Project Coordinator
100+ Project Coordinator Interview Questions and Answers
Q1. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings
Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.
Liquid waterproofing membranes
Bituminous waterproofing membranes
Polyurethane waterproofing membranes
Cementitious waterproofing coatings
Sheet waterproofing membranes
Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107
Q2. What is the characteristic compressive strength of concrete.
The characteristic compressive strength of concrete is the strength of concrete at 28 days of curing.
It is the strength of concrete after 28 days of curing
It is the strength at which the concrete can bear the maximum load without failure
It is determined by testing a sample of concrete in a compression testing machine
The characteristic compressive strength is used to design concrete structures
For example, if the characteristic compressive strength of concrete is 30 MPa, it mea...read more
Project Coordinator Interview Questions and Answers for Freshers
Q3. How can we conduct the sieve analysis of sand & Agreegate.
Sieve analysis of sand & aggregate is conducted to determine the particle size distribution.
Collect a representative sample of sand or aggregate.
Weigh the sample and record the weight.
Prepare a series of sieves with different mesh sizes.
Stack the sieves in ascending order of mesh size, with the finest sieve at the bottom.
Place the sample on the top sieve and cover it with a lid.
Shake the sieves manually or using a mechanical shaker for a specific duration.
After shaking, weigh...read more
Q4. What is the exact height of falling of concrete as per is IS 456: 2000
The exact height of falling of concrete is not specified in IS 456: 2000.
IS 456: 2000 does not provide a specific height for the falling of concrete.
The standard focuses on the design and construction requirements for reinforced concrete structures.
It covers aspects such as materials, mix proportions, workmanship, and quality control.
The height of falling concrete may be specified in project-specific specifications or guidelines.
Consulting project specifications or relevant c...read more
Q5. What about Mivan shuttering, why preferred mivan in place of commercial shuttering work?
Mivan shuttering is preferred over commercial shuttering work due to its advantages in terms of speed, cost-effectiveness, and quality.
Mivan shuttering is a fast-paced construction technique that uses aluminum formwork instead of traditional timber formwork.
It allows for rapid construction, reducing the overall project duration.
Mivan shuttering is highly cost-effective as it requires less labor and material compared to commercial shuttering work.
The use of aluminum formwork e...read more
Q6. How do you hold your vendors and how you convince them when the payment is delayed?
To hold vendors and convince them when payment is delayed, effective communication, transparency, and problem-solving skills are essential.
Maintain open and regular communication with vendors
Explain the reasons for the payment delay and apologize for any inconvenience caused
Offer alternative solutions or negotiate a new payment schedule
Provide reassurance of future prompt payments
Resolve any issues or disputes promptly and fairly
Build strong relationships with vendors based o...read more
Share interview questions and help millions of jobseekers 🌟
Q7. What is the of floor to floor height of the Commercial building s
The floor to floor height of commercial buildings varies depending on the building's purpose and design.
The floor to floor height of a typical office building is around 3.9 meters.
Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.
Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.
The floor to floor height can also be affected by the type of construction materials used and the building's ...read more
Q8. Will you respond when the vendor calls you late night?
Yes, I will respond when the vendor calls me late night.
I understand the importance of timely communication with vendors.
I am committed to providing excellent customer service and support.
I am willing to be available outside regular working hours if necessary.
I will prioritize urgent vendor calls and respond promptly.
I will ensure effective communication channels are established with vendors.
Project Coordinator Jobs
Q9. What will be rate for carpenter and fitter for commercial and mivan or Dropex shuttering work?
The rate for carpenter and fitter for commercial and Mivan or Dropex shuttering work varies depending on factors such as location, experience, and project requirements.
The rate for carpenters and fitters can vary significantly based on the location of the project. Rates may be higher in urban areas compared to rural areas.
Experience level also plays a role in determining the rate. Highly skilled and experienced carpenters and fitters may charge higher rates.
The type of work, ...read more
Q10. What is the slump value of mass concreting
The slump value of mass concreting refers to the measure of consistency or workability of the concrete mixture.
Slump value is determined by conducting a slump test on freshly mixed concrete.
It indicates the flow and compactability of the concrete.
The slump value is measured in millimeters and can range from 0 to 200 mm.
Higher slump values indicate a more fluid and workable concrete mixture.
Lower slump values indicate a stiffer and less workable concrete mixture.
The slump valu...read more
Q11. Zero budget means actual dry cost of materials manpower water and electricity machine and tools involved in completing each and every items of works involved in the construction.
Zero budget refers to the actual cost of materials, manpower, water, electricity, and tools required for each construction task.
Zero budget refers to the direct costs involved in completing each item of work in construction.
It includes the cost of materials, such as cement, steel, and bricks.
Manpower costs, including wages and salaries of workers, are also part of the zero budget.
Water and electricity costs required for construction activities are considered in the zero budge...read more
Q12. How you controlled the projects if labours are going to strikes?
I would prioritize communication with the labor union and work towards finding a resolution while also adjusting project timelines and resources.
Establish open communication with the labor union to understand their concerns and negotiate a solution
Assess the impact of the strike on the project timeline and adjust accordingly
Explore alternative resources or outsourcing options to mitigate the impact of the strike
Ensure clear communication with project stakeholders about the si...read more
Q13. Where construction joints provides for the staircase
Construction joints are not typically provided for staircases.
Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.
Staircases are usually designed as a single unit and do not require construction joints.
However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.
In this case, the joints would be located at the landings between flights of st...read more
Q14. What are all the modern water proofing techniques?
Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.
Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.
Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.
Crystalline waterproofing: a chemical treatment that reacts with water to form crystals tha...read more
Q15. How do you manage changes(scope creep) during execution?
I manage changes by closely monitoring project scope, communicating with stakeholders, and documenting all changes.
Regularly review project scope and objectives to identify any potential changes
Communicate with stakeholders to discuss the impact of proposed changes on project timeline and budget
Document all changes in a change log to track the evolution of the project scope
Prioritize changes based on their impact and feasibility to ensure project goals are still met
Implement ...read more
Q16. Suppose you are project coordinator and the document is not ready and cannot be made for 10 days. Client wants the documents immediately. Write email to the client, how will you handle the situation
I would apologize for the delay, explain the situation, offer alternative solutions, and assure the client of my commitment to meeting their needs.
Apologize for the delay and express understanding of the client's urgency
Explain the situation honestly and transparently, mentioning the document cannot be ready for 10 days
Offer alternative solutions such as providing partial information or interim reports to meet immediate needs
Assure the client of your commitment to delivering ...read more
Q17. What is the difference between Agile and waterfall methodologies?
Agile is iterative and flexible, while waterfall is sequential and rigid.
Agile focuses on delivering working software in short iterations, while waterfall follows a linear sequential approach.
Agile allows for changes and adaptations throughout the project, while waterfall requires detailed planning upfront.
Agile promotes collaboration and communication within the team, while waterfall has distinct phases with minimal communication between them.
Agile is better suited for proje...read more
Q18. WHAT ARE THE BLOOD INVESTIGATION TEST AND HOW ARE THEY PERFORMED
Blood investigation tests are diagnostic tests performed on blood samples to assess various aspects of health.
Common blood tests include complete blood count (CBC), blood glucose test, lipid profile, liver function tests, and kidney function tests.
Blood samples are usually collected by inserting a needle into a vein, typically in the arm.
The samples are then sent to a laboratory for analysis, where different tests are performed based on the specific requirements.
Results from ...read more
Q19. How can we conduct concrete cube test.
Concrete cube test is conducted to measure the compressive strength of concrete.
Prepare the concrete cubes by using a standard mix design.
Fill the cube moulds with freshly mixed concrete in layers.
Compact the concrete using a vibrating table or a vibrating poker.
Smooth the surface of the cubes using a trowel.
Label each cube with relevant information like date, mix design, etc.
Cure the cubes in a curing tank or moist environment for a specified period.
After the curing period, ...read more
Q20. How many carpenter and fitter will provide for 4 cycle of slab area 15000sqm
The number of carpenters and fitters required for 4 cycles of slab area 15000sqm depends on the project timeline and complexity.
The number of carpenters and fitters required will depend on the project timeline and complexity.
The size of the slab area is not the only factor to consider when determining the number of carpenters and fitters needed.
Other factors to consider include the type of materials being used, the design of the project, and the experience level of the worker...read more
Q21. How does the application fit in with my move into becoming a digital nomad?
The application allows for remote project management, enabling flexibility and freedom for digital nomads.
The application provides tools for efficient project coordination from anywhere in the world
It allows for real-time communication with team members and stakeholders
Features like task assignment, progress tracking, and file sharing support remote work
Integration with cloud storage services enables access to project files on the go
Q22. What are the instructions you follow to get the quality?
To ensure quality, I follow a set of instructions that include defining quality standards, conducting regular inspections, and implementing corrective actions.
Define quality standards and communicate them to the team
Conduct regular inspections to ensure compliance with standards
Implement corrective actions when deviations from standards are identified
Document all quality-related activities for future reference
Continuously monitor and improve quality processes
Q23. What type of relation will you maintain with vendors?
I will maintain a professional and collaborative relationship with vendors.
Regular communication to ensure timely delivery of goods and services
Negotiating fair prices and contracts
Resolving any issues or disputes in a timely and respectful manner
Building long-term partnerships based on trust and mutual benefit
Q24. What do you mean to by Zero budget ?
Zero budget refers to a financial plan where no funds are allocated or spent.
Zero budgeting involves starting from scratch and justifying every expense.
It encourages cost-consciousness and prioritization of resources.
Example: A project coordinator using zero budgeting would need to justify every expense, ensuring that it aligns with project goals and delivers value.
Q25. Project Coordinator must be travelling in whole District at all, therefore can you travel??
Yes, I can travel as a Project Coordinator.
As a Project Coordinator, it is essential to travel within the district to oversee and manage projects.
Travelling allows for on-site inspections, meetings with stakeholders, and coordination with team members.
Examples of travel activities include visiting project sites, attending meetings with clients, and conducting training sessions.
Being able to travel demonstrates flexibility, adaptability, and a willingness to go the extra mile ...read more
Q26. What are the basic things that a student shall be aware of?
Students should be aware of time management, effective communication, critical thinking, and goal setting.
Time management is crucial for balancing academic work, extracurricular activities, and personal life.
Effective communication skills are essential for collaborating with peers and conveying ideas clearly.
Critical thinking helps students analyze information, solve problems, and make informed decisions.
Goal setting allows students to stay focused, motivated, and track their...read more
Q27. What is the QS and Rate Card of any item in civil electrical and HVAC work?
QS and Rate Card are documents used in construction projects to determine the quantity surveying and rates of items in civil electrical and HVAC work.
Quantity Surveying (QS) involves calculating the quantities of materials needed for a project.
Rate Card is a document that lists the rates of different items used in construction work.
For example, the QS for electrical work would include the quantity of wires, switches, and outlets needed for a project.
Rate Card for HVAC work wo...read more
Q28. What is domain and why its necessary for any type of IT infrastructure?
Domain is a logical grouping of network resources and devices that share a common security policy.
Domains help in managing and securing IT infrastructure
They provide a centralized authentication and authorization mechanism
Domains enable efficient resource sharing and collaboration
Examples of domains include Active Directory Domain Services, DNS domain, email domain, etc.
Q29. Do you know Google Suite App, and elaborate It, in short
Google Suite App is a collection of cloud-based productivity and collaboration tools developed by Google.
Includes Gmail, Google Drive, Google Docs, Google Sheets, Google Slides, Google Forms, and Google Meet
Allows for real-time collaboration and sharing of documents
Accessible from any device with internet connection
Offers various features such as commenting, version history, and add-ons
Used for personal, educational, and business purposes
Q30. What your think about cost control? What is your organogram?
Cost control is essential for successful project management. Organogram helps in defining roles and responsibilities.
Cost control involves monitoring and managing project expenses to ensure they stay within the budget.
It requires identifying potential cost overruns and taking corrective actions to prevent them.
Organogram is a visual representation of the project team structure, showing the hierarchy of roles and responsibilities.
It helps in defining clear lines of communicati...read more
Q31. Synconext is the start up company and only 30 members team are you okay with that?
Yes, I am okay with working in a start-up company with a team of 30 members.
I am comfortable working in small teams and enjoy the close-knit environment of a start-up.
Working in a start-up allows for more opportunities to take on diverse responsibilities and make a significant impact.
I believe that a smaller team can foster better collaboration and communication among team members.
I am excited about the potential for growth and learning in a start-up environment.
I have previo...read more
Q32. How do you manage multiple vendors?
Managing multiple vendors involves effective communication, coordination, and monitoring.
Establish clear communication channels with each vendor
Set expectations and deliverables for each vendor
Regularly monitor vendor performance and address any issues
Coordinate vendor activities to ensure they align with project timelines
Maintain open and transparent communication to foster collaboration
Document and track vendor contracts, invoices, and payments
Resolve conflicts or disputes ...read more
Q33. Do you have any experience related to waste management?
Yes, I have experience in waste management through coordinating recycling programs and organizing waste reduction initiatives.
Coordinated recycling programs at previous job
Organized waste reduction initiatives in community
Implemented composting system to reduce organic waste
Trained staff on proper waste disposal practices
Q34. How do you manage and mitigate risks?
I manage and mitigate risks by identifying potential risks, assessing their impact, developing risk mitigation strategies, and monitoring risks throughout the project.
Identify potential risks by conducting risk assessments and brainstorming sessions
Assess the impact of each risk on project objectives and timelines
Develop risk mitigation strategies such as contingency plans and risk transfer agreements
Monitor risks throughout the project lifecycle and adjust mitigation strateg...read more
Q35. How would you track project progress?
I would track project progress by setting clear milestones, using project management software, holding regular meetings, and analyzing data.
Set clear milestones to measure progress
Utilize project management software to track tasks and timelines
Hold regular meetings with team members to discuss progress and address any issues
Analyze data and metrics to evaluate project performance and make adjustments as needed
Q36. What are the areas that you will focus on while testing?
Areas of focus include functionality, usability, performance, security, and compatibility testing.
Functionality testing to ensure all features work as intended
Usability testing to assess user experience and ease of use
Performance testing to evaluate system speed and responsiveness
Security testing to identify vulnerabilities and ensure data protection
Compatibility testing to check if the software works on different devices and platforms
Q37. How wil you synchronise the DGs??
Synchronizing DGs involves coordinating their activities and ensuring they work together efficiently.
Create a detailed project plan outlining the tasks and timelines for each DG
Establish regular communication channels to share updates and resolve any conflicts
Implement a centralized system for tracking progress and identifying dependencies
Conduct regular meetings to discuss challenges, provide guidance, and align efforts
Monitor and evaluate the performance of each DG to ident...read more
Q38. What is the command to measure area distance in AutoCAD?
The command to measure area distance in AutoCAD is MEASUREGEOM.
Open AutoCAD and go to the 'Home' tab.
Click on the 'Measure' tool in the 'Utilities' panel.
Select 'Distance' or 'Area' depending on what you want to measure.
Click on the points you want to measure and the result will be displayed.
Alternatively, you can use the MEASUREGEOM command and follow the prompts.
Q39. What are the tools and softwares we know in our field of experience
Some tools and softwares in the field of project coordination include Microsoft Project, Asana, Trello, and Jira.
Microsoft Project
Asana
Trello
Jira
Q40. How to develop lean system in Shope floor area?
Developing a lean system in the shop floor area involves identifying and eliminating waste to improve efficiency.
Identify the value stream and map out the current process
Identify and eliminate waste (muda) such as overproduction, waiting, defects, excess inventory, unnecessary motion, overprocessing, and unused talent
Implement a pull system to reduce inventory and improve flow
Standardize work processes and create a culture of continuous improvement
Train employees on lean prin...read more
Q41. 1.What is planning and billing 2. What is road crust 3.what is ERP 4. WHAT IS PLANNING CONSTANT
Answering questions related to planning, billing, road crust, ERP, and planning constant.
Planning involves creating a roadmap for achieving a specific goal or objective.
Billing is the process of generating invoices for goods or services provided.
Road crust is the layer of ice that forms on roads during winter.
ERP stands for Enterprise Resource Planning, which is a software system used for managing business processes.
Planning constant is a value used in project management to e...read more
Q42. What are Different Types Of KPI ATs? How To Optimize The KPI AT's?
Different types of KPI ATs include outcome, process, input, and impact. To optimize KPI ATs, set clear goals, track progress, and adjust as needed.
Outcome KPIs measure the end result of a process or project
Process KPIs measure the efficiency and effectiveness of a process
Input KPIs measure the resources used in a process
Impact KPIs measure the broader effects of a process on stakeholders
Set clear goals for each KPI
Track progress regularly
Adjust KPIs as needed to ensure they r...read more
Q43. How to handle disputes at sites
Disputes at sites can be handled by effective communication, understanding the root cause, and finding a mutually beneficial solution.
Listen to both parties and understand their perspectives
Identify the root cause of the dispute
Find a mutually beneficial solution
Document the resolution and communicate it to all parties involved
Involve higher authorities if necessary
Q44. What is the difference red brick and flyash bricks
Red bricks are made of clay and are traditional while fly ash bricks are made of fly ash and are eco-friendly.
Red bricks are made of clay while fly ash bricks are made of fly ash, a waste material from thermal power plants.
Fly ash bricks are lighter in weight and have better thermal insulation properties than red bricks.
Red bricks are more porous and absorb more water than fly ash bricks.
Fly ash bricks are eco-friendly as they use waste material and require less energy to pro...read more
Q45. Type work exicute programing why save time and labour
Programming saves time and labor by automating repetitive tasks.
Programming allows for automation of repetitive tasks, reducing the need for manual labor.
Programs can be designed to perform tasks faster and more accurately than humans.
Programming can also help with organization and management of tasks, saving time and reducing errors.
Examples include automated data entry, report generation, and inventory management systems.
Q46. Types of CNC & VMC process. & welding operations, then types of surface treatment Use of Measuring Instrument Concept supply chain management
Types of CNC & VMC processes, welding operations, surface treatments, measuring instruments, and supply chain management in project coordination.
Types of CNC processes include milling, turning, drilling, etc.
Types of VMC processes involve vertical machining centers for precision machining.
Welding operations include MIG, TIG, arc welding, etc.
Surface treatments can be painting, powder coating, anodizing, etc.
Measuring instruments like calipers, micrometers, CMMs are used for q...read more
Q47. What is a project charter?
A project charter is a document that outlines the goals, scope, and stakeholders of a project.
Defines the purpose and objectives of the project
Identifies the key stakeholders and their roles
Outlines the project scope and deliverables
Defines the project timeline and budget
Provides a high-level overview of the project plan
Serves as a reference point for project decision-making
Q48. What is Critical Path Method?
Critical Path Method is a project management technique used to identify the longest sequence of activities in a project.
Critical Path Method helps in determining the project's duration and identifying the activities that are critical to its completion.
It involves creating a network diagram to visualize the project's activities and their dependencies.
By calculating the earliest and latest start and finish times for each activity, the critical path can be determined.
Activities ...read more
Q49. For house hold connection what type pipe used?
For household connections, typically PVC pipes are used.
PVC pipes are lightweight and easy to install
They are resistant to corrosion and chemicals
They have a long lifespan and are cost-effective
Other types of pipes like copper or galvanized steel can also be used depending on the specific requirements
Q50. What is Project life cycle in localization industry ?
Project life cycle in localization industry involves planning, execution, monitoring, and closure of localization projects.
Initiation: Define project scope, objectives, and requirements.
Planning: Develop project plan, schedule, and budget.
Execution: Translate, localize, and test content.
Monitoring: Track progress, manage risks, and communicate with stakeholders.
Closure: Deliver final localized product and evaluate project performance.
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month