Workability of concrete refers to its ease of mixing, placing, and compacting.
Workability is affected by factors such as water-cement ratio, aggregate size and shape, and admixtures.
Concrete with good workability is easier to handle and results in a smoother finish.
Workability can be measured using tests such as slump test, flow test, and compacting factor test.
Low workability can lead to problems such as segregation a...
Internal painting process involves surface preparation, primer application, and topcoat application.
Surface preparation involves cleaning, sanding, and filling any cracks or holes.
Primer application helps to improve adhesion and durability of the paint.
Topcoat application is done after the primer has dried and provides the final color and finish.
The type of paint and application method used depends on the surface being...
The process of tiles laying involves preparation of surface, marking layout, applying adhesive, laying tiles and grouting.
Surface preparation involves cleaning and leveling the surface.
Layout is marked using chalk lines or laser levels.
Adhesive is applied using a notched trowel.
Tiles are laid starting from the center and working outwards.
Grouting is done after the adhesive has dried.
Different types of tiles require dif...
Internal plaster is the process of applying a layer of plaster on the interior walls and ceilings of a building.
The surface to be plastered should be clean and free from dust and debris.
A mixture of cement, sand, and water is prepared in the ratio of 1:4:5.
The mixture is then applied to the surface using a trowel and leveled.
The plaster is left to dry for a few days before it is painted or finished with a decorative co...
External plaster is a process of applying a layer of cement mortar on the external walls of a building.
The surface to be plastered is cleaned and made free of dust and debris.
A mixture of cement, sand, and water is prepared in the required ratio.
The mixture is applied on the wall surface using a trowel.
The plaster is then leveled and smoothened using a wooden float.
The plaster is left to dry for a few days before paint...
Tests conducted on aggregates to determine their quality and suitability for use in construction.
Gradation test to determine particle size distribution
Abrasion test to determine resistance to wear and tear
Impact test to determine toughness and resistance to impact
Soundness test to determine resistance to weathering
Specific gravity and water absorption test to determine density and porosity
The test of fine aggregate is conducted to determine its quality and suitability for use in construction.
The test of fine aggregate includes tests for grading, particle shape, specific gravity, water absorption, and moisture content.
Grading test determines the particle size distribution of the aggregate.
Particle shape test assesses the shape and texture of the particles.
Specific gravity test measures the density of the...
I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.
Quality control and waste management
Maths reasoning and core subjects
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
I appeared for an interview in Jul 2024.
Basic questions for civil engineers included topics from Structural Engineering, Surveying, Geotechnical Engineering, and Concrete Technology.
Density of steel, concrete, bricks
Steel: 7850 kg/m^3
Concrete: 2400 kg/m^3
Bricks: 1900-2100 kg/m^3
Various types of equipment such as levels, theodolites, and total stations are used for leveling. Different types of surveys include topographic, construction, and boundary surveys.
Equipment used for leveling include levels, theodolites, and total stations
Levels are used for basic leveling tasks, theodolites for measuring angles and distances, and total stations for combined angle and distance measurements
Types of surv...
Different types of cement include Portland cement, rapid hardening cement, low heat cement, and sulfate resisting cement.
Portland cement is the most common type used in construction.
Rapid hardening cement sets quickly and gains strength faster than other types.
Low heat cement generates less heat during hydration, making it suitable for large concrete structures.
Sulfate resisting cement is used in environments with high
I appeared for an interview in Dec 2024.
SBC stands for Safe Bearing Capacity.
SBC is the maximum pressure that can be applied to the soil without causing shear failure.
It is an important factor in the design of foundations for structures.
Example: The SBC of a particular soil type is 200 kN/m^2.
Different RLs can be found by measuring the vertical distance between points on the figure.
Measure the vertical distance between points A and B to find RL AB
Measure the vertical distance between points C and D to find RL CD
Measure the vertical distance between points E and F to find RL EF
The diameter of a Tunnel Boring Machine (TBM) varies depending on the project requirements and can range from a few meters to over 15 meters.
The diameter of a TBM is typically determined by the size of the tunnel being constructed.
TBMs used for subway tunnels may have a smaller diameter compared to those used for large transportation tunnels.
Some TBMs can have diameters exceeding 15 meters for mega tunneling projects.
T...
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Water treatment plant process involves several steps to remove impurities and make water safe for consumption.
Coagulation: Chemicals are added to water to make impurities clump together.
Sedimentation: The clumped impurities settle at the bottom of the tank.
Filtration: Water passes through layers of sand, gravel, and charcoal to remove remaining impurities.
Disinfection: Chlorine or other chemicals are added to kill bact...
posted on 8 Oct 2022
I applied via Company Website and was interviewed in Apr 2022. There were 3 interview rounds.
My name is Rahul Kumar and diploma holder 71 percentage final year company VNCPL mein 4 months experience IGI airport per project name Airbus training centre
The project name is GMR Airbus training centre.
The project was undertaken by GMR Group in partnership with Airbus.
It is a state-of-the-art aviation training facility located in Hyderabad, India.
The centre offers training for pilots, maintenance engineers, and cabin crew.
It has advanced simulators and training equipment for various aircraft models.
The project was completed in 2017 and has been operational since then.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Engineer
19
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Civil Site Engineer
16
salaries
| ₹2.4 L/yr - ₹3.7 L/yr |
Senior Engineer
15
salaries
| ₹3 L/yr - ₹6 L/yr |
Project Manager
13
salaries
| ₹8 L/yr - ₹19.1 L/yr |
Store Incharge
12
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties