Filter interviews by
Bill checking involves verifying quantities, rates, and calculations in a construction project invoice.
Review the bill for accuracy in quantities, rates, and calculations
Check for any discrepancies or errors in the bill
Verify that all items listed in the bill match the actual work done
Ensure that the bill includes all necessary documentation and supporting details
Cross-check the bill with the contract agreement and any...
Managing vendors involves communication, negotiation, and relationship building.
Establish clear expectations and requirements
Communicate regularly to ensure alignment
Negotiate terms and pricing to achieve mutual benefit
Build strong relationships based on trust and respect
Monitor performance and provide feedback for improvement
Resolve conflicts promptly and professionally
Top trending discussions
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
Lap length is the amount of overlap required between two reinforcing bars in concrete structures.
Lap length ensures the transfer of load from one bar to another.
It is necessary to provide sufficient lap length to maintain the strength and integrity of the structure.
The lap length depends on factors such as the type of structure, bar diameter, and the grade of concrete.
For example, in a beam, the lap length is typically...
The cover block size in a column refers to the thickness of the concrete cover provided to the reinforcement bars.
The cover block size is typically specified in the construction drawings or as per the design requirements.
It is important to provide an adequate cover to protect the reinforcement from corrosion and ensure its durability.
The cover block size may vary depending on factors such as the type of structure, expo...
posted on 9 Oct 2021
I applied via Referral and was interviewed in Sep 2021. There were 4 interview rounds.
High rise buildings require careful planning, design, and construction techniques.
Site selection and analysis
Structural design and analysis
Foundation design and construction
Use of high-strength materials
Installation of elevators and other building systems
Safety measures for workers and occupants
Quality control and testing
Regular maintenance and inspections
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The compressive strength of 1st class brick is typically around 10-14 N/mm².
Compressive strength refers to the maximum load a brick can withstand before it breaks under compression.
1st class bricks are high-quality bricks that are used for load-bearing structures.
The compressive strength of 1st class brick is usually between 10-14 N/mm².
This strength ensures the brick can withstand the weight and pressure exerted on it
I applied via Walk-in and was interviewed before Dec 2019. There were 3 interview rounds.
Interview experience
Assistant Manager
13
salaries
| ₹4.5 L/yr - ₹6 L/yr |
Senior Executive - Stores
9
salaries
| ₹3 L/yr - ₹3.7 L/yr |
Site Engineer
8
salaries
| ₹3.8 L/yr - ₹4.8 L/yr |
Project Engineer
8
salaries
| ₹3.6 L/yr - ₹5 L/yr |
Project Manager
7
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties