Upload Button Icon Add office photos

Filter interviews by

LTG INFRASTRUCTURE Civil Site Engineer Interview Questions and Answers

Updated 30 Oct 2023

LTG INFRASTRUCTURE Civil Site Engineer Interview Experiences

2 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Your introductions, basic questions about previous jobs, previous salary and benefits discussed
  • Q2. What is your previous ctc
  • Q3. How many years experience
  • Q4. Willing to relocate
  • Q5. You have two wheeler
  • Ans. 

    Yes, I have a two wheeler for transportation.

    • Yes, I own a two wheeler for commuting purposes.

    • I use my two wheeler to travel to work and run errands.

    • Having a two wheeler provides me with flexibility and convenience in transportation.

  • Answered by AI

I applied via Newspaper Ad and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. 1.What is the thickness of plastering?, 2.What is name of plastering done at site?, Questions on plastering. 3.What have done in your past construction work? Based on our work done at site they are aked q...
  • Ans. 

    Plastering is a process of covering rough surfaces of walls, columns, ceilings, etc. with a smooth finish.

    • The thickness of plastering varies depending on the surface to be covered and the type of plaster used.

    • The most common type of plastering done at site is cement plastering.

    • In my past construction work, I have supervised the plastering work and ensured that the thickness and quality of plastering are as per the spec...

  • Answered by AI
  • Q2. 1. For external wall 18 mm ,for internal walls 15 mm and for ceiling 12 mm., 2.For external walls it is sand finish plaster(sponge finish) and for internal walls it is smooth plaster finish (wooden float ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence is the first priority ,so attend the interview with confidence, prepare well about what have you done at site, use technical words as possible and explain what have you done at site.

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the LD for column
  • Ans. 

    LD for column refers to Liquidated Damages for delay in completing the column construction.

    • LD stands for Liquidated Damages.

    • It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.

    • LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.

    • The LD amount is usually mentioned in the cont...

  • Answered by AI
  • Q2. What is the mix ratio of m20 grade of concrete
  • Ans. 

    The mix ratio of M20 grade of concrete is 1:1.5:3.

    • The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.

    • For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.

    • This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • For example, if you have 1 bag of cement (50 kg), you would need 1....

  • Answered by AI
  • Q3. What is the unit weight of steel
  • Ans. 

    The unit weight of steel varies depending on its type and grade.

    • The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).

    • The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).

    • For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).

  • Answered by AI
  • Q4. What is the clear cover for beam
  • Ans. 

    The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.

    • Clear cover is important to protect the reinforcement from corrosion and fire.

    • The clear cover for beams is typically specified in construction drawings or codes.

    • The clear cover can vary depending on the type of beam and its exposure conditions.

    • For example, in a residential building, the clear c...

  • Answered by AI
  • Q5. What is the height of parapet wall
  • Ans. 

    The height of a parapet wall varies depending on its purpose and location.

    • The height of a parapet wall is typically determined by building codes and regulations.

    • In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.

    • In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.

    • Historical buildings ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a Good flat form for job viewers

Skills evaluated in this interview

I applied via Company Website and was interviewed in Jun 2022. There were 6 interview rounds.

Round 1 - Group Discussion 

Any qustion test gud

Round 2 - One-on-one 

(2 Questions)

  • Q1. Any topic in civil work
  • Q2. Tred rileted qustion
Round 3 - Assignment 

Construction rileted

Round 4 - Group Discussion 

Kam karne ka tarika

Round 5 - Case Study 

Jo bhi work ho raha ho

Round 6 - Assignment 

Fexibel pevment assignment

Interview Preparation Tips

Interview preparation tips for other job seekers - Me jis bhi jage kam karun mera ek udesh hai apna best dena kam ko ace tare sbe karna apna 100% dena
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Question about civil engineering
  • Q2. Site Execution methods, what is your role. Which methods adopt for work completion in stipulated time with quality
Round 2 - Technical 

(2 Questions)

  • Q1. Material consumption, what is future endeavours
  • Q2. Gypsum, block work, plaster consumption according to floor plate
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Qualifications and experience certificate verification
  • Q2. Salary discussion company benifits
Round 3 - Technical 

(4 Questions)

  • Q1. Qualifications, experience
  • Q2. Technical skills, previous experience
  • Q3. Communication skills
  • Q4. Planning projects complication schedule
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the LD for column
  • Ans. 

    LD for column refers to Liquidated Damages for delay in completing the column construction.

    • LD stands for Liquidated Damages.

    • It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.

    • LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.

    • The LD amount is usually mentioned in the cont...

  • Answered by AI
  • Q2. What is the mix ratio of m20 grade of concrete
  • Ans. 

    The mix ratio of M20 grade of concrete is 1:1.5:3.

    • The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.

    • For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.

    • This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • For example, if you have 1 bag of cement (50 kg), you would need 1....

  • Answered by AI
  • Q3. What is the unit weight of steel
  • Ans. 

    The unit weight of steel varies depending on its type and grade.

    • The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).

    • The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).

    • For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).

  • Answered by AI
  • Q4. What is the clear cover for beam
  • Ans. 

    The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.

    • Clear cover is important to protect the reinforcement from corrosion and fire.

    • The clear cover for beams is typically specified in construction drawings or codes.

    • The clear cover can vary depending on the type of beam and its exposure conditions.

    • For example, in a residential building, the clear c...

  • Answered by AI
  • Q5. What is the height of parapet wall
  • Ans. 

    The height of a parapet wall varies depending on its purpose and location.

    • The height of a parapet wall is typically determined by building codes and regulations.

    • In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.

    • In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.

    • Historical buildings ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a Good flat form for job viewers

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Have yo done work in Site quality inspection
  • Ans. 

    Yes, I have experience in site quality inspection as a Civil Engineer.

    • I have conducted regular inspections to ensure compliance with quality standards and specifications.

    • I have reviewed construction plans and specifications to identify potential quality issues.

    • I have performed tests and measurements to verify the quality of materials and workmanship.

    • I have documented and reported any non-compliance or quality concerns ...

  • Answered by AI
  • Q2. Why AFS shuttering size got increased during the using it?
  • Ans. 

    AFS shuttering size may increase during use due to factors like swelling of wood, moisture absorption, and wear and tear.

    • AFS shuttering size may increase due to the swelling of wood when it absorbs moisture.

    • Moisture absorption can cause the wood to expand, leading to an increase in shuttering size.

    • Wear and tear over time can also contribute to an increase in AFS shuttering size.

    • Increased shuttering size can affect the ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nirala Infratech Civil Engineer interview:
  • AFS and Site quality
  • knowledge of High rise building
  • Work methodologies
  • Good command on MS office
Interview preparation tips for other job seekers - Good place to learn the things and new experiences.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Lapping length of slab & beam , lapping position.
  • Q2. Staircase steel detailing drawing.
Round 2 - Group Discussion 

About last company job descriptions.

Round 3 - HR 

(1 Question)

  • Q1. Payment and job descriptions of current company and your role.

Interview Preparation Tips

Interview preparation tips for other job seekers - It is best company for everyone.

LTG INFRASTRUCTURE Interview FAQs

How many rounds are there in LTG INFRASTRUCTURE Civil Site Engineer interview?
LTG INFRASTRUCTURE interview process usually has 2 rounds. The most common rounds in the LTG INFRASTRUCTURE interview process are Resume Shortlist and HR.
How to prepare for LTG INFRASTRUCTURE Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at LTG INFRASTRUCTURE. The most common topics and skills that interviewers at LTG INFRASTRUCTURE expect are Civil Engineering, Electricals, AutoCAD, Building Construction and CCTV Monitoring.
What are the top questions asked in LTG INFRASTRUCTURE Civil Site Engineer interview?

Some of the top questions asked at the LTG INFRASTRUCTURE Civil Site Engineer interview -

  1. 1.What is the thickness of plastering?, 2.What is name of plastering done at si...read more
  2. You have two whee...read more
  3. 1. For external wall 18 mm ,for internal walls 15 mm and for ceiling 12 mm., 2...read more

Tell us how to improve this page.

People are getting interviews through

based on 2 LTG INFRASTRUCTURE interviews
Job Portal
50%
50% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
LTG INFRASTRUCTURE Civil Site Engineer Salary
based on 7 salaries
₹4 L/yr - ₹4.8 L/yr
21% more than the average Civil Site Engineer Salary in India
View more details

LTG INFRASTRUCTURE Civil Site Engineer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

2.0

Skill development

1.0

Work-Life balance

1.0

Salary & Benefits

1.0

Job Security

1.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
Civil Site Engineer
7 salaries
unlock blur

₹4 L/yr - ₹4.8 L/yr

Site Engineer
6 salaries
unlock blur

₹2.3 L/yr - ₹4.5 L/yr

Project Engineer
5 salaries
unlock blur

₹5 L/yr - ₹6 L/yr

Junior Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Quality Assurance Quality Control Engineer
3 salaries
unlock blur

₹7.8 L/yr - ₹8.5 L/yr

Explore more salaries
Compare LTG INFRASTRUCTURE with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare

Adani Ports and SEZ

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview