Q. What kind of water proofing application are used on terrace roof slab of the commercial, residential buildings

Ans.

Various waterproofing applications are used on terrace roof slabs of commercial and residential buildings.

  • Liquid waterproofing membranes

  • Bituminous waterproofing membranes

  • Polyurethane waterproofing membranes

  • Cementitious waterproofing coatings

  • Sheet waterproofing membranes

  • Examples: Dr. Fixit Newcoat, Fosroc Proofex, SikaTop Seal 107

Q. What is the characteristic compressive strength of concrete?

Ans.

The characteristic compressive strength of concrete is the strength of concrete at 28 days of curing.

  • It is the strength of concrete after 28 days of curing

  • It is the strength at which the concrete can bear the maximum load without failure

  • It is determined by testing a sample of concrete in a compression testing machine

  • The characteristic compressive strength is used to design concrete structures

  • For example, if the characteristic compressive strength of concrete is 30 MPa, it mea...read more

Project Coordinator Interview Questions and Answers for Freshers

illustration image

Q. How can we conduct the sieve analysis of sand and aggregate?

Ans.

Sieve analysis of sand & aggregate is conducted to determine the particle size distribution.

  • Collect a representative sample of sand or aggregate.

  • Weigh the sample and record the weight.

  • Prepare a series of sieves with different mesh sizes.

  • Stack the sieves in ascending order of mesh size, with the finest sieve at the bottom.

  • Place the sample on the top sieve and cover it with a lid.

  • Shake the sieves manually or using a mechanical shaker for a specific duration.

  • After shaking, weigh...read more

Q. Why is Mivan shuttering preferred over commercial shuttering?

Ans.

Mivan shuttering is preferred over commercial shuttering work due to its advantages in terms of speed, cost-effectiveness, and quality.

  • Mivan shuttering is a fast-paced construction technique that uses aluminum formwork instead of traditional timber formwork.

  • It allows for rapid construction, reducing the overall project duration.

  • Mivan shuttering is highly cost-effective as it requires less labor and material compared to commercial shuttering work.

  • The use of aluminum formwork e...read more

Are these interview questions helpful?

Q. What is the maximum allowed height for concrete pouring as per IS 456:2000?

Ans.

The exact height of falling of concrete is not specified in IS 456: 2000.

  • IS 456: 2000 does not provide a specific height for the falling of concrete.

  • The standard focuses on the design and construction requirements for reinforced concrete structures.

  • It covers aspects such as materials, mix proportions, workmanship, and quality control.

  • The height of falling concrete may be specified in project-specific specifications or guidelines.

  • Consulting project specifications or relevant c...read more

Asked in Embibe

5d ago

Q. How do you manage your vendors and convince them when payments are delayed?

Ans.

To hold vendors and convince them when payment is delayed, effective communication, transparency, and problem-solving skills are essential.

  • Maintain open and regular communication with vendors

  • Explain the reasons for the payment delay and apologize for any inconvenience caused

  • Offer alternative solutions or negotiate a new payment schedule

  • Provide reassurance of future prompt payments

  • Resolve any issues or disputes promptly and fairly

  • Build strong relationships with vendors based o...read more

Project Coordinator Jobs

CBRE logo
AV Project Coordinator 7-12 years
CBRE
4.1
Hyderabad / Secunderabad
Teleperformance Global services logo
Project Coordinator 1-2 years
Teleperformance Global services
3.9
Thane
Jones Lang LaSalle Property Consultants (India) Pv t. Ltd. logo
Project Co-ordinator 1-3 years
Jones Lang LaSalle Property Consultants (India) Pv t. Ltd.
4.1
Gurgaon / Gurugram
3d ago

Q. What is the floor-to-floor height of commercial buildings?

Ans.

The floor to floor height of commercial buildings varies depending on the building's purpose and design.

  • The floor to floor height of a typical office building is around 3.9 meters.

  • Warehouses and industrial buildings have higher floor to floor heights, usually around 4.5 to 6 meters.

  • Residential buildings have lower floor to floor heights, usually around 2.7 to 3 meters.

  • The floor to floor height can also be affected by the type of construction materials used and the building's ...read more

Asked in Embibe

6d ago

Q. Will you respond when a vendor calls you late at night?

Ans.

Yes, I will respond when the vendor calls me late night.

  • I understand the importance of timely communication with vendors.

  • I am committed to providing excellent customer service and support.

  • I am willing to be available outside regular working hours if necessary.

  • I will prioritize urgent vendor calls and respond promptly.

  • I will ensure effective communication channels are established with vendors.

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q. What are the rates for carpenters and fitters for commercial and Mivan or Dropex shuttering work?

Ans.

The rate for carpenter and fitter for commercial and Mivan or Dropex shuttering work varies depending on factors such as location, experience, and project requirements.

  • The rate for carpenters and fitters can vary significantly based on the location of the project. Rates may be higher in urban areas compared to rural areas.

  • Experience level also plays a role in determining the rate. Highly skilled and experienced carpenters and fitters may charge higher rates.

  • The type of work, ...read more

2d ago

Q. Where are construction joints provided for the staircase?

Ans.

Construction joints are not typically provided for staircases.

  • Construction joints are typically used in concrete structures to allow for expansion and contraction due to temperature changes.

  • Staircases are usually designed as a single unit and do not require construction joints.

  • However, if the staircase is very long or has multiple flights, construction joints may be necessary to allow for movement.

  • In this case, the joints would be located at the landings between flights of st...read more

2d ago

Q. Does zero budget mean the actual dry cost of materials, manpower, water, electricity, machines, and tools involved in completing each item of work in the construction?

Ans.

Zero budget refers to the actual cost of materials, manpower, water, electricity, and tools required for each construction task.

  • Zero budget refers to the direct costs involved in completing each item of work in construction.

  • It includes the cost of materials, such as cement, steel, and bricks.

  • Manpower costs, including wages and salaries of workers, are also part of the zero budget.

  • Water and electricity costs required for construction activities are considered in the zero budge...read more

Q. What is the slump value of mass concreting?

Ans.

The slump value of mass concreting refers to the measure of consistency or workability of the concrete mixture.

  • Slump value is determined by conducting a slump test on freshly mixed concrete.

  • It indicates the flow and compactability of the concrete.

  • The slump value is measured in millimeters and can range from 0 to 200 mm.

  • Higher slump values indicate a more fluid and workable concrete mixture.

  • Lower slump values indicate a stiffer and less workable concrete mixture.

  • The slump valu...read more

4d ago

Q. What is the actual measured output of a 155 kW motor during testing, expressed in megawatts?

Ans.

The actual measured output of a 155 kW motor during testing is 0.155 megawatts.

  • The measured output of a 155 kW motor is 0.155 megawatts as 1 kW is equal to 0.001 megawatts.

  • To convert kilowatts to megawatts, divide the power in kilowatts by 1000.

  • In this case, 155 kW divided by 1000 equals 0.155 megawatts.

Q. How do you control projects if laborers go on strike?

Ans.

I would prioritize communication with the labor union and work towards finding a resolution while also adjusting project timelines and resources.

  • Establish open communication with the labor union to understand their concerns and negotiate a solution

  • Assess the impact of the strike on the project timeline and adjust accordingly

  • Explore alternative resources or outsourcing options to mitigate the impact of the strike

  • Ensure clear communication with project stakeholders about the si...read more

1d ago

Q. What are all the modern water proofing techniques?

Ans.

Modern waterproofing techniques include liquid applied membranes, preformed membranes, and crystalline waterproofing.

  • Liquid applied membranes: applied as a liquid and cures to form a seamless, waterproof membrane. Examples include polyurethane and acrylic coatings.

  • Preformed membranes: sheets of waterproof material that are applied to the surface. Examples include EPDM and PVC membranes.

  • Crystalline waterproofing: a chemical treatment that reacts with water to form crystals tha...read more

Asked in TRooInbound

6d ago

Q. How do you manage changes in scope during project execution?

Ans.

I manage changes by closely monitoring project scope, communicating with stakeholders, and documenting all changes.

  • Regularly review project scope and objectives to identify any potential changes

  • Communicate with stakeholders to discuss the impact of proposed changes on project timeline and budget

  • Document all changes in a change log to track the evolution of the project scope

  • Prioritize changes based on their impact and feasibility to ensure project goals are still met

  • Implement ...read more

Asked in Embibe

5d ago

Q. How would you hire SMEs to write the proper content?

Ans.

To hire SMEs, I will identify needs, source candidates, and evaluate expertise through interviews and assessments.

  • Define the specific content needs and areas of expertise required for the project.

  • Utilize professional networks and platforms like LinkedIn to identify potential SMEs.

  • Conduct thorough interviews to assess their knowledge and experience in the relevant field.

  • Request samples of their previous work to evaluate the quality and relevance of their content.

  • Consider colla...read more

Asked in Hippocampus

1d ago

Q. Suppose you are a project coordinator and the document will not be ready for 10 days, but the client wants it immediately. How would you handle this situation and what would you write in an email to the client?

Ans.

I would apologize for the delay, explain the situation, offer alternative solutions, and assure the client of my commitment to meeting their needs.

  • Apologize for the delay and express understanding of the client's urgency

  • Explain the situation honestly and transparently, mentioning the document cannot be ready for 10 days

  • Offer alternative solutions such as providing partial information or interim reports to meet immediate needs

  • Assure the client of your commitment to delivering ...read more

6d ago

Q. What is the difference between Agile and Waterfall methodologies?

Ans.

Agile is iterative and flexible, while waterfall is sequential and rigid.

  • Agile focuses on delivering working software in short iterations, while waterfall follows a linear sequential approach.

  • Agile allows for changes and adaptations throughout the project, while waterfall requires detailed planning upfront.

  • Agile promotes collaboration and communication within the team, while waterfall has distinct phases with minimal communication between them.

  • Agile is better suited for proje...read more

Asked in HLL Lifecare

4d ago

Q. What are the blood investigation tests and how are they performed?

Ans.

Blood investigation tests are diagnostic tests performed on blood samples to assess various aspects of health.

  • Common blood tests include complete blood count (CBC), blood glucose test, lipid profile, liver function tests, and kidney function tests.

  • Blood samples are usually collected by inserting a needle into a vein, typically in the arm.

  • The samples are then sent to a laboratory for analysis, where different tests are performed based on the specific requirements.

  • Results from ...read more

Q. How can we conduct a concrete cube test?

Ans.

Concrete cube test is conducted to measure the compressive strength of concrete.

  • Prepare the concrete cubes by using a standard mix design.

  • Fill the cube moulds with freshly mixed concrete in layers.

  • Compact the concrete using a vibrating table or a vibrating poker.

  • Smooth the surface of the cubes using a trowel.

  • Label each cube with relevant information like date, mix design, etc.

  • Cure the cubes in a curing tank or moist environment for a specified period.

  • After the curing period, ...read more

1d ago

Q. What do you mean by Zero budget?

Ans.

Zero budget refers to a financial plan where no funds are allocated or spent.

  • Zero budgeting involves starting from scratch and justifying every expense.

  • It encourages cost-consciousness and prioritization of resources.

  • Example: A project coordinator using zero budgeting would need to justify every expense, ensuring that it aligns with project goals and delivers value.

6d ago

Q. If one of your team members is unavailable at a critical point in the project, what steps will you take to address the situation?

Ans.

I would assess the situation, communicate with the team, and implement a contingency plan to ensure project continuity.

  • Assess the impact of the team member's absence on the project timeline and deliverables.

  • Communicate with the team to inform them of the situation and gather input on how to proceed.

  • Identify any overlapping skills within the team and reassign tasks to ensure coverage.

  • Consider bringing in temporary support or reallocating resources if necessary.

  • Document the sit...read more

Q. How many carpenter and fitter will provide for 4 cycle of slab area 15000sqm

Ans.

The number of carpenters and fitters required for 4 cycles of slab area 15000sqm depends on the project timeline and complexity.

  • The number of carpenters and fitters required will depend on the project timeline and complexity.

  • The size of the slab area is not the only factor to consider when determining the number of carpenters and fitters needed.

  • Other factors to consider include the type of materials being used, the design of the project, and the experience level of the worker...read more

Asked in Insight

4d ago

Q. How does the application fit in with my move into becoming a digital nomad?

Ans.

The application allows for remote project management, enabling flexibility and freedom for digital nomads.

  • The application provides tools for efficient project coordination from anywhere in the world

  • It allows for real-time communication with team members and stakeholders

  • Features like task assignment, progress tracking, and file sharing support remote work

  • Integration with cloud storage services enables access to project files on the go

Asked in Embibe

1d ago

Q. What instructions do you follow to ensure quality?

Ans.

To ensure quality, I follow a set of instructions that include defining quality standards, conducting regular inspections, and implementing corrective actions.

  • Define quality standards and communicate them to the team

  • Conduct regular inspections to ensure compliance with standards

  • Implement corrective actions when deviations from standards are identified

  • Document all quality-related activities for future reference

  • Continuously monitor and improve quality processes

Asked in Embibe

3d ago

Q. What type of relationship will you maintain with vendors?

Ans.

I will maintain a professional and collaborative relationship with vendors.

  • Regular communication to ensure timely delivery of goods and services

  • Negotiating fair prices and contracts

  • Resolving any issues or disputes in a timely and respectful manner

  • Building long-term partnerships based on trust and mutual benefit

3d ago

Q. As a Project Coordinator, you may need to travel throughout the district. Are you able to travel?

Ans.

Yes, I can travel as a Project Coordinator.

  • As a Project Coordinator, it is essential to travel within the district to oversee and manage projects.

  • Travelling allows for on-site inspections, meetings with stakeholders, and coordination with team members.

  • Examples of travel activities include visiting project sites, attending meetings with clients, and conducting training sessions.

  • Being able to travel demonstrates flexibility, adaptability, and a willingness to go the extra mile ...read more

Q. What is the Quantity Survey (QS) and Rate Card of any item in civil, electrical, and HVAC work?

Ans.

QS and Rate Card are documents used in construction projects to determine the quantity surveying and rates of items in civil electrical and HVAC work.

  • Quantity Surveying (QS) involves calculating the quantities of materials needed for a project.

  • Rate Card is a document that lists the rates of different items used in construction work.

  • For example, the QS for electrical work would include the quantity of wires, switches, and outlets needed for a project.

  • Rate Card for HVAC work wo...read more

Asked in CBRE

5d ago

Q. What tools and software are you familiar with in your field of experience?

Ans.

Some tools and softwares in the field of project coordination include Microsoft Project, Asana, Trello, and Jira.

  • Microsoft Project

  • Asana

  • Trello

  • Jira

1
2
3
4
5
6
7
Next

Interview Experiences of Popular Companies

IQVIA Logo
3.8
 • 494 Interviews
CBRE Logo
4.1
 • 302 Interviews
Cummins Logo
4.3
 • 252 Interviews
BT Group Logo
3.9
 • 203 Interviews
View all
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Project Coordinator Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits