Upload Button Icon Add office photos

Filter interviews by

Mahaveer Group Project Engineer Interview Questions and Answers

Updated 31 Oct 2022

Mahaveer Group Project Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What's m25 concrete in construction
  • Ans. 

    M25 concrete is a mix of concrete with a compressive strength of 25 N/mm².

    • M25 concrete is a standard mix used in construction.

    • It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.

    • It has a compressive strength of 25 N/mm² after 28 days of curing.

    • It is commonly used in the construction of buildings, bridges, and roads.

  • Answered by AI
  • Q2. Rate analysis for plastering and brick work
  • Ans. 

    Rate analysis is the process of determining the cost of materials, labor, and equipment required for plastering and brick work.

    • Rate analysis involves breaking down the cost of materials, labor, and equipment for a specific project.

    • For plastering, the cost of materials such as cement, sand, and water must be calculated, along with the cost of labor and equipment such as trowels and scaffolding.

    • For brick work, the cost o...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst experience ever in my carrier. no work ethics no increment, it's the worst company to work in total

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Concrete pouring method
  • Ans. 

    Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.

    • Ensure formwork is properly prepared and secured before pouring concrete

    • Use appropriate equipment such as concrete pumps or buckets for pouring

    • Monitor concrete flow and consistency to avoid segregation or honeycombing

    • Properly compact the concrete to remove air voids and ensure strength

    • Allow suffic...

  • Answered by AI
  • Q2. Shuttering of columns
  • Ans. 

    Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.

    • Shuttering is usually made of plywood, timber, or steel.

    • It is important to ensure the shuttering is properly supported and aligned before pouring concrete.

    • The shuttering should be removed after the concrete has set to the required strength.

    • Properly designed and constructed shuttering helps in achieving a smooth and uni

  • Answered by AI
  • Q3. Reinforcement checking checklist points
  • Q4. Tiles placing method
  • Ans. 

    Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.

    • Tiles can be placed in a grid layout for a uniform and organized look.

    • Random pattern placement can create a more eclectic and unique design.

    • Specific design layout involves placing tiles according to a pre-determined pattern or design.

    • Consider factors like tile size, shape, color, and grout spacing when deciding on t

  • Answered by AI
  • Q5. Flooring method for stone work
  • Ans. 

    The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.

    • Prepare the subfloor by ensuring it is clean, level, and dry

    • Apply mortar or adhesive to the back of each stone before placing it on the subfloor

    • Use spacers to maintain consistent spacing between stones

    • Allow the mortar or adhesive to dry completely before grouting the joints

    • Seal the finished stone floor to protec

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just jack is required

I applied via Walk-in and was interviewed before Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About technical related construction work etc

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical related construction work but it's my first interview I face very problem but interview are very well I selected

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Construction work relativ , Drawing relative, Execution Work ,steel work, shutting work, planning, ke relative questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Official website and HR department share Post office site par and linkdin par
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

STEEL WEIGHT, BBS,COVER BLOCK

Round 3 - Technical 

(1 Question)

  • Q1. LAYOUT, DRAWING READING

Interview Preparation Tips

Interview preparation tips for other job seekers - IF YOU ARE UNEMPLOYEMENT FROM ANY COMPANY THEN YOU DIDN'T ANY OPPORTUNITY THAN WILL TRY IT BECAUSE WORK CULTURE IS TOO POOR

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are you doing this company is looking for an interview.

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is good working condition and new income certificate 👍
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Costing and estimate
  • Q2. Project management
  • Q3. Quantity surveyor

Interview Preparation Tips

Interview preparation tips for other job seekers - Manage to staff and contractor and achieve the goal

I appeared for an interview in Jun 2019.

Interview Questionnaire 

1 Question

  • Q1. Regarding my work experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - One should have good knowledge of Civil Procedure Court.
Experience in real estate sector is a big plus.
RERA matters as well as contract drafting

Interview Questionnaire 

1 Question

  • Q1. Vendor management,pest control management,Housekeeping management

Mahaveer Group Interview FAQs

How many rounds are there in Mahaveer Group Project Engineer interview?
Mahaveer Group interview process usually has 2 rounds. The most common rounds in the Mahaveer Group interview process are Resume Shortlist and Technical.
What are the top questions asked in Mahaveer Group Project Engineer interview?

Some of the top questions asked at the Mahaveer Group Project Engineer interview -

  1. Rate analysis for plastering and brick w...read more
  2. What's m25 concrete in construct...read more

Tell us how to improve this page.

Mahaveer Group Project Engineer Salary
based on 8 salaries
₹3.6 L/yr - ₹5 L/yr
21% less than the average Project Engineer Salary in India
View more details

Mahaveer Group Project Engineer Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

3.7

Salary

3.6

Job security

4.1

Company culture

2.0

Promotions

2.6

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
13 salaries
unlock blur

₹4.5 L/yr - ₹6 L/yr

Senior Executive - Stores
9 salaries
unlock blur

₹3 L/yr - ₹3.7 L/yr

Executive Accountant
8 salaries
unlock blur

₹3 L/yr - ₹3.9 L/yr

Site Engineer
8 salaries
unlock blur

₹3.8 L/yr - ₹4.8 L/yr

Project Engineer
8 salaries
unlock blur

₹3.6 L/yr - ₹5 L/yr

Explore more salaries
Compare Mahaveer Group with

Sunteck Realty

3.3
Compare

Balaji Enterprises

4.3
Compare

Pittie Group

2.7
Compare

ASSA ABLOY

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview