Civil Foreman

60+ Civil Foreman Interview Questions and Answers

Updated 17 Dec 2024
search-icon

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .

Ans.

To prepare BBS, shuttering work, RCC and PQC work, lay out, DPR, and quantity, one needs to follow a systematic process.

  • Understand the project requirements and specifications

  • Prepare a detailed plan and schedule for each task

  • Ensure availability of necessary resources and materials

  • Follow standard procedures for BBS preparation, shuttering work, RCC and PQC work, lay out, DPR, and quantity calculations

  • Regularly monitor and update progress to ensure timely completion

  • Maintain qual...read more

Q2. What is slump test constant temperature of concrete in site Dinfind the M25 concrete and it's propose

Ans.

Slump test is used to measure the workability of concrete at a constant temperature on site. M25 concrete is a mix design with a compressive strength of 25 MPa.

  • Slump test measures the consistency and workability of concrete by determining the slump of a sample.

  • Constant temperature on site ensures accurate results in the slump test.

  • M25 concrete is a mix design with a compressive strength of 25 MPa, commonly used in construction for structural elements.

  • The purpose of M25 concre...read more

Civil Foreman Interview Questions and Answers for Freshers

illustration image

Q3. 1.)What is reinforcement and rebar ?2.)where are used what block work?

Ans.

Reinforcement and rebar are steel bars used to reinforce concrete structures. They are commonly used in block work.

  • Reinforcement and rebar are used to provide tensile strength to concrete structures.

  • They are commonly used in block work to reinforce the walls and provide stability.

  • Rebar is typically made of carbon steel and is available in various sizes and shapes.

  • The size and spacing of the rebar depend on the design and load requirements of the structure.

  • Reinforcement and re...read more

Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaining in center

Ans.

To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.

  • Determine the total area of the site

  • Calculate the area of zone A by subtracting the combined area of zones B and C from the total area

  • Calculate the area of zone B using the given dimension

  • Calculate the area of zone C by subtracting the area of zone B from the total area

  • Ensure the units of measurement are consistent throughout the calculations

Are these interview questions helpful?

Q5. How much slump in concrete grade m-40

Ans.

The slump in concrete grade m-40 is typically between 75mm to 125mm.

  • Slump is a measure of the consistency or workability of concrete.

  • For concrete grade m-40, the slump range is usually between 75mm to 125mm.

  • Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.

  • The slump value indicates the flow and compactness of the concrete mix.

  • A higher slump value indicates a more workable and fluid concrete m...read more

Q6. How to do layout, how to calculate column ring cutting length

Ans.

Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.

  • Use measuring tape and chalk to mark the layout according to the blueprint

  • Calculate the column ring cutting length using the formula: 2 x π x radius + height

  • Ensure accuracy in measurements to avoid errors in construction

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. Whisch pipes and how many dia metter pipes you have work before

Ans.

I have worked with pipes of various diameters ranging from 2 inches to 24 inches.

  • I have worked with 2-inch pipes for residential plumbing projects.

  • I have worked with 6-inch pipes for irrigation systems.

  • I have worked with 12-inch pipes for sewage systems.

  • I have worked with 24-inch pipes for water treatment plants.

Q8. What is well foundation and tilt shift method

Ans.

Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.

  • Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.

  • It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.

  • The space inside the well is then filled with concrete or stone to provide a stable base for the structure.

  • Tilt shift method is a photo...read more

Civil Foreman Jobs

Civil Foreman 10-15 years
Scapes Hospitality
5.0
₹ 4 L/yr - ₹ 6 L/yr
Kasauli
Civil Foreman 8-13 years
Blackopal Group
4.3
₹ 3 L/yr - ₹ 8 L/yr
Bareilly
Civil Foremen ( Outside India) 5-8 years
East West Brothers
3.0
₹ 3 L/yr - ₹ 5 L/yr
Fiji

Q9. What to check before starting the plaster

Ans.

Before starting the plaster, it is important to check the surface for cleanliness, moisture content, and proper bonding.

  • Check the surface for cleanliness to ensure proper adhesion of the plaster.

  • Ensure the surface is free of dust, dirt, grease, and loose particles.

  • Check the moisture content of the surface to prevent issues with drying and cracking of the plaster.

  • Test the surface for proper bonding by applying a small amount of plaster and checking for adhesion.

  • Make sure the s...read more

Q10. How to calculate of concrete quantity?

Ans.

Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

  • Calculate the volume of the area to be filled (length x width x height)

  • Determine the density of the concrete (usually around 2400 kg/m^3)

  • Multiply the volume by the density to get the total concrete quantity needed

  • Consider adding a percentage for wastage or spillage

Q11. What is the minimum dia rebar of column?

Ans.

The minimum diameter of rebar for a column depends on the structural design and load requirements.

  • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

  • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

  • The minimum diameter of rebar is important for ensuring the structural integrity and strength of the column.

  • Consulting with structural engi...read more

Q12. What is formula of steel weight

Ans.

The formula for calculating the weight of steel is based on the density of steel and the volume of the steel object.

  • The formula for calculating the weight of steel is: Weight = Volume x Density

  • The density of steel is typically around 7850 kg/m^3

  • Volume can be calculated based on the dimensions of the steel object (e.g. length x width x height)

  • Make sure to use consistent units for volume and density in the formula

Q13. What isFinal setting time of concrete

Ans.

Final setting time of concrete is the time taken for the concrete to completely set and harden.

  • Final setting time is the time at which the concrete has hardened sufficiently to bear some load without damage.

  • It is typically around 6-10 hours after the concrete has been mixed and placed.

  • Factors affecting final setting time include temperature, humidity, and the type of cement used.

Q14. Explain the waterproofing process in Toilets and their chemicals also

Ans.

Waterproofing process in toilets involves applying chemicals to prevent water leakage and damage.

  • The first step is to clean and prepare the surface by removing any dirt, grease, or old waterproofing material.

  • Next, a primer is applied to ensure proper adhesion of the waterproofing membrane.

  • Then, a waterproofing membrane is applied to the surface. This can be in the form of liquid-applied membranes, sheet membranes, or cementitious coatings.

  • Finally, sealants are used to seal jo...read more

Q15. What is mathod of slab shuttering with plyboard

Ans.

Slab shuttering with plyboard involves creating a formwork using plywood sheets to support the concrete slab during pouring and curing.

  • Measure and mark the area where the slab will be poured

  • Cut the plywood sheets to size and lay them on the ground

  • Secure the plywood sheets together using nails or screws

  • Install support beams and braces to hold the formwork in place

  • Pour the concrete into the formwork and allow it to cure

  • Remove the formwork once the concrete has hardened

Q16. Please explain the painting work, inside and outer side both

Ans.

Painting work involves applying paint to surfaces, both inside and outside of buildings.

  • Prepare the surface by cleaning, sanding, and priming before painting

  • Choose the appropriate type of paint for the surface being painted

  • Apply paint evenly using brushes, rollers, or sprayers

  • Ensure proper ventilation when painting indoors to prevent fumes

  • Protect surrounding areas from paint splatter with tape or drop cloths

  • Inspect the painted surface for any imperfections and touch up as nee...read more

Q17. How to work start segment pre cast

Ans.

To start working on a precast segment, follow these steps:

  • Inspect the precast segment for any defects or damage

  • Prepare the area where the segment will be placed, ensuring it is level and stable

  • Use appropriate lifting equipment to safely lift and position the segment

  • Secure the segment in place using bolts, clamps, or other fastening methods

  • Check alignment and make any necessary adjustments

  • Connect the segment to adjacent segments, ensuring proper fit and alignment

  • Perform qualit...read more

Q18. What is PPE? And what is HSE

Ans.

PPE stands for Personal Protective Equipment and HSE stands for Health, Safety, and Environment.

  • PPE includes items like hard hats, safety glasses, gloves, and high visibility clothing to protect workers from hazards.

  • HSE focuses on ensuring the health, safety, and environmental protection of workers and the community.

  • Both PPE and HSE are crucial in maintaining a safe work environment on construction sites.

Q19. How much mm in 1"

Ans.

There are 25.4 millimeters in 1 inch.

  • 1 inch is equal to 25.4 millimeters.

  • The conversion factor from inches to millimeters is 25.4.

  • To convert inches to millimeters, multiply the number of inches by 25.4.

  • For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).

Q20. What do you know about U-girder

Ans.

U-girder is a type of precast concrete girder used in bridge construction.

  • U-girders are shaped like the letter 'U' and are commonly used in bridge projects.

  • They are precast off-site and transported to the construction site for installation.

  • U-girders provide structural support and are often used in combination with other bridge components.

  • They are designed to distribute the load of the bridge deck and traffic to the bridge abutments and piers.

Q21. RMC casting before slump testing after casting progress

Ans.

Slump testing should be done immediately after RMC casting to ensure proper workability and quality of the concrete.

  • Slump testing helps to determine the consistency and workability of the concrete mix.

  • Performing slump testing immediately after casting progress ensures that the concrete is still within the desired range for proper placement and compaction.

  • Delaying slump testing can lead to inaccurate results and potential issues with the quality of the concrete.

  • Proper slump te...read more

Q22. Ring cutting length

Ans.

Ring cutting length refers to the measurement of the length of a ring that needs to be cut.

  • Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).

  • The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.

  • For example, if the circumference of a ring is 10 cm, the cutting length would be approximately 3.18 cm.

Q23. How to check beam reinforcement?

Ans.

Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

  • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

  • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

  • Verify the spacing between the steel bars to ensure they are evenly distributed and meet the required spacing as per ...read more

Q24. How are you arrange safety on your site

Ans.

Safety on site is arranged by implementing safety protocols, conducting regular safety inspections, providing safety training to workers, and ensuring proper use of personal protective equipment.

  • Implementing safety protocols such as fall protection measures, hazard communication, and emergency response procedures

  • Conducting regular safety inspections to identify potential hazards and address them promptly

  • Providing safety training to workers on topics like proper lifting techni...read more

Q25. 1mter steel 12mm what is wight

Ans.

The weight of 1 meter of 12mm steel

  • The weight of steel can be calculated using the formula: weight = volume x density

  • To calculate the volume, we need to find the cross-sectional area of the steel rod

  • The cross-sectional area of a 12mm steel rod can be calculated using the formula: area = π x (diameter/2)^2

  • Once we have the volume, we can multiply it by the density of steel to get the weight

  • The density of steel is typically around 7850 kg/m^3

Q26. M20 concert mixer in water levell how

Ans.

The M20 concert mixer should be at the correct water level for optimal performance.

  • Ensure the water level in the M20 concert mixer is at the specified level according to the manufacturer's instructions.

  • Adjust the water level as needed to achieve the desired consistency of the concrete mix.

  • Maintaining the correct water level is crucial for the quality and strength of the concrete mix.

  • Regularly check and monitor the water level during the mixing process to ensure consistency.

Q27. Which type of pice you have work before

Ans.

I have worked with various types of pipes including PVC, HDPE, and steel pipes.

  • I have experience working with PVC pipes which are commonly used for water supply and drainage systems.

  • I have also worked with HDPE pipes which are used for gas and water distribution.

  • I have experience working with steel pipes which are used for high-pressure applications such as oil and gas pipelines.

  • I am familiar with different types of fittings and joints used for connecting pipes.

  • I have experie...read more

Q28. How many labour you control?

Ans.

I currently supervise a team of 15 skilled and unskilled labourers.

  • I am responsible for managing the work of 15 labourers.

  • I ensure that they are following safety protocols and completing tasks on time.

  • I assign tasks to each labourer based on their skills and experience.

  • I provide training and guidance to new labourers.

  • I maintain a positive and productive work environment.

  • Examples: I have supervised teams of up to 50 labourers on large construction projects.

  • I have experience wo...read more

Q29. How much mm in 1mtr

Ans.

There are 1000 millimeters in 1 meter.

  • 1 meter is equal to 1000 millimeters.

  • The conversion factor from meters to millimeters is 1000.

  • To convert meters to millimeters, multiply the length in meters by 1000.

Q30. How to start the Tile work

Ans.

To start the Tile work, first prepare the surface, gather necessary materials and tools, plan the layout, mix the adhesive, and begin setting the tiles.

  • Prepare the surface by ensuring it is clean, dry, and level

  • Gather necessary materials such as tiles, adhesive, grout, spacers, and tools like trowels, tile cutter, and level

  • Plan the layout by measuring and marking guidelines on the surface

  • Mix the adhesive according to manufacturer's instructions

  • Begin setting the tiles starting...read more

Q31. What to check in the plaster

Ans.

Check for cracks, consistency, smoothness, adhesion, and overall quality in plaster.

  • Inspect for any cracks or damage in the plaster surface.

  • Ensure the consistency of the plaster mixture is correct for proper application.

  • Check for smoothness in the finished plaster surface.

  • Test the adhesion of the plaster to the substrate.

  • Overall, assess the quality of the plaster for durability and aesthetics.

Q32. What to check in the Tile work

Ans.

Check for proper alignment, level, spacing, quality of materials, and grout consistency in tile work.

  • Ensure tiles are aligned properly and level

  • Check spacing between tiles for consistency

  • Inspect quality of materials used for tiles

  • Verify grout consistency and application

  • Look for any cracks or chips in the tiles

Q33. What is segment lifting proseger

Ans.

Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.

  • It involves the use of cranes and specialized lifting equipment.

  • The segments are lifted and placed in a predetermined sequence to form the bridge deck.

  • This process is faster and more efficient than traditional bridge construction methods.

  • Examples of projects that have used segment lifting include the San Francisco-Oakland Bay Bridge and the Queensfer...read more

Q34. What is mostly desired?

Ans.

Leadership and communication skills are mostly desired for a Civil Foreman.

  • Strong leadership skills to effectively manage and coordinate construction activities

  • Excellent communication skills to effectively communicate with team members, clients, and stakeholders

  • Knowledge of construction techniques and materials

  • Ability to read and interpret blueprints and construction plans

  • Experience in managing and supervising construction crews

  • Problem-solving and decision-making skills

  • Attent...read more

Q35. Ld full form - development length

Ans.

LD stands for development length, which is the minimum length of reinforcement required to transfer stress from one section to another.

  • LD is an important factor in reinforced concrete design.

  • It is the length of the bar required to transfer the stress from one section to another.

  • It is calculated based on the diameter of the bar, the strength of the concrete, and the bond strength between the bar and the concrete.

  • LD is important to ensure that the reinforcement is properly anch...read more

Q36. How many zone in u grider

Ans.

The number of zones in a u grider varies depending on the specific design and requirements.

  • The number of zones in a u grider can range from 1 to multiple zones.

  • Zones are typically created to divide the grider into sections for better load distribution and structural stability.

  • The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specifications.

  • For example, a shorter u grider with a smaller load...read more

Q37. What is mix ratio M 25

Ans.

Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.

  • M 25 mix ratio is commonly used in construction for structural applications.

  • The mix ratio represents the proportions of different materials used in the concrete mix.

  • For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or gravel).

  • This mix ratio ensures a strong and durable concret...read more

Q38. What is the pour sequence

Ans.

The pour sequence refers to the order in which concrete is poured into formwork during construction.

  • The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.

  • It is important to follow the pour sequence to ensure proper curing and strength of the concrete.

  • For example, in a multi-story building construction, the pour sequence may start from the bottom floors and work upwards to prevent structural issues.

  • The pour sequence...read more

Q39. Cover of reinforcement of slab?

Ans.

Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

  • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

  • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

  • Factors such as exposure conditions, concrete quality, and load requirements can influence the required cover of reinf...read more

Q40. Which type you have expreance

Ans.

I have experience in various types of civil construction projects.

  • Residential construction

  • Commercial construction

  • Road and highway construction

  • Bridge construction

  • Utility infrastructure construction

Q41. Crank bar where are provide

Ans.

Crank bars are provided in construction sites for various purposes.

  • Crank bars are used for bending and shaping reinforcement steel bars.

  • They are commonly used in concrete construction to create curved or angled structures.

  • Crank bars are also used for lifting heavy objects or materials.

  • They can be found in the tool storage area or near the construction equipment.

  • Examples of crank bars include rebar benders, pry bars, and crowbars.

Q42. Why p c c gerd of concrete

Ans.

PCC (Plain Cement Concrete) is used as a base for flooring, foundations, and other structural elements in construction projects.

  • PCC provides a smooth and level surface for further construction work.

  • It helps in distributing the load evenly and prevents the penetration of water and other harmful substances.

  • PCC is cost-effective and easy to construct compared to other types of concrete.

  • Example: PCC is commonly used as a base for laying tiles in residential buildings.

Q43. Type of Pile Foundation

Ans.

Pile foundation is a type of deep foundation used to transfer heavy loads of structures to deeper soil or rock strata.

  • Pile foundation can be classified into two types: end-bearing piles and friction piles.

  • End-bearing piles transfer the load of the structure to a hard layer of rock or soil at the bottom of the pile.

  • Friction piles transfer the load of the structure to the soil around the pile through skin friction.

  • Common types of pile materials include timber, concrete, and ste...read more

Q44. How many total manpower ?

Ans.

The total manpower for the project is 50 workers.

  • Total manpower for the project is 50 workers.

  • Manpower includes skilled and unskilled workers.

  • Manpower may vary depending on the size and scope of the project.

Q45. How find diagonal, rightangle?

Ans.

To find the diagonal of a right angle, you can use the Pythagorean theorem.

  • The Pythagorean theorem states that in a right triangle, the square of the length of the hypotenuse (diagonal) is equal to the sum of the squares of the other two sides.

  • To find the diagonal, you need to know the lengths of the other two sides of the right triangle.

  • Once you have the lengths of the other two sides, you can use the formula: diagonal = sqrt(side1^2 + side2^2).

Q46. How can work in hight

Ans.

Working at heights requires proper safety measures and equipment.

  • Use appropriate safety harnesses and fall protection systems.

  • Ensure scaffolding and ladders are secure and stable.

  • Follow safety guidelines and regulations.

  • Provide proper training to workers on working at heights.

  • Regularly inspect and maintain equipment and tools.

  • Implement safety barriers and guardrails.

  • Use aerial lifts or platforms for safe access to elevated areas.

  • Consider weather conditions and wind speeds bef...read more

Q47. How u bihev ur Engeniar

Ans.

I behave as a civil engineer by being professional, organized, and detail-oriented.

  • I maintain a professional demeanor at all times, treating colleagues and clients with respect.

  • I am organized in my work, keeping track of project timelines, budgets, and resources.

  • I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.

  • I communicate effectively with team members, subcontractors, and stakeholders.

  • I prioritize safety on construction sites, i...read more

Q48. What BBS in contraction

Ans.

BBS in construction stands for Bar Bending Schedule.

  • BBS is a document that provides details about the reinforcement steel bars used in a construction project.

  • It includes information about the size, shape, quantity, and placement of the bars.

  • BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.

  • Example: BBS for a column may specify the number of vertical bars, their diameter, length, a...read more

Q49. What is the right angle?

Ans.

A right angle is an angle that measures exactly 90 degrees.

  • A right angle is formed when two lines or segments meet at a 90-degree angle.

  • It is often represented by a small square in diagrams or drawings.

  • Right angles are commonly found in geometric shapes such as squares and rectangles.

  • They are important in construction and engineering for ensuring accuracy and stability.

  • A right angle can also be bisected to form two congruent angles of 45 degrees each.

Q50. Procedure of laying tile and granite

Ans.

The procedure of laying tile and granite involves preparing the surface, applying adhesive, laying the tiles/granite, grouting, and sealing.

  • Prepare the surface by ensuring it is clean, level, and dry.

  • Apply adhesive to the surface using a trowel, ensuring even coverage.

  • Lay the tiles/granite starting from the center and working outwards in a pattern.

  • Grout the tiles/granite by filling the gaps between them with grout and wiping off excess.

  • Seal the tiles/granite to protect them f...read more

1
2
Next
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.2
 • 413 Interviews
3.9
 • 15 Interviews
2.9
 • 2 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Civil Foreman Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter