Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Aparna Constructions and Estates Team. If you also belong to the team, you can get access from here

Aparna Constructions and Estates Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 786 Reviews

Filter interviews by

Aparna Constructions and Estates Senior Engineer Interview Questions and Answers

Updated 2 Dec 2024

Aparna Constructions and Estates Senior Engineer Interview Experiences

1 interview found

Senior Engineer Interview Questions & Answers

user image Ganesh Madre

posted on 2 Dec 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process

Senior Engineer Jobs at Aparna Constructions and Estates

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NBC standard and basic knowledge of plumbing standard.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. One meter how much inch
  • Ans. 

    One meter is equal to 39.37 inches.

    • One meter is equivalent to 100 centimeters.

    • One inch is equal to 2.54 centimeters.

    • To convert meters to inches, multiply by 39.37 (100 * 2.54).

  • Answered by AI
  • Q2. Steel density value and units
  • Ans. 

    Steel density is typically around 7.85 g/cm^3.

    • Steel density is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel can vary depending on the specific alloy composition.

    • For example, the density of stainless steel is around 7.9 g/cm^3, while carbon steel is around 7.85 g/cm^3.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Explain your privious jobs about your response
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Related to QA/QC and IS standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Strong base required to crack return test
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Salary date career growth

Interview Preparation Tips

Interview preparation tips for other job seekers - General technicial questions related to site need to be formal

Aparna Constructions and Estates Interview FAQs

How many rounds are there in Aparna Constructions and Estates Senior Engineer interview?
Aparna Constructions and Estates interview process usually has 1 rounds. The most common rounds in the Aparna Constructions and Estates interview process are Technical.
How to prepare for Aparna Constructions and Estates Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aparna Constructions and Estates. The most common topics and skills that interviewers at Aparna Constructions and Estates expect are High Rise Building, MEP, Civil Engineering, Electricals and Finishing.
What are the top questions asked in Aparna Constructions and Estates Senior Engineer interview?

Some of the top questions asked at the Aparna Constructions and Estates Senior Engineer interview -

  1. As per work poliy and methods telling all the proc...read more
  2. What is tiling proc...read more

Tell us how to improve this page.

Aparna Constructions and Estates Senior Engineer Interview Process

based on 3 interviews

Interview experience

2.7
  
Poor
View more
Aparna Constructions and Estates Senior Engineer Salary
based on 90 salaries
₹4.2 L/yr - ₹9 L/yr
21% less than the average Senior Engineer Salary in India
View more details

Aparna Constructions and Estates Senior Engineer Reviews and Ratings

based on 27 reviews

3.7/5

Rating in categories

3.5

Skill development

3.5

Work-life balance

3.5

Salary

3.8

Job security

3.2

Company culture

3.0

Promotions

3.5

Work satisfaction

Explore 27 Reviews and Ratings
Senior Engineer/Engineer - MEP

Hyderabad / Secunderabad

4-7 Yrs

Not Disclosed

Senior Engineer - Waterproofing

Hyderabad / Secunderabad

6-8 Yrs

₹ 5-8 LPA

Senior Engineer/Engineer - QS

Hyderabad / Secunderabad

5-8 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
191 salaries
unlock blur

₹2 L/yr - ₹6.4 L/yr

Junior Engineer
103 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Senior Engineer
90 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Engineer
84 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Assistant Engineer - Civil
83 salaries
unlock blur

₹2.5 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Aparna Constructions and Estates with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Godrej Properties

3.7
Compare

DLF

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview