Q1. How you do the rate analysis for additional item and what are the things which you need to be considered during rate analysis with an example.

Ans.

Rate analysis for additional items involves considering various factors and using appropriate methods to determine the cost.

  • Identify the additional item and its specifications

  • Determine the quantity required

  • Research market rates for similar items

  • Consider factors like labor, materials, equipment, and overhead costs

  • Calculate the total cost using appropriate rate analysis methods

  • Example: Rate analysis for installing additional electrical outlets in a building

Add your answer

Q2. What is material reconciliation, Escalation Bill?

Ans.

Material reconciliation is the process of comparing the actual materials used in a project with the planned quantities to identify any discrepancies.

  • Material reconciliation involves comparing the actual quantities of materials used in a project with the quantities that were planned or estimated.

  • It helps in identifying any discrepancies or variations between the planned and actual materials, which can be useful for cost control and project management.

  • The process typically invo...read more

Add your answer

Q3. How you raise Escalation Bill and what are the perameter?

Ans.

To raise an Escalation Bill as a Project Engineer, you need to follow certain parameters.

  • Identify the need for escalation based on project issues or delays

  • Gather all relevant information and documentation related to the escalation

  • Prepare a detailed report outlining the problem, its impact, and potential solutions

  • Present the escalation bill to the appropriate stakeholders or management

  • Follow up on the escalation and ensure timely resolution

Add your answer

Q4. 2. What is powder factor and how to calculate powder factor

Ans.

Powder factor is the amount of explosive required to break a unit volume of rock in blasting operations.

  • Powder factor is calculated by dividing the total amount of explosive used by the volume of rock being blasted.

  • The formula for powder factor is: Powder Factor = Total mass of explosives / Volume of rock being blasted.

  • Powder factor is typically measured in units of kg/m3 or lb/yd3.

  • A higher powder factor indicates a more efficient use of explosives in breaking the rock.

  • Powder...read more

Add your answer
Discover Deepak Novochem Technologies interview dos and don'ts from real experiences

Q5. EXPLAIN Rate analysis for concrete and underground excavation?

Ans.

Rate analysis for concrete and underground excavation involves determining the cost of materials, labor, and equipment required for the project.

  • Rate analysis is a process of calculating the rates of various items involved in a construction project.

  • For concrete, rate analysis includes determining the cost of cement, sand, aggregates, water, and additives.

  • The rates are calculated based on the quantities required for a specific volume of concrete.

  • For underground excavation, rate...read more

Add your answer

Q6. Hydraulic design of structure and tunnel designing concepts

Ans.

Hydraulic design involves the use of fluid mechanics to design structures and tunnels that can withstand water pressure.

  • Understanding of fluid mechanics and hydraulic principles

  • Knowledge of materials and their properties

  • Ability to use software such as AutoCAD and ANSYS

  • Experience with designing drainage systems and water management

  • Familiarity with safety regulations and environmental impact assessments

Add your answer

Q7. 1. What's is NATM process?

Ans.

NATM stands for New Austrian Tunneling Method, a construction method for tunnels and underground spaces.

  • Construction method for tunnels and underground spaces

  • Involves excavation, support, and monitoring

  • Developed in Austria in the 1960s

  • Uses a combination of rock bolts, shotcrete, and steel ribs for support

Add your answer

Q8. NATM experience

Ans.

NATM experience refers to experience in the New Austrian Tunneling Method.

  • Experience in designing and constructing tunnels using NATM

  • Knowledge of the principles and techniques of NATM

  • Experience in managing NATM projects

  • Experience in working with NATM equipment and materials

  • Experience in ensuring safety and quality standards are met in NATM projects

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Project Engineer Interview Questions from Similar Companies

4.1
 • 24 Interview Questions
4.2
 • 19 Interview Questions
4.1
 • 10 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter