Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u...
read moreAnswering questions related to QA QC Engineer position
If material is purchased from any factory, I will ensure that it meets the required specifications and standards
I can work for 8-10 hours a day depending on the workload
I am familiar with plant calibration procedures and can perform them
The borrow area will be selected based on factors such as soil type, distance from the construction site, and availability
I manage my juniors by delegating tasks, providing guidance, and mo...read more
Q2. What are the tests you have done
I have conducted various tests to ensure quality and compliance.
Functional testing to verify that the software meets the specified requirements
Regression testing to ensure that new changes do not introduce defects in existing functionality
Performance testing to evaluate the system's responsiveness and stability under different loads
Usability testing to assess the user-friendliness and intuitiveness of the software
Security testing to identify vulnerabilities and ensure data pr...read more
QA QC Engineer Interview Questions and Answers for Freshers
Q3. What Types of admixture generally used in concrete?
Admixtures are used in concrete to enhance its properties. Common types include water reducers, accelerators, and air-entraining agents.
Water reducers: reduce the amount of water needed for workability without affecting strength
Accelerators: speed up the setting and hardening process
Air-entraining agents: create small air bubbles to improve freeze-thaw resistance
Retarders: delay the setting time
Superplasticizers: improve workability and reduce water content
Corrosion inhibitor...read more
Q4. What do you check beam,columns and slab casting?
In beam, column, and slab casting, QA QC engineers check for proper reinforcement, formwork, concrete mix, curing, and dimensions.
Check reinforcement placement and spacing to ensure it meets design requirements.
Inspect formwork for proper alignment, stability, and adequate support.
Verify the concrete mix design and ensure proper pouring and compaction techniques are followed.
Monitor curing methods to ensure the concrete achieves the desired strength and durability.
Measure and...read more
Q5. 1.What is the difference between shutdown and turnaround? 2.Explain about pressure vessel parts and its function? 3.What are the types of heat exchanger? 4.Explain about distillation column? 5.What is the purpo...
read moreAnswers to questions related to QA QC Engineer role
Shutdown is a temporary stoppage of a process while turnaround is a planned shutdown for maintenance
Pressure vessel parts include shell, head, nozzle, manhole, and support. Their functions vary from holding the process fluid to providing access for maintenance
Types of heat exchangers include shell and tube, plate and frame, and air-cooled
Distillation column is a process equipment used to separate components of a mixture based...read more
Q6. In which code you are proficient, ASME, IS, BSEN, ISO standerd.
I am proficient in ASME and ISO standards.
I have extensive knowledge of ASME B31.3 and B31.1 codes for piping and pressure vessels.
I am also well-versed in ISO 9001 quality management system standards.
I have experience in implementing and maintaining quality control procedures based on these standards.
I am familiar with IS and BSEN standards, but not as proficient as ASME and ISO.
Share interview questions and help millions of jobseekers 🌟
Q7. How to check quality of cement?
The quality of cement can be checked through various tests and inspections.
Perform physical tests like fineness, setting time, and soundness.
Conduct chemical tests to analyze the composition and properties.
Check for consistency, compressive strength, and durability.
Inspect the packaging and labeling for proper identification.
Verify compliance with relevant standards and specifications.
Q8. How do you determine the grade of the received concrete at the site (Before Unloading from TM)?
The grade of received concrete at the site can be determined by checking the documentation, conducting visual inspections, and performing tests.
Check the documentation provided by the supplier, which should mention the grade of the concrete.
Conduct visual inspections to assess the appearance and consistency of the concrete. Different grades may have different characteristics.
Perform tests such as slump test, compressive strength test, or air content test to determine the grad...read more
QA QC Engineer Jobs
Q9. What is the codecs we use for video and audio formats?
Codecs used for video and audio formats vary depending on the specific format.
H.264 is commonly used for video compression in MP4 and AVI formats
AAC is a popular audio codec used in MP4 and other formats
VP9 is used for video compression in WebM format
Opus is a popular audio codec used in WebM and other formats
Q10. gauges you have used and what kind of software you have used?
I have used various gauges and software for QA QC engineering.
I have used calipers to measure dimensions of parts.
I have used micrometers to measure thickness and diameter of materials.
I have used pressure gauges to measure pressure in systems.
I have used temperature gauges to measure temperature in different environments.
I have used torque wrenches to measure the torque applied to fasteners.
I have used coordinate measuring machines (CMM) to measure the dimensions of complex ...read more
Q11. 1. All kinds of refractory application and Supervision, 2. How many types of refractory testing, 3. How to ensure the perfect brick lining, 4. How to ensure the quality control of refractory casting method, gun...
read moreThe interview question is about refractory application, testing, brick lining, quality control, and the responsibilities of an inspector and supervisor.
Refractory application and supervision involve knowledge of different types of refractory materials and their properties.
There are several types of refractory testing, including thermal conductivity, porosity, and compressive strength testing.
To ensure perfect brick lining, factors such as proper selection of refractory materi...read more
Q12. What would you do when 3 or 4 loads of concrete is rejected due to unstable slump?
I would investigate the root cause of the unstable slump and take corrective actions.
Check the concrete mix design and adjust if necessary
Verify the calibration of the slump cone and test equipment
Inspect the batching and mixing process for errors
Consult with concrete supplier and adjust delivery schedule
Notify project management and stakeholders of delays
Ensure proper disposal of rejected concrete
Implement preventive measures to avoid future rejections
Q13. what are different measuring instruments their least count? how to use, hands-on experience on instruments
Different measuring instruments and their least count, along with hands-on experience.
Vernier caliper - 0.02 mm
Micrometer screw gauge - 0.01 mm
Dial gauge - 0.01 mm
Height gauge - 0.02 mm
Thread pitch gauge - 0.01 mm
Using instruments requires proper calibration and handling
Hands-on experience can be gained through practice and training
Q14. What is tolerance of Cover Block? Why we take 03nos of pieces(01 sample) in cubes, steel testing ? Why we are soil filling in maximum 300mm layer?
Explaining tolerance of cover block, number of samples in cubes and soil filling in layers.
Tolerance of cover block is the permissible deviation from the specified dimension.
We take 03nos of pieces in cubes for steel testing to ensure accuracy and consistency.
Soil filling in maximum 300mm layer is done to ensure proper compaction and avoid settlement issues.
Q15. What is material specification for piping, forgings fittings tubes fasteners for MS materials
Material specifications for piping, forgings, fittings, tubes, and fasteners for MS materials include ASTM standards and specific grades.
ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A105/A105M - Standard Specification for Carbon Steel Forgings for Piping Applications
ASTM A234/A234M - Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
A...read more
Q16. Where do we refer the remaining chemical composition for SA-516 Gr. 70 plates
Refer to ASME Section II Part A for remaining chemical composition of SA-516 Gr. 70 plates
Refer to ASME Section II Part A for detailed chemical composition
Check the material test report (MTR) for specific chemical composition
Consult with the manufacturer or supplier for any additional information
Q17. Is code for all material Testing Procedure?
No, code is not applicable for all material testing procedures.
Code is primarily used for software testing, not material testing.
Material testing procedures involve physical tests and measurements.
Examples of material testing procedures include tensile testing, hardness testing, and impact testing.
Q18. How to check reinforcement as per drawing u have got any problem in slab steel how to solve.
To check reinforcement as per drawing, use measuring tape and compare with the drawing. If there is a problem in slab steel, check for any missing bars or incorrect placement.
Use measuring tape to check the length and diameter of reinforcement bars
Compare the measurements with the drawing to ensure they match
Check for any missing bars or incorrect placement
If there is a problem, consult the structural engineer for a solution
Q19. What is full form of GSA testing.
GSA testing stands for General Services Administration testing.
GSA testing is a process of evaluating products and services to ensure they meet the standards set by the General Services Administration.
It is commonly used in government procurement to ensure that products and services meet the required specifications.
GSA testing can include a variety of tests, such as performance testing, durability testing, and safety testing.
Examples of products that may undergo GSA testing i...read more
Q20. How do you manage project documentation and ensure that all necessary tests and inspections are completed?
I use a systematic approach to manage project documentation and ensure completion of all tests and inspections.
Create a detailed project plan outlining all necessary tests and inspections
Assign responsibilities to team members for each test and inspection
Regularly review and update project documentation to track progress
Utilize project management tools to organize and track tests and inspections
Conduct regular meetings to discuss any issues or delays in completing tests and i...read more
Q21. If a contractor insists on using substandard materials despite approval rejection, how would you handle the situation?
I would escalate the issue to higher management and document all communication for record keeping.
Communicate the issue to the contractor and explain the reasons for rejection of the materials.
Consult with the project manager or higher management for guidance on how to proceed.
Document all communication with the contractor regarding the substandard materials for record keeping.
If necessary, involve legal department or regulatory authorities to address the issue.
Ensure that th...read more
Q22. What is the significance of IS codes (Indian Standards) or other relevant standards in QA/QC for civil engineering?
IS codes or other relevant standards play a crucial role in ensuring quality and safety in civil engineering projects.
IS codes provide guidelines for materials, construction practices, and quality control measures in civil engineering projects.
Following IS codes helps in ensuring that the structures are built to withstand various loads and environmental conditions.
Adherence to relevant standards helps in achieving uniformity and consistency in construction practices.
Standards...read more
Q23. What is Stainless Steel, what's the melting point of iron, Iron carbon diagram related questions, chemicals composition
Stainless steel is a corrosion-resistant alloy made of iron, carbon, and other elements. Iron has a melting point of 1538°C.
Stainless steel is an alloy of iron, carbon, and other elements like chromium, nickel, and molybdenum.
It is known for its corrosion resistance and durability.
Iron has a melting point of 1538°C.
The iron-carbon diagram shows the relationship between carbon content and the properties of steel.
The chemical composition of stainless steel varies depending on t...read more
Q24. How to check brick and plaster and tiles work?
Brick, plaster, and tile work can be checked by inspecting for proper alignment, levelness, and uniformity.
Check for proper alignment of bricks and tiles using a straight edge or level.
Inspect for levelness of plaster using a spirit level.
Check for uniformity of color and texture in tiles.
Ensure that the joints between bricks or tiles are consistent in size and shape.
Look for any cracks or gaps in the plaster or grout between tiles.
Check that the corners of the walls are squa...read more
Q25. what type of welding defects are seen? measures for reducing welding defects
Welding defects include porosity, cracks, incomplete fusion, and distortion. Measures to reduce defects include proper training, inspection, and maintenance.
Porosity: caused by gas entrapment, can be reduced by proper shielding gas and electrode selection
Cracks: caused by high stress or improper cooling, can be reduced by preheating and controlling cooling rate
Incomplete fusion: caused by insufficient heat or improper technique, can be reduced by proper technique and inspecti...read more
Q26. How to Inspect Raw material Like Plate, Pipe, Fittings, Flanges Etc.? How to Review MTC? How to check Shell? How to check Dish End? How to check Cone? How to inspect Heat exchanger? How to offer to third party?...
read moreInspecting raw materials and components for quality assurance in engineering projects involves reviewing MTCs, checking various components like shell, dish end, cone, and heat exchangers, offering third-party inspections, following QAP, and conducting visual checks.
Review Material Test Certificates (MTCs) for compliance with specifications
Check the dimensions, surface finish, and material composition of plates, pipes, fittings, and flanges
Inspect the shell for any defects suc...read more
Q27. What is the size of the concrete cube, the size of the slump cone, and the percentage of strength obtained for 3,7,14, and 28 days of a concrete cube?
The size of the concrete cube is typically 150x150x150 mm, the size of the slump cone is 100 mm, and the percentage of strength obtained varies for different curing periods.
Concrete cube size: 150x150x150 mm
Slump cone size: 100 mm
Percentage of strength obtained varies for 3, 7, 14, and 28 days
Example: Strength obtained at 28 days is typically around 90-95% of the design strength
Q28. What is meaning of Quaity?
Quality refers to the degree of excellence or superiority of a product or service.
Quality is a measure of how well a product or service meets customer expectations and requirements.
It involves ensuring that the product or service is free from defects or errors.
Quality also includes factors such as reliability, durability, and performance.
Quality can be subjective and may vary depending on the context and industry.
Examples of quality measures include customer satisfaction rati...read more
Q29. 1 . What is Quality Assurance Engineer. 2. Explain in a capa 8d. 3. Deference between preventive action and corrective action. 4. Explain by Quality tools. 5 . What is welding and explain to process parameters...
read moreQA QC Engineer interview questions covering topics such as Quality Assurance, CAPA 8D, preventive and corrective actions, quality tools, and welding.
Quality Assurance Engineer ensures that products or services meet the required quality standards.
CAPA 8D is a problem-solving methodology used to identify, correct, and prevent recurring problems.
Preventive action aims to prevent potential problems from occurring, while corrective action aims to correct existing problems.
Quality ...read more
Q30. What type of tests conducted on cement and aggregate?
Various tests are conducted on cement and aggregate to ensure their quality and suitability for construction purposes.
Chemical tests to determine the composition of cement and aggregate
Physical tests to determine the strength, durability, and consistency of cement and aggregate
Aggregate tests include sieve analysis, specific gravity, and absorption tests
Cement tests include setting time, soundness, and compressive strength tests
Q31. 1.Optimization of Cement means ? 2. Concrete design miix as per CBC 3 Batching plant and calibration 4. Soil testing etc
Optimization of cement refers to improving the quality and efficiency of cement production.
Reducing the amount of clinker used in cement production
Using alternative fuels and raw materials
Improving the grinding process
Controlling the chemical composition of raw materials
Minimizing energy consumption
Maximizing output while maintaining quality
Ensuring compliance with industry standards and regulations
Q32. How you control the process or product non conformities without affecting the company's financial term?
Non-conformities can be controlled without affecting financial terms by implementing effective corrective and preventive actions.
Identify the root cause of the non-conformity
Implement corrective and preventive actions to prevent recurrence
Prioritize actions based on risk and impact
Involve cross-functional teams to ensure effective solutions
Monitor and measure the effectiveness of actions taken
Continuously improve the process to prevent future non-conformities
Q33. How do you ensure that contractors comply with the quality standards on-site?
By conducting regular inspections, providing clear guidelines, and offering training and support.
Regularly conduct on-site inspections to ensure compliance
Provide clear quality standards and guidelines for contractors to follow
Offer training and support to help contractors meet quality standards
Q34. How do you handle quality concerns when there’s a significant delay in material delivery?
Address quality concerns by communicating with suppliers, adjusting timelines, and implementing contingency plans.
Communicate with suppliers to understand reasons for delay
Adjust project timelines accordingly
Implement contingency plans such as sourcing materials from alternative suppliers or using substitute materials
Ensure quality standards are maintained despite delays
Q35. How would you perform a site inspection to ensure quality in the construction process?
Performing a site inspection involves thorough examination of construction materials, workmanship, and adherence to specifications.
Reviewing construction plans and specifications to understand requirements
Inspecting materials for quality and compliance with standards
Checking workmanship for accuracy and adherence to specifications
Conducting tests and measurements to ensure structural integrity
Documenting findings and communicating with project team for necessary corrections
Q36. What are some common issues with materials on-site and how do you handle them?
Common issues with materials on-site include quality control, supply chain delays, and incorrect specifications.
Quality control issues such as defects in materials or incorrect measurements
Supply chain delays leading to shortages or late deliveries
Incorrect specifications causing compatibility or performance problems
Q37. What are the common defects found in concrete, and how do you identify them?
Common defects in concrete include cracks, honeycombing, segregation, and bleeding.
Cracks: caused by shrinkage, settlement, or overloading. Can be identified visually or by sounding with a hammer.
Honeycombing: voids in concrete due to poor compaction. Visible on the surface or by breaking a sample.
Segregation: separation of coarse aggregates from the concrete mix. Can be seen during pouring or by examining a cross-section.
Bleeding: excess water rising to the surface during cu...read more
Q38. What documentation do you need to maintain for quality control on a project?
Documentation for quality control includes test plans, inspection reports, non-conformance reports, and quality assurance records.
Test plans outlining testing procedures and criteria
Inspection reports documenting results of inspections
Non-conformance reports detailing any deviations from quality standards
Quality assurance records for tracking quality control activities
Q39. What is an Inspection and Test Plan (ITP) and how does it work?
An Inspection and Test Plan (ITP) is a document that outlines the procedures and requirements for inspecting and testing materials, products, or services.
ITPs are typically created before the start of a project to ensure that all necessary inspections and tests are planned and carried out.
ITPs include details such as the scope of work, acceptance criteria, responsibilities of personnel, and the frequency of inspections and tests.
ITPs help ensure that quality standards are met...read more
Q40. What is the role of a field density test and how is it carried out?
Field density test is used to determine the density of soil or asphalt in the field to ensure proper compaction.
Role: Ensures proper compaction of soil or asphalt to meet project specifications
Carried out using a nuclear gauge or sand cone method
Measurements taken at different depths and locations to assess uniformity
Results used to adjust compaction efforts and ensure structural integrity
Example: In road construction, field density tests are crucial to prevent premature pave...read more
Q41. What tests would you perform on reinforcement steel bars before use in construction?
Tests on reinforcement steel bars include visual inspection, dimensional checks, chemical composition analysis, and mechanical testing.
Visual inspection for any visible defects or damages
Dimensional checks to ensure the bars meet specified size and shape requirements
Chemical composition analysis to verify the material composition meets standards
Mechanical testing such as tensile strength, yield strength, and elongation tests
Corrosion resistance testing to assess the bars' dur...read more
Q42. What do you mean by QA QC ?
QA QC stands for Quality Assurance and Quality Control.
QA QC is a set of processes and activities that ensure the quality of a product or service.
Quality Assurance focuses on preventing defects and ensuring that processes are followed correctly.
Quality Control involves inspecting and testing the product or service to identify defects and ensure it meets the required standards.
QA QC is important in various industries such as manufacturing, construction, software development, a...read more
Q43. What is price of particular grade of concrete (RMC) ?
The price of a particular grade of concrete (RMC) varies depending on several factors such as location, quantity, and grade.
The price of RMC is influenced by the location of the project.
The quantity of RMC required also affects the price.
The grade of RMC needed for the project is a significant factor in determining the price.
The price of RMC can range from $80 to $150 per cubic meter depending on the above factors.
Q44. What is the difference between SS316 and SS304
SS316 has higher corrosion resistance and strength compared to SS304.
SS316 contains molybdenum which enhances its corrosion resistance, while SS304 does not.
SS316 is more suitable for use in harsh environments like marine applications, while SS304 is more commonly used in indoor settings.
SS316 has higher tensile strength and creep strength than SS304.
Q45. is this possible for the bug creation and rectification to be done on the same day?
Yes, it is possible for bug creation and rectification to be done on the same day.
It depends on the severity of the bug.
If it is a minor bug, it can be fixed on the same day.
If it is a major bug, it may take longer to fix.
The bug should be properly documented and tested before being fixed.
The fix should also be properly tested before being deployed.
Q46. what are the principles of 5s & the importance of quality
5S principles are Sort, Set in order, Shine, Standardize, and Sustain. Quality is important to ensure customer satisfaction and business success.
Sort - eliminate unnecessary items to improve efficiency
Set in order - organize items for easy access and productivity
Shine - maintain cleanliness and prevent defects
Standardize - establish consistent processes for quality control
Sustain - continuously improve and maintain the 5S principles
Quality is important to meet customer expect...read more
Q47. explain how to caluculate normality molarity and molecular weight and give number of bondings in chemical formula
Explanation on calculating normality, molarity, molecular weight and number of bondings in chemical formula.
Normality is the number of equivalents of a solute per liter of solution. It is calculated by dividing the number of equivalents by the volume of the solution in liters.
Molarity is the number of moles of a solute per liter of solution. It is calculated by dividing the number of moles by the volume of the solution in liters.
Molecular weight is the sum of the atomic weigh...read more
Q48. What is grade of concrete?
The grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of the concrete in megapascals (MPa).
For example, M20 grade concrete means the compressive strength is 20 MPa.
Different grades of concrete are used for different purposes, such as M10 for non-structural purposes and M40 for heavy-duty structures.
Q49. what is the tolerance of sand bulkage?
The tolerance of sand bulkage refers to the acceptable variation in the volume of sand when it is compacted.
Tolerance of sand bulkage is typically expressed as a percentage.
It is important to measure and control sand bulkage to ensure consistency in construction materials.
The acceptable tolerance may vary depending on the specific application and industry standards.
For example, in concrete production, the tolerance for sand bulkage may be around 2-3%.
Regular testing and monit...read more
Q50. What is high risk bug and explain with example in terms of audio and video file
A high risk bug is a severe issue that can cause major problems in the system.
A high risk bug can cause system crashes or data loss.
In terms of audio and video files, a high risk bug could be a corrupted file that cannot be played or a file that causes the media player to crash.
High risk bugs should be prioritized and fixed immediately to prevent further damage to the system.
Interview Questions of Similar Designations
Top Interview Questions for QA QC Engineer Related Skills
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month