Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Previous experience
  • Q2. Project coordination role
  • Ans. 

    Project coordination involves overseeing and managing various aspects of a project to ensure successful completion.

    • Developing project plans and timelines

    • Coordinating with team members and stakeholders

    • Monitoring progress and addressing any issues

    • Ensuring project goals are met within budget and timeline

    • Communicating updates and milestones to stakeholders

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Personal aptitude
  • Q2. Strategic questionnaire
Round 3 - HR 

(2 Questions)

  • Q1. Salary and perks
  • Q2. General aptitude

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear with your fundamentals

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

Project Engineer Interview Questions & Answers

user image nitesh yadav

posted on 12 Jul 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About your work define self.
  • Q2. Pile, Girder and Major bridge related.

Top Patel Engineering Project Engineer Interview Questions and Answers

Q1. How you do the rate analysis for additional item and what are the things which you need to be considered during rate analysis with an example.
View answer (1)

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star PatternPrint the following pattern for the given N number of rows. Pattern for N = 4 * ** *** **** Note : There are no spaces between the stars (*). Input format : Integer N (Total no. of rows) Output format : Pattern in N l... read more
View answer (9)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Iam batching plant operater com plant macnick all machine cal wora plant
  • Q2. All Batching Plant work
  • Q3. Batching Plantmantans
  • Q4. Batching Plant.Calibration
  • Q5. Batching Plantmacnical work

Batching Plant Operator Interview Questions asked at other Companies

Q1. What problem, facing in plant operation, mechanical and electrical?
View answer (1)

Civil GET Interview Questions & Answers

user image Anonymous

posted on 24 Jul 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. ABOUT MY PROJECTS
  • Q2. WHAT AE YOUR GOALS AN DO YOU SEE US IN IT
Round 2 - Technical 

(4 Questions)

  • Q1. ESTIMATION RELATED
  • Q2. COMPONENTS OF DAMS
  • Ans. 

    Components of dams include spillways, gates, reservoir, and embankment.

    • Spillways are structures that allow excess water to flow out of the dam.

    • Gates are used to control the flow of water through the dam.

    • Reservoir is the body of water created by the dam.

    • Embankment is the structure that holds back the water in the reservoir.

    • Other components may include intake structures, powerhouses, and fish ladders.

  • Answered by AI
  • Q3. PERSONALITY QUESTION , WHAT WILL I DO ON MY FIRST DAY AS GET
  • Q4. BBS, EXCEL AND RCC BASIC

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST TRY TO LEARN AND ENJOY YOUR JOB AND AVOID THE NEGATIVES

Civil GET Interview Questions asked at other Companies

Q1. How tunnel lining is done?
View answer (6)

Patel Engineering interview questions for popular designations

 Project Engineer

 (6)

 Project Engineer - Civil

 (2)

 Safety Officer

 (2)

 Store Head

 (2)

 Batching Plant Operator

 (1)

 Civil GET

 (1)

 Civil Site Engineer

 (1)

 Deputy General Manager Civil

 (1)

Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the way to settle the consumption order in SAP?
  • Ans. 

    Consumption order settlement in SAP involves closing the order by settling the costs incurred against it.

    • Navigate to the settlement transaction in SAP (e.g. KO88 for order settlement)

    • Enter the order number and select the relevant parameters for settlement

    • Review and confirm the settlement to close the consumption order

  • Answered by AI
  • Q2. Required many types of Transaction code(T-code) for SAP uses?
  • Ans. 

    There are many types of Transaction codes (T-codes) used in SAP for various functions.

    • T-codes for financial transactions (e.g. F-02 for posting journal entries)

    • T-codes for material management (e.g. MM01 for creating material master)

    • T-codes for human resources (e.g. PA30 for maintaining HR master data)

    • T-codes for sales and distribution (e.g. VA01 for creating sales order)

  • Answered by AI
  • Q3. Tell the technical specification of Tipper, Excavator & Boom Placer?
  • Ans. 

    Tipper, Excavator, and Boom Placer are heavy machinery used in construction. Each has specific technical specifications.

    • Tipper: Capacity ranges from 5 to 30 tons, engine power varies from 100 to 400 HP, and dump angle is typically around 45 degrees.

    • Excavator: Operating weight can be between 3 to 200 tons, engine power ranges from 20 to 1000 HP, and digging depth varies from 6 to 20 meters.

    • Boom Placer: Boom length can r...

  • Answered by AI

Skills evaluated in this interview

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (5)

Get interview-ready with Top Patel Engineering Interview Questions

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. ABOUT CONSTRUCTION AND INFRASTRUCTURE ACTIVITIES AT SITE
  • Q2. ABOUT THE TUNNEL EXCAVATION AND SUPPORT WORK

Interview Preparation Tips

Interview preparation tips for other job seekers - ENJOYED THE INTERVIEW WITH CONFIDANCE

Project Engineer - Civil Interview Questions asked at other Companies

Q1. 15 days Program sheet for Steel qty of 850 sqft, slab area, 60 columns of size 600×300 mm and 3.0 m height, 30 Mt steel & Steel shuttering.
View answer (2)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. They will ask you previous company experience , if you worked early and if you have worked ask the reason to leave the company They will ask your role in previous company. They will ask your Strong and wea...
Round 2 - HR 

(1 Question)

  • Q1. They may ask your previous company CTC and what will be your expections They may ask your family background

Deputy General Manager Civil Interview Questions asked at other Companies

Q1. 1. Cost per sft. 2.steel consumption per sft.3.conc. consumption per sft. 4. All activities per sft , which is required to complete the building.5. how much construction area you had handed in past.6. End to end projects completed in past.
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Why joining in this group

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Salary discussiom
  • Q2. Notice period how much
Round 2 - Technical 

(1 Question)

  • Q1. Basic technical questions

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell us about yourself
  • Q2. What's your strengths

Top Patel Engineering Project Engineer Interview Questions and Answers

Q1. How you do the rate analysis for additional item and what are the things which you need to be considered during rate analysis with an example.
View answer (1)

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star PatternPrint the following pattern for the given N number of rows. Pattern for N = 4 * ** *** **** Note : There are no spaces between the stars (*). Input format : Integer N (Total no. of rows) Output format : Pattern in N l... read more
View answer (9)

Patel Engineering Interview FAQs

How many rounds are there in Patel Engineering interview?
Patel Engineering interview process usually has 2 rounds. The most common rounds in the Patel Engineering interview process are Technical, HR and Resume Shortlist.
How to prepare for Patel Engineering interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Patel Engineering. The most common topics and skills that interviewers at Patel Engineering expect are Project Management, Construction Management, Planning, Bank Reconciliation and Accounting.
What are the top questions asked in Patel Engineering interview?

Some of the top questions asked at the Patel Engineering interview -

  1. What was the rock type, support system, and methods of classification of rock t...read more
  2. How you do the rate analysis for additional item and what are the things which ...read more
  3. Hydraulics of dam, power intake, tunnel, surge shaft and power house. Different...read more
How long is the Patel Engineering interview process?

The duration of Patel Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Patel Engineering Interview Process

based on 42 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 406 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.4
 • 18 Interviews
View all

Patel Engineering Reviews and Ratings

based on 517 reviews

4.1/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.7

Salary

4.1

Job security

3.8

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 517 Reviews and Ratings
Project Engineer
128 salaries
unlock blur

₹3.6 L/yr - ₹9.2 L/yr

Civil Engineer
73 salaries
unlock blur

₹2.7 L/yr - ₹6.1 L/yr

Assistant Manager
68 salaries
unlock blur

₹5.5 L/yr - ₹13.4 L/yr

Mechanical Engineer
47 salaries
unlock blur

₹2.5 L/yr - ₹7.2 L/yr

Deputy Manager
35 salaries
unlock blur

₹7.3 L/yr - ₹16 L/yr

Explore more salaries
Compare Patel Engineering with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview