Upload Button Icon Add office photos

Filter interviews by

Nirala Infratech Civil Engineer Interview Questions and Answers

Updated 24 Feb 2023

Nirala Infratech Civil Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Nov 2020. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Have yo done work in Site quality inspection
  • Ans. 

    Yes, I have experience in site quality inspection as a Civil Engineer.

    • I have conducted regular inspections to ensure compliance with quality standards and specifications.

    • I have reviewed construction plans and specifications to identify potential quality issues.

    • I have performed tests and measurements to verify the quality of materials and workmanship.

    • I have documented and reported any non-compliance or quality concerns ...

  • Answered by AI
  • Q2. Why AFS shuttering size got increased during the using it?
  • Ans. 

    AFS shuttering size may increase during use due to factors like swelling of wood, moisture absorption, and wear and tear.

    • AFS shuttering size may increase due to the swelling of wood when it absorbs moisture.

    • Moisture absorption can cause the wood to expand, leading to an increase in shuttering size.

    • Wear and tear over time can also contribute to an increase in AFS shuttering size.

    • Increased shuttering size can affect the ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nirala Infratech Civil Engineer interview:
  • AFS and Site quality
  • knowledge of High rise building
  • Work methodologies
  • Good command on MS office
Interview preparation tips for other job seekers - Good place to learn the things and new experiences.

Civil Engineer Jobs at Nirala Infratech

View all

Interview questions from similar companies

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the LD for column
  • Ans. 

    LD for column refers to Liquidated Damages for delay in completing the column construction.

    • LD stands for Liquidated Damages.

    • It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.

    • LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.

    • The LD amount is usually mentioned in the cont...

  • Answered by AI
  • Q2. What is the mix ratio of m20 grade of concrete
  • Ans. 

    The mix ratio of M20 grade of concrete is 1:1.5:3.

    • The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.

    • For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.

    • This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • For example, if you have 1 bag of cement (50 kg), you would need 1....

  • Answered by AI
  • Q3. What is the unit weight of steel
  • Ans. 

    The unit weight of steel varies depending on its type and grade.

    • The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).

    • The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).

    • For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).

  • Answered by AI
  • Q4. What is the clear cover for beam
  • Ans. 

    The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.

    • Clear cover is important to protect the reinforcement from corrosion and fire.

    • The clear cover for beams is typically specified in construction drawings or codes.

    • The clear cover can vary depending on the type of beam and its exposure conditions.

    • For example, in a residential building, the clear c...

  • Answered by AI
  • Q5. What is the height of parapet wall
  • Ans. 

    The height of a parapet wall varies depending on its purpose and location.

    • The height of a parapet wall is typically determined by building codes and regulations.

    • In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.

    • In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.

    • Historical buildings ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a Good flat form for job viewers

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence

Nirala Infratech Interview FAQs

How to prepare for Nirala Infratech Civil Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nirala Infratech. The most common topics and skills that interviewers at Nirala Infratech expect are Civil Construction, Civil Project Management and Site Execution.
What are the top questions asked in Nirala Infratech Civil Engineer interview?

Some of the top questions asked at the Nirala Infratech Civil Engineer interview -

  1. Why AFS shuttering size got increased during the using ...read more
  2. Have yo done work in Site quality inspect...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Nirala Infratech interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 123 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
Puravankara Interview Questions
3.8
 • 18 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
Mahaveer Group Interview Questions
2.9
 • 9 Interviews
View all
Civil Foreman
19 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Manager - CRM
7 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Sales Manager
6 salaries
unlock blur

₹4.8 L/yr - ₹7 L/yr

Senior Civil Engineer
5 salaries
unlock blur

₹5.2 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Nirala Infratech with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview