I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
LD for column refers to Liquidated Damages for delay in completing the column construction.
LD stands for Liquidated Damages.
It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.
LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.
The LD amount is usually mentioned in the cont...
The mix ratio of M20 grade of concrete is 1:1.5:3.
The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.
For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.
This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.
For example, if you have 1 bag of cement (50 kg), you would need 1....
The unit weight of steel varies depending on its type and grade.
The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).
The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).
The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.
Clear cover is important to protect the reinforcement from corrosion and fire.
The clear cover for beams is typically specified in construction drawings or codes.
The clear cover can vary depending on the type of beam and its exposure conditions.
For example, in a residential building, the clear c...
The height of a parapet wall varies depending on its purpose and location.
The height of a parapet wall is typically determined by building codes and regulations.
In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.
In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.
Historical buildings ...
posted on 31 Jan 2023
I applied via Walk-in and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.
Bill checking involves verifying quantities, rates, and calculations in a construction project invoice.
Review the bill for accuracy in quantities, rates, and calculations
Check for any discrepancies or errors in the bill
Verify that all items listed in the bill match the actual work done
Ensure that the bill includes all necessary documentation and supporting details
Cross-check the bill with the contract agreement and any...
Managing vendors involves communication, negotiation, and relationship building.
Establish clear expectations and requirements
Communicate regularly to ensure alignment
Negotiate terms and pricing to achieve mutual benefit
Build strong relationships based on trust and respect
Monitor performance and provide feedback for improvement
Resolve conflicts promptly and professionally
Mahaveer Group interview questions for popular designations
I applied via Apna Jobs
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
M25 concrete is a mix of concrete with a compressive strength of 25 N/mm².
M25 concrete is a standard mix used in construction.
It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.
It has a compressive strength of 25 N/mm² after 28 days of curing.
It is commonly used in the construction of buildings, bridges, and roads.
Rate analysis is the process of determining the cost of materials, labor, and equipment required for plastering and brick work.
Rate analysis involves breaking down the cost of materials, labor, and equipment for a specific project.
For plastering, the cost of materials such as cement, sand, and water must be calculated, along with the cost of labor and equipment such as trowels and scaffolding.
For brick work, the cost o...
I applied via Walk-in and was interviewed in Oct 2021. There were 2 interview rounds.
I applied via Job Portal
Top trending discussions
posted on 20 Feb 2015
based on 10 interviews
Interview experience
based on 92 reviews
Rating in categories
Assistant Manager
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive - Stores
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties