I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.
Cutting 150 hill in 60 degree slope requires careful planning and execution.
Conduct a thorough survey of the area to determine the best approach
Use heavy machinery such as excavators and bulldozers to remove the hill
Ensure safety measures are in place to prevent accidents
Consider environmental impact and take necessary precautions
Consult with experts in the field for advice and guidance
Protection in 150m height can be achieved through various means.
Use of safety harness and fall protection equipment
Installation of guardrails and safety nets
Implementation of a comprehensive safety plan
Regular inspection and maintenance of equipment
Training and education of workers on safety procedures
The grade of bitumen used in hill areas depends on the temperature and altitude of the region.
The higher the altitude, the harder the bitumen used.
The temperature also plays a crucial role in determining the grade of bitumen.
For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.
In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform
Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.
Use a mix design with low water-cement ratio and proper amount of cement and admixtures.
Ensure proper curing by covering the concrete with blankets or insulating materials.
Protect the concrete from freezing by using heaters or insulating blankets.
Monitor the temperature of the concrete and the environment during and after p...
Cavity in tunnels can be protected by using various methods.
Waterproofing the tunnel lining
Using grouting techniques to fill the cavity
Installing drainage systems to prevent water accumulation
Regular inspections and maintenance
Using shotcrete to reinforce the tunnel lining
Applying rock bolts to stabilize the surrounding rock
Using steel ribs to support the tunnel lining
Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.
Cycle time can vary depending on the type of tunnel and the process being carried out.
For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.
In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.
Ef...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction.
NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.
It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.
NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.
Examples ...
The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.
The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.
Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.
It is important to carefully plan and execute ...
Proholes is not a known term in engineering. No data available.
Drain holes are necessary to prevent water accumulation and damage to structures or equipment.
Drain holes allow water to escape from areas where it can cause damage or corrosion.
They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.
Drain holes can also be used in machinery to prevent damage from water or other liquids.
Proper placement and size of drain holes is important to ens
The amount of accelerator used in shotcrete depends on various factors.
The type of accelerator used affects the amount required.
The desired strength and setting time also play a role.
The ambient temperature and humidity can affect the amount needed.
Typically, 1-5% of the cement weight is used as accelerator.
The manufacturer's recommendations should be followed for best results.
Top trending discussions
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
posted on 4 Jun 2024
I applied via Approached by Company and was interviewed in Dec 2023. There were 4 interview rounds.
Easy to Moderate Level Questions
posted on 23 Feb 2023
Bulk modulus is a measure of a material's resistance to compression under pressure.
It is a measure of a material's compressibility
It is defined as the ratio of change in pressure to the fractional volume compression
It is used in the study of elasticity and fluid mechanics
Examples of materials with high bulk modulus include diamond and steel
Examples of materials with low bulk modulus include rubber and foam
G constant is required during sand bulking to account for the change in volume due to the presence of air voids.
G constant is used to calculate the volume of sand when it is in a loose state.
The presence of air voids in sand causes it to increase in volume, which is known as bulking.
The amount of bulking depends on the moisture content and the type of sand.
G constant is determined experimentally by comparing the volume...
I applied via LinkedIn and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
posted on 10 Nov 2021
The outer diameter of HDPE pipe varies based on the intended use and specifications.
HDPE pipes are available in a range of sizes from 16mm to 2000mm.
The outer diameter of HDPE pipe is typically larger than the inner diameter.
The thickness of the pipe wall also varies based on the intended use and pressure requirements.
HDPE pipes are commonly used for water supply, gas distribution, and sewage systems.
To handle contractors and local people, we follow a structured process and execute SOPs.
We establish clear communication channels with contractors and local people.
We ensure that all parties understand the project goals and objectives.
We provide training and support to contractors and local people on the SOPs.
We monitor and evaluate the performance of contractors and local people regularly.
We address any issues or conc...
I applied via Naukri.com and was interviewed before May 2021. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Civil Site Engineer
227
salaries
| ₹2.2 L/yr - ₹8.6 L/yr |
Site Engineer
216
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Quantity Surveyor
56
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Manager
47
salaries
| ₹9.7 L/yr - ₹19.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA