Upload Button Icon Add office photos

Filter interviews by

Nirala Infratech Civil Site Supervisor Interview Questions and Answers

Updated 4 Sep 2021

Nirala Infratech Civil Site Supervisor Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. Apane bare me batao.
  • Ans. Sir mera nam manoj Kumar h. Me pauri garhwal uttarakhand se hu. Sir me abhi hisar NCPIL me civil site forman la jam karta hù.
  • Answered Anonymously

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is the LD for column
  • Ans. 

    LD for column refers to Liquidated Damages for delay in completing the column construction.

    • LD stands for Liquidated Damages.

    • It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.

    • LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.

    • The LD amount is usually mentioned in the cont...

  • Answered by AI
  • Q2. What is the mix ratio of m20 grade of concrete
  • Ans. 

    The mix ratio of M20 grade of concrete is 1:1.5:3.

    • The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.

    • For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.

    • This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.

    • For example, if you have 1 bag of cement (50 kg), you would need 1....

  • Answered by AI
  • Q3. What is the unit weight of steel
  • Ans. 

    The unit weight of steel varies depending on its type and grade.

    • The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).

    • The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).

    • For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).

  • Answered by AI
  • Q4. What is the clear cover for beam
  • Ans. 

    The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.

    • Clear cover is important to protect the reinforcement from corrosion and fire.

    • The clear cover for beams is typically specified in construction drawings or codes.

    • The clear cover can vary depending on the type of beam and its exposure conditions.

    • For example, in a residential building, the clear c...

  • Answered by AI
  • Q5. What is the height of parapet wall
  • Ans. 

    The height of a parapet wall varies depending on its purpose and location.

    • The height of a parapet wall is typically determined by building codes and regulations.

    • In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.

    • In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.

    • Historical buildings ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a Good flat form for job viewers

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Qualifications and experience certificate verification
  • Q2. Salary discussion company benifits
Round 3 - Technical 

(4 Questions)

  • Q1. Qualifications, experience
  • Q2. Technical skills, previous experience
  • Q3. Communication skills
  • Q4. Planning projects complication schedule

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 124 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Puravankara Interview Questions
3.7
 • 18 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
Mahaveer Group Interview Questions
2.9
 • 9 Interviews
View all
Civil Foreman
19 salaries
unlock blur

₹2.8 L/yr - ₹6 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Manager - CRM
8 salaries
unlock blur

₹3.6 L/yr - ₹8.5 L/yr

Sales Manager
6 salaries
unlock blur

₹4.8 L/yr - ₹7 L/yr

Senior Civil Engineer
5 salaries
unlock blur

₹5.2 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Nirala Infratech with

DLF

3.9
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview