test Design: Developing test cases and test scenarios based on requirements and design documents.

  • Test Execution: Running the test cases, reporting defects, and retestin...read more

Q6. How do you check the the verticality of a column? What is the acceptance criteria?

Ans.

To check the verticality of a column, use a plumb bob or laser level. Acceptance criteria: deviation within a specified tolerance.

  • Use a plumb bob or laser level to check if the column is perfectly vertical.

  • Ensure the plumb bob or laser level is aligned with the centerline of the column.

  • Measure the deviation from the vertical position and compare it to the specified tolerance.

  • Acceptance criteria may vary depending on the project or industry standards.

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. How to you ensure compliance with IS 1489:2015 in cement testing?

Ans.

Ensure compliance with IS 1489:2015 in cement testing by following standard procedures and conducting regular audits.

  • Implement standardized testing procedures outlined in IS 1489:2015 for cement testing

  • Conduct regular audits to ensure testing equipment is calibrated and maintained properly

  • Train staff on IS 1489:2015 requirements and provide ongoing education to stay updated

  • Document all testing procedures and results for traceability and accountability

Q8. What are some examples of severity and priority defects?

Ans.

Severity and priority defects are common in software testing, with severity referring to the impact on the system and priority referring to the urgency of fixing the defect.

  • Severity defect examples: critical functionality not working, system crash, security vulnerability

  • Priority defect examples: spelling errors in user interface, minor layout issues, low impact bugs

QA/QC Manager Jobs

Manager - QA/QC (Civil) 10-15 years
Power Mech Projects
3.9
Mirzapur
Sr. Manage/Manager - QA/QC-Jammu(Road Project) 20-30 years
Apco Infratech
3.7
Jammu
Manager QA/QC (Electrical) 10-15 years
L&T Integrated Engineering Services
3.3
Chennai

Q9. What are preventive action required before mass concrete

Ans.

Preventive actions before mass concrete include proper planning, testing, and monitoring.

  • Ensure proper mix design is in place

  • Conduct thorough testing of materials before pouring

  • Monitor temperature and curing conditions

  • Implement proper formwork and reinforcement

  • Consider using admixtures for better performance

Q10. What are the key Quality parameter in cement production?

Ans.

Key quality parameters in cement production include fineness, strength, setting time, and soundness.

  • Fineness: Determines the particle size of the cement, affecting its strength and setting time.

  • Strength: Indicates the compressive strength of the cement, crucial for construction durability.

  • Setting Time: Refers to the time taken for the cement to set and harden, impacting construction timelines.

  • Soundness: Measures the ability of the cement to not expand or crack after setting, ...read more

Q11. Civil infra structure. Did you worked in this Area.

Ans.

Yes, I have extensive experience working in civil infrastructure.

  • Managed QA/QC processes for various civil infrastructure projects

  • Ensured compliance with industry standards and regulations

  • Implemented quality control measures to improve project outcomes

  • Collaborated with engineers and contractors to address quality issues

  • Performed inspections and audits to verify quality of work

  • Examples: oversaw construction of bridges, roads, and buildings

Q12. Whats are various types of control panels?

Ans.

Control panels are used to monitor and control various systems. There are different types of control panels based on their application.

  • Motor control panels

  • PLC control panels

  • Process control panels

  • HVAC control panels

  • Lighting control panels

  • Instrumentation control panels

Q13. BestQuality mangmant policy at site how achieved.

Ans.

Best quality management policy at site achieved through a comprehensive approach.

  • Establishing clear quality objectives and targets

  • Implementing a quality management system

  • Providing regular training and development opportunities for staff

  • Conducting regular audits and inspections

  • Encouraging a culture of continuous improvement

  • Ensuring compliance with relevant regulations and standards

Q14. What are the material welding done by you.

Ans.

I have experience in welding materials such as carbon steel, stainless steel, and aluminum.

  • Welded carbon steel pipes for a water treatment plant

  • Welded stainless steel tanks for a pharmaceutical company

  • Welded aluminum frames for a solar panel manufacturer

Q15. what is get by role locator identification in playwright

Ans.

get by role locator identification in playwright is used to locate elements based on their role attribute

  • Used to locate elements based on their role attribute

  • Helps in identifying elements with specific roles such as button, link, etc.

  • Syntax: page.locator('role=value')

Q16. Difference between quality assurance & quality control

Ans.

Quality assurance focuses on preventing defects while quality control focuses on identifying and correcting defects.

  • Quality assurance is a proactive process that involves planning, designing, and implementing processes to prevent defects from occurring.

  • Quality control is a reactive process that involves identifying defects through inspections, testing, and analysis, and then correcting them.

  • Quality assurance is focused on the entire process, while quality control is focused o...read more

Q17. How would you handle ateam of labor category

Ans.

I would handle a team of labor category by setting clear expectations, providing training and support, monitoring performance, and addressing any issues promptly.

  • Set clear expectations for roles and responsibilities within the team

  • Provide necessary training and support to ensure team members are equipped to perform their tasks effectively

  • Monitor team performance regularly to identify any areas for improvement

  • Address any issues or conflicts within the team promptly to maintain...read more

Q18. What is the job responsibilities in stitching.

Ans.

Job responsibilities in stitching include sewing fabric pieces together to create garments or other textile products.

  • Operating sewing machines to stitch fabric pieces together

  • Following patterns or instructions to ensure proper stitching

  • Inspecting finished products for quality and accuracy

  • Repairing or altering garments as needed

  • Maintaining a clean and organized work area

  • Collaborating with designers or clients to meet specific requirements

Q19. How you will evaluate the CAPA

Ans.

CAPA evaluation involves verifying the effectiveness of corrective actions taken to prevent recurrence of non-conformities.

  • Verify if the root cause has been addressed

  • Check if the corrective action taken is appropriate

  • Ensure that the corrective action has been implemented

  • Evaluate the effectiveness of the corrective action

  • Review the CAPA process for continuous improvement

Q20. What do you understand by quality?

Ans.

Quality refers to the degree of excellence or superiority of a product or service.

  • Quality is meeting or exceeding customer expectations

  • It involves adherence to standards and specifications

  • Quality is achieved through continuous improvement and prevention of defects

  • It is a measure of the reliability, durability, and performance of a product or service

  • Examples of quality include a car that runs smoothly, a phone with a long battery life, or a restaurant with delicious food and e...read more

Q21. Area of improvement and process improvements

Ans.

Continuous improvement through data analysis and team collaboration

  • Implementing regular data analysis to identify trends and areas for improvement

  • Encouraging team members to provide feedback and suggestions for process enhancements

  • Conducting regular training sessions to keep team members updated on best practices

  • Utilizing quality management tools such as Six Sigma or Lean principles for process optimization

Q22. How to maintain best quality of project

Ans.

Maintaining best quality of project requires a comprehensive approach that includes planning, monitoring, and continuous improvement.

  • Establish clear quality standards and communicate them to all stakeholders

  • Develop a quality management plan that outlines the processes and procedures for ensuring quality

  • Monitor project progress regularly to identify and address quality issues

  • Implement quality control measures such as inspections, testing, and audits

  • Encourage a culture of quali...read more

Q23. What is gas chromatography?

Ans.

Gas chromatography is a technique used to separate and analyze volatile compounds in a sample.

  • A sample is vaporized and passed through a column filled with a stationary phase and a mobile phase.

  • The stationary phase interacts with the sample components, causing them to separate based on their chemical properties.

  • The separated components are detected and analyzed to determine their identity and quantity.

  • Gas chromatography is commonly used in forensic science, environmental anal...read more

Q24. How to plan the erection of materials in timely.

Ans.

To plan the erection of materials in a timely manner, it is important to create a detailed schedule, coordinate with suppliers, ensure proper resources are available, and regularly monitor progress.

  • Create a detailed schedule outlining the timeline for each phase of the erection process.

  • Coordinate closely with suppliers to ensure timely delivery of materials.

  • Ensure that all necessary resources, such as equipment and manpower, are available when needed.

  • Regularly monitor progres...read more

Q25. How to select cranes on the basis of weight

Ans.

Select cranes based on weight by considering crane capacity, load weight, and safety factors.

  • Consider the crane's maximum capacity rating

  • Calculate the weight of the load to be lifted

  • Factor in safety margins to ensure the crane can safely lift the load

  • Choose a crane with a capacity greater than the calculated load weight

Q26. Differentiate selection components and rejected components

Ans.

Selection components are approved for use, while rejected components are not approved due to failing quality standards.

  • Selection components meet quality standards and are approved for use in production.

  • Rejected components do not meet quality standards and are not approved for use.

  • Selection components are typically used in the manufacturing process.

  • Rejected components may need to be reworked or disposed of.

  • Examples: A selection component passes all quality tests and is used in...read more

Q27. Describe your knowledge about RM testing, PM testing and FG testing.

Ans.

I have extensive knowledge in RM testing, PM testing, and FG testing in the QA/QC field.

  • RM testing refers to testing of raw materials used in production to ensure they meet quality standards before being used in manufacturing.

  • PM testing involves testing of products during the production process to identify any defects or issues that may arise.

  • FG testing is the final stage of testing where finished products are inspected to ensure they meet quality specifications before being ...read more

Q28. How do you store the materials

Ans.

Materials are stored in designated areas based on type and requirements.

  • Materials are stored in designated areas based on type and requirements

  • Proper labeling and organization is maintained to ensure easy access and inventory control

  • Temperature and humidity control may be necessary for certain materials

  • Regular inspections and audits are conducted to ensure compliance with storage guidelines

Q29. explain the Underground Metro segment casting yard steam curing

Ans.

Underground Metro segment casting yard steam curing is a process used to accelerate the strength gain of concrete segments for tunnel construction.

  • Steam curing involves applying high temperature steam to the concrete segments to speed up the hydration process.

  • This method helps in achieving the required strength of the segments in a shorter time period.

  • Steam curing is often used in precast concrete production for underground structures like metro tunnels.

  • Proper monitoring and ...read more

Q30. What electrode will be used A 36 steel?

Ans.

The electrode used for A36 steel is typically E7018.

  • E7018 electrode is commonly used for welding A36 steel due to its high tensile strength and excellent weldability.

  • It provides good penetration and produces strong, clean welds.

  • Other suitable electrodes for A36 steel include E6010, E6011, and E6013.

  • The choice of electrode depends on the specific welding requirements and conditions.

Q31. How can handle the fabric store.

Ans.

Handle the fabric store by ensuring quality control of fabrics, managing inventory, and overseeing production processes.

  • Implement quality control measures to ensure fabrics meet standards

  • Manage inventory to prevent stockouts and overstocking

  • Oversee production processes to ensure timely delivery of products

  • Train staff on quality control procedures and best practices

  • Maintain relationships with suppliers to ensure timely delivery of materials

Q32. What is the guidelines for finishing.

Ans.

Guidelines for finishing include ensuring all work meets quality standards, completing tasks on time, and following proper procedures.

  • Ensure all work meets quality standards set by the company or industry regulations

  • Complete tasks on time to meet project deadlines

  • Follow proper procedures and protocols for finishing work, including documentation and reporting

  • Inspect finished products for defects or issues before final approval

  • Communicate with team members and supervisors to ad...read more

Q33. What is the needle detector machine.

Ans.

A needle detector machine is a device used to detect any metal needles or contaminants in products such as food, textiles, or pharmaceuticals.

  • Needle detector machines use electromagnetic fields to identify metal contaminants in products.

  • They are commonly used in industries such as food processing, garment manufacturing, and pharmaceutical production.

  • The machine alerts the operator if a metal needle or fragment is detected in the product being scanned.

  • Needle detector machines ...read more

Q34. What is the process to audit in packing.

Ans.

The process to audit in packing involves inspecting packaging materials, verifying labeling accuracy, and ensuring proper storage and handling.

  • Inspect packaging materials for quality and integrity

  • Verify labeling accuracy and adherence to regulatory requirements

  • Ensure proper storage and handling practices are followed

  • Document audit findings and communicate any issues to relevant stakeholders

Q35. What is the role in cutting section.

Ans.

The role in cutting section involves overseeing the cutting process to ensure accuracy and quality of cuts.

  • Supervising cutting operators to ensure they follow proper procedures

  • Inspecting cut pieces for accuracy and quality

  • Adjusting cutting equipment as needed for optimal performance

  • Maintaining records of cutting activities and results

Q36. HOW WILL YOU HANDLE CUSTOMER COMPLAINT

Ans.

I will listen to the customer, investigate the issue, and provide a timely resolution.

  • Acknowledge the customer's complaint and apologize for any inconvenience caused.

  • Ask the customer for specific details about the issue and document the complaint.

  • Investigate the issue thoroughly and identify the root cause.

  • Provide a timely resolution to the customer and follow up to ensure satisfaction.

  • Implement corrective actions to prevent similar issues from occurring in the future.

Q37. What is the purpose of pedestal?

Ans.

A pedestal is a support structure used to elevate or display an object.

  • Supports and elevates objects

  • Used for displaying statues, vases, or other decorative items

  • Provides stability and height for various purposes

Q38. What is quality plan

Ans.

A quality plan is a document that outlines the quality objectives, processes, and procedures for a project or organization.

  • Defines quality objectives and standards

  • Outlines processes and procedures for achieving quality

  • Identifies roles and responsibilities for quality management

  • Includes quality control and quality assurance measures

  • May include testing and inspection plans

  • Examples: ISO 9001, Six Sigma, Lean Manufacturing

Q39. How do you address a defect cycle

Ans.

Addressing a defect cycle involves identifying, analyzing, resolving, and preventing defects in a systematic manner.

  • Identify the root cause of the defect by analyzing the issue thoroughly

  • Develop a corrective action plan to resolve the defect

  • Implement the corrective action plan and monitor its effectiveness

  • Conduct regular quality audits to prevent future defects

  • Utilize quality tools such as Pareto analysis, fishbone diagrams, and 5 Whys to aid in defect resolution

  • Provide train...read more

Q40. Explain how to manage QAQC job

Ans.

Managing QAQC job involves planning, implementing, and monitoring quality control measures to ensure compliance with standards.

  • Develop and implement quality control procedures

  • Train and supervise staff on quality control measures

  • Monitor and analyze quality control data

  • Identify and address quality control issues

  • Collaborate with other departments to ensure compliance with standards

  • Continuously improve quality control processes

  • Maintain documentation and records of quality control...read more

Q41. Why keep the contamination box.

Ans.

The contamination box is kept to prevent the spread of contaminants and maintain a clean working environment.

  • Prevents cross-contamination between different samples or materials

  • Helps maintain a sterile environment for sensitive processes

  • Ensures compliance with quality control standards and regulations

  • Can be used to safely dispose of hazardous materials

Q42. How many types of Steel test ?

Ans.

There are several types of steel tests including tensile test, hardness test, impact test, and bend test.

  • Tensile test measures the strength of steel by pulling it until it breaks.

  • Hardness test determines the resistance of steel to indentation or scratching.

  • Impact test evaluates the toughness of steel by subjecting it to sudden loading.

  • Bend test assesses the ductility of steel by bending it to a specific angle without fracturing.

Q43. what is the company policy

Ans.

The company policy is to prioritize quality and safety in all aspects of operations.

  • The company has a strict quality control process in place

  • All employees are trained on quality and safety procedures

  • Regular audits are conducted to ensure compliance with regulations

  • Continuous improvement is encouraged to enhance quality and safety

  • Customer satisfaction is a top priority

Q44. How you evaluate the CCF

Ans.

CCF can be evaluated by analyzing the root cause of the failure and implementing corrective actions.

  • Evaluate the root cause of the failure

  • Identify the contributing factors

  • Implement corrective actions to prevent future failures

  • Review and update the CCF process regularly

Q45. multiple ways to trigger jobs in github / jenkins

Ans.

Multiple ways to trigger jobs in GitHub/Jenkins

  • Using webhooks in GitHub to trigger Jenkins jobs

  • Using Jenkins pipeline to schedule jobs at specific times

  • Manually triggering jobs in Jenkins through the UI or CLI

  • Using GitHub Actions to trigger workflows in response to events

Q46. How do you gear nomenclatures?

Ans.

Gearing nomenclatures involves assigning unique names or codes to different types of gears for easy identification and tracking.

  • Assign unique names or codes to each type of gear

  • Ensure the nomenclature is consistent and easy to understand

  • Include information such as gear type, size, and material in the nomenclature

  • Use a standardized system for nomenclature across the organization

  • Regularly review and update the nomenclature as needed

Q47. Final protocalls for project hand over.

Ans.

Final protocols for project handover involve documentation, verification, and communication.

  • Ensure all project deliverables are completed and meet quality standards

  • Document all project processes, procedures, and outcomes for future reference

  • Verify that all project requirements have been met before handover

  • Communicate effectively with stakeholders to ensure a smooth transition

  • Provide training and support to the receiving team for a successful handover

Q48. How to close the NCR

Ans.

To close an NCR, identify root cause, implement corrective actions, verify effectiveness, and document closure.

  • Identify the root cause of the non-conformance

  • Implement corrective actions to address the root cause

  • Verify the effectiveness of the corrective actions

  • Document the closure of the NCR

Q49. What is FSMS,HACCP,QMS EHS

Ans.

FSMS, HACCP, QMS, and EHS are all management systems used in various industries to ensure food safety, quality, environmental health, and safety standards.

  • FSMS - Food Safety Management System ensures that food is safe for consumption by implementing controls throughout the food supply chain.

  • HACCP - Hazard Analysis and Critical Control Points is a systematic preventive approach to food safety that identifies, evaluates, and controls hazards.

  • QMS - Quality Management System focu...read more

Q50. Tell about QA and QC

Ans.

QA (Quality Assurance) focuses on preventing defects in the process, while QC (Quality Control) focuses on identifying defects in the product.

  • QA involves processes and procedures to ensure quality standards are met

  • QC involves testing and inspection to identify defects in the product

  • QA is proactive, while QC is reactive

  • Examples: QA - creating quality standards, QC - product testing

1
2
Next
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.0
 • 642 Interviews
4.1
 • 120 Interviews
4.2
 • 45 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

QA/QC Manager Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter