Filter interviews by
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2023. There were 4 interview rounds.
NATM stands for New Austrian Tunneling Method, a construction method for tunnels and underground spaces.
Construction method for tunnels and underground spaces
Involves excavation, support, and monitoring
Developed in Austria in the 1960s
Uses a combination of rock bolts, shotcrete, and steel ribs for support
Powder factor is the amount of explosive required to break a unit volume of rock in blasting operations.
Powder factor is calculated by dividing the total amount of explosive used by the volume of rock being blasted.
The formula for powder factor is: Powder Factor = Total mass of explosives / Volume of rock being blasted.
Powder factor is typically measured in units of kg/m3 or lb/yd3.
A higher powder factor indicates a mo...
Details about TMT and concrete grade
I applied via Naukri.com and was interviewed in Jun 2022. There was 1 interview round.
Hydraulic design involves the use of fluid mechanics to design structures and tunnels that can withstand water pressure.
Understanding of fluid mechanics and hydraulic principles
Knowledge of materials and their properties
Ability to use software such as AutoCAD and ANSYS
Experience with designing drainage systems and water management
Familiarity with safety regulations and environmental impact assessments
Patel Engineering interview questions for designations
I applied via Company Website and was interviewed in Dec 2021. There was 1 interview round.
NATM experience refers to experience in the New Austrian Tunneling Method.
Experience in designing and constructing tunnels using NATM
Knowledge of the principles and techniques of NATM
Experience in managing NATM projects
Experience in working with NATM equipment and materials
Experience in ensuring safety and quality standards are met in NATM projects
Get interview-ready with Top Patel Engineering Interview Questions
Rate analysis for additional items involves considering various factors and using appropriate methods to determine the cost.
Identify the additional item and its specifications
Determine the quantity required
Research market rates for similar items
Consider factors like labor, materials, equipment, and overhead costs
Calculate the total cost using appropriate rate analysis methods
Example: Rate analysis for installing additi
Material reconciliation is the process of comparing the actual materials used in a project with the planned quantities to identify any discrepancies.
Material reconciliation involves comparing the actual quantities of materials used in a project with the quantities that were planned or estimated.
It helps in identifying any discrepancies or variations between the planned and actual materials, which can be useful for cost...
To raise an Escalation Bill as a Project Engineer, you need to follow certain parameters.
Identify the need for escalation based on project issues or delays
Gather all relevant information and documentation related to the escalation
Prepare a detailed report outlining the problem, its impact, and potential solutions
Present the escalation bill to the appropriate stakeholders or management
Follow up on the escalation and ens
Rate analysis for concrete and underground excavation involves determining the cost of materials, labor, and equipment required for the project.
Rate analysis is a process of calculating the rates of various items involved in a construction project.
For concrete, rate analysis includes determining the cost of cement, sand, aggregates, water, and additives.
The rates are calculated based on the quantities required for a sp...
Top trending discussions
posted on 4 Jun 2024
I applied via Approached by Company and was interviewed in Dec 2023. There were 4 interview rounds.
Easy to Moderate Level Questions
posted on 23 Feb 2023
Bulk modulus is a measure of a material's resistance to compression under pressure.
It is a measure of a material's compressibility
It is defined as the ratio of change in pressure to the fractional volume compression
It is used in the study of elasticity and fluid mechanics
Examples of materials with high bulk modulus include diamond and steel
Examples of materials with low bulk modulus include rubber and foam
G constant is required during sand bulking to account for the change in volume due to the presence of air voids.
G constant is used to calculate the volume of sand when it is in a loose state.
The presence of air voids in sand causes it to increase in volume, which is known as bulking.
The amount of bulking depends on the moisture content and the type of sand.
G constant is determined experimentally by comparing the volume...
I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
Some of the top questions asked at the Patel Engineering Project Engineer interview -
based on 4 interviews
1 Interview rounds
based on 27 reviews
Rating in categories
Project Engineer
133
salaries
| ₹3.6 L/yr - ₹9.9 L/yr |
Assistant Manager
74
salaries
| ₹5.5 L/yr - ₹13.4 L/yr |
Civil Engineer
69
salaries
| ₹2.7 L/yr - ₹6.1 L/yr |
Mechanical Engineer
37
salaries
| ₹2.6 L/yr - ₹7.2 L/yr |
Deputy Manager
35
salaries
| ₹7.3 L/yr - ₹16 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA