Filter interviews by
Piping welding precautions and procedures involve ensuring proper safety measures, selecting appropriate materials, and following industry standards.
Ensure proper ventilation in the welding area to prevent exposure to harmful fumes.
Use personal protective equipment such as gloves, goggles, and welding helmets.
Inspect the welding equipment regularly to ensure it is in good working condition.
Follow proper welding techniq...
Columns and trays are essential components in distillation processes for separating different components of a mixture.
Types of columns include packed columns and plate columns
Packed columns have packing material to increase surface area for separation
Plate columns have trays or plates to facilitate separation
Trays can be bubble cap trays, sieve trays, or valve trays
Completion of project
posted on 12 May 2018
I applied via Recruitment Consultant and was interviewed in Jan 2018. There were 5 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
I am a dedicated Maintenance Engineer with a strong background in mechanical and electrical systems.
Experienced in troubleshooting and repairing machinery
Skilled in preventive maintenance practices
Familiar with PLC programming and automation systems
Strong attention to detail and problem-solving skills
Seeking new challenges and opportunities for growth in a dynamic work environment.
Looking for new challenges and opportunities for professional growth
Interested in working in a more dynamic and innovative work environment
Seeking a position with more responsibilities and opportunities to learn new skills
I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.
To identify if a pump is cavitating while working on a DCS panel, you can look for certain indicators.
Monitor the pump's suction pressure. If it is fluctuating or dropping below the specified range, it may indicate cavitation.
Check the pump's discharge pressure. If it is higher than normal, it could be a sign of cavitation.
Listen for unusual noises such as a rattling or grinding sound coming from the pump.
Inspect the p...
To prepare a hydrocarbon vessel for vessel entry, follow these steps:
Ensure the vessel is properly isolated from the process and all sources of energy
Ventilate the vessel to remove any flammable or toxic gases
Perform a thorough inspection of the vessel for any signs of leaks or damage
Implement proper lockout/tagout procedures to prevent accidental activation of equipment
Provide appropriate personal protective equipment...
I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.
My GD topic was renewable energy.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and C++
Seeking new challenges and growth opportunities at GAIL.
Desire for new challenges and opportunities for growth
Interested in working in a different industry or with different technologies
Attracted to GAIL's reputation and projects
Seeking a more collaborative and innovative work environment
My parents are both retired now, but my father used to work as a civil engineer and my mother was a teacher.
Father worked as a civil engineer
Mother was a teacher
Both are retired now
Yes, I have visited Delhi earlier for a business trip.
Visited Delhi for a business trip
Explored historical sites like Red Fort and Qutub Minar
Enjoyed local cuisine like butter chicken and chaat
I am staying at a hotel in Sector 18, Noida for the interview process.
Staying at a hotel in Sector 18, Noida
Close to the interview location
Comfortable accommodation for the duration of the process
Decoking process involves removing coke deposits from cracking furnace and naphtha circuit to maintain efficiency.
Decoking process involves burning off coke deposits using controlled combustion.
Mechanical decoking involves using high-pressure water jets to remove coke deposits.
Chemical decoking involves using solvents or acids to dissolve coke deposits.
Regular decoking is essential to prevent blockages and maintain fur
Refrigeration cycles are thermodynamic processes used in refrigerators and air conditioners to transfer heat from a low temperature reservoir to a high temperature reservoir.
Refrigeration cycles typically involve four main components: compressor, condenser, expansion valve, and evaporator.
The refrigerant undergoes a cycle of compression, condensation, expansion, and evaporation to absorb heat from the space being coole...
Safety procedures before starting a hot job include obtaining a hot work permit, conducting a hazard assessment, ensuring proper ventilation, and having fire extinguishing equipment nearby.
Obtain a hot work permit before starting any hot job
Conduct a hazard assessment to identify potential risks
Ensure proper ventilation in the work area to prevent buildup of flammable gases
Have fire extinguishing equipment nearby and r
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 6 interview rounds.
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Behavioral questions and resume delve
Pmi - product management information
posted on 18 Oct 2023
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 3 interview rounds.
Knowledge of the English language, its vocabulary and comprehension. Ability to solve basic mathematical problem, which shows the capacity to use an analytical approach to everyday puzzles.
posted on 25 Jan 2022
I applied via Recruitment Consultant and was interviewed in Aug 2021. There was 1 interview round.
I applied via Company Website and was interviewed before Aug 2023. There was 1 interview round.
Well integrity and well barrier elements are crucial components in ensuring the safety and efficiency of oil and gas wells.
Well integrity refers to the ability of a well to contain fluids within the intended zones and prevent any leaks or failures.
Well barrier elements are physical or mechanical barriers that are put in place to prevent the escape of fluids from the wellbore.
Examples of well barrier elements include ca...
Upstream processes involve exploration, drilling, and production of oil and gas.
Exploration: Involves searching for potential oil and gas reserves using seismic surveys and other techniques.
Drilling: Once a potential reserve is identified, wells are drilled to extract the oil and gas.
Production: Oil and gas are extracted from the wells and processed for distribution.
Examples: Offshore drilling in the Gulf of Mexico, sh
No conflicts with supervisor or others.
I have not had any conflicts with my supervisor or colleagues.
I believe in open communication and resolving issues professionally.
I prioritize teamwork and collaboration to prevent conflicts from arising.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Safety Officer
34
salaries
| ₹3.3 L/yr - ₹12.8 L/yr |
Planning Engineer
15
salaries
| ₹6 L/yr - ₹24 L/yr |
QA QC Engineer
12
salaries
| ₹10.5 L/yr - ₹18 L/yr |
Mechanical Supervisor
11
salaries
| ₹4.3 L/yr - ₹15 L/yr |
QC Engineer
9
salaries
| ₹10 L/yr - ₹12 L/yr |
Reliance Industries
Indian Oil Corporation
Shell
Bharat Petroleum