Filter interviews by
Rate analysis for additional items involves considering various factors and using appropriate methods to determine the cost.
Identify the additional item and its specifications
Determine the quantity required
Research market rates for similar items
Consider factors like labor, materials, equipment, and overhead costs
Calculate the total cost using appropriate rate analysis methods
Example: Rate analysis for installing additi
Material reconciliation is the process of comparing the actual materials used in a project with the planned quantities to identify any discrepancies.
Material reconciliation involves comparing the actual quantities of materials used in a project with the quantities that were planned or estimated.
It helps in identifying any discrepancies or variations between the planned and actual materials, which can be useful for cost...
To raise an Escalation Bill as a Project Engineer, you need to follow certain parameters.
Identify the need for escalation based on project issues or delays
Gather all relevant information and documentation related to the escalation
Prepare a detailed report outlining the problem, its impact, and potential solutions
Present the escalation bill to the appropriate stakeholders or management
Follow up on the escalation and ens
Rate analysis for concrete and underground excavation involves determining the cost of materials, labor, and equipment required for the project.
Rate analysis is a process of calculating the rates of various items involved in a construction project.
For concrete, rate analysis includes determining the cost of cement, sand, aggregates, water, and additives.
The rates are calculated based on the quantities required for a sp...
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Project coordination involves overseeing and managing various aspects of a project to ensure successful completion.
Developing project plans and timelines
Coordinating with team members and stakeholders
Monitoring progress and addressing any issues
Ensuring project goals are met within budget and timeline
Communicating updates and milestones to stakeholders
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
Patel Engineering interview questions for popular designations
I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.
Components of dams include spillways, gates, reservoir, and embankment.
Spillways are structures that allow excess water to flow out of the dam.
Gates are used to control the flow of water through the dam.
Reservoir is the body of water created by the dam.
Embankment is the structure that holds back the water in the reservoir.
Other components may include intake structures, powerhouses, and fish ladders.
Get interview-ready with Top Patel Engineering Interview Questions
When someone leaves work early, I address the situation by communicating with them and their supervisor to understand the reason and ensure work responsibilities are covered.
Communicate with the person who left early to understand the reason for their departure
Discuss with their supervisor to ensure work responsibilities are covered
Address any potential impact on team or project deadlines
Consider implementing policies ...
We use a digital time tracking system where employees clock in and out using their employee ID.
Employees use their employee ID to clock in and out
Digital time tracking system records attendance
Supervisors can monitor attendance in real-time
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
Consumption order settlement in SAP involves closing the order by settling the costs incurred against it.
Navigate to the settlement transaction in SAP (e.g. KO88 for order settlement)
Enter the order number and select the relevant parameters for settlement
Review and confirm the settlement to close the consumption order
There are many types of Transaction codes (T-codes) used in SAP for various functions.
T-codes for financial transactions (e.g. F-02 for posting journal entries)
T-codes for material management (e.g. MM01 for creating material master)
T-codes for human resources (e.g. PA30 for maintaining HR master data)
T-codes for sales and distribution (e.g. VA01 for creating sales order)
Tipper, Excavator, and Boom Placer are heavy machinery used in construction. Each has specific technical specifications.
Tipper: Capacity ranges from 5 to 30 tons, engine power varies from 100 to 400 HP, and dump angle is typically around 45 degrees.
Excavator: Operating weight can be between 3 to 200 tons, engine power ranges from 20 to 1000 HP, and digging depth varies from 6 to 20 meters.
Boom Placer: Boom length can r...
I applied via Walk-in
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
Some of the top questions asked at the Patel Engineering interview -
The duration of Patel Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 43 interviews
Interview experience
based on 540 reviews
Rating in categories
Project Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
63
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Surveyor
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA