Hindustan Construction Company Project Engineer Interview Questions, Process, and Tips

Updated 14 Apr 2022

Hindustan Construction Company Project Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    Interview questions from similar companies

    I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

    Interview Questionnaire 

    2 Questions

    • Q1. Precommissioning test of transformers
    • Ans. 

      Precommissioning tests of transformers ensure proper functioning and safety before energizing.

      • Visual inspection of transformer and its components

      • Measurement of insulation resistance

      • Measurement of winding resistance

      • Verification of transformer ratio and polarity

      • Verification of oil level and quality

      • Testing of protective devices

      • Verification of grounding

      • Functional testing of cooling system

      • Verification of nameplate data

    • Answered by AI
    • Q2. 11kv & 33kv overhead power line distribution
    • Ans. 

      11kv & 33kv overhead power line distribution

      • 11kv and 33kv are common voltage levels for overhead power lines

      • Overhead power lines are used to distribute electricity from power stations to consumers

      • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

      • Proper insulation and grounding is important for safety

      • Maintenance and inspection of the lines is necessary to ensure

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

    I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.

    Round 1 - Aptitude Test 

    It was pretty easy,
    Patterns, logical reasoning kinda stuff

    Round 2 - One-on-one 

    (1 Question)

    • Q1. General introduction Some questions of automobile Thermodynamics laws, Newton's law, About welding. Some general questions I remember How far have you travelled? If you get a posting in south/away from na...

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be calm, if you want to work in a construction company at sites you don't have to be extremely talented the only thing required is that you should be tough & you can handle things.
    Be honest
    Best of luck!
    Interview experience
    4
    Good
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - Technical 

    (2 Questions)

    • Q1. Size of concrete cube
    • Ans. 

      The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

      • Standard size for concrete cube is 150mm x 150mm x 150mm

      • Used for testing the compressive strength of concrete

      • Other sizes may be used for specific projects or requirements

    • Answered by AI
    • Q2. 150mm*150mm*150mm
    Interview experience
    3
    Average
    Difficulty level
    -
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

    Round 1 - Technical 

    (1 Question)

    • Q1. Mix design of PQC
    • Ans. 

      PQC mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures for pavement quality concrete.

      • PQC stands for Pavement Quality Concrete

      • Mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures

      • Factors such as strength requirements, durability, workability, and environmental conditions are considered in mix design

      • Example: A t...

    • Answered by AI
    Interview experience
    5
    Excellent
    Difficulty level
    Easy
    Process Duration
    Less than 2 weeks
    Result
    Not Selected

    I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Aptitude Test 

    Qc relented matarial testing

    Round 3 - One-on-one 

    (2 Questions)

    • Q1. Civil engineering related aggregate test
    • Q2. Seive analysis of aggregate.
    • Ans. 

      Seive analysis of aggregate is a method used to determine the particle size distribution of aggregates.

      • Seive analysis involves passing a sample of aggregate through a series of sieves with progressively smaller openings.

      • The amount of material retained on each sieve is weighed and used to calculate the percentage of material passing through each sieve.

      • The results of seive analysis are used to determine the gradation of ...

    • Answered by AI

    Interview Preparation Tips

    Topics to prepare for H.G. Infra Engineering Quality Engineer interview:
    • Sand testing
    Interview preparation tips for other job seekers - The vest aparchuntis of this platform
    Interview experience
    4
    Good
    Difficulty level
    Easy
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

    Round 1 - HR 

    (3 Questions)

    • Q1. Where did you worked before this company
    • Ans. 

      I previously worked at XYZ Company as a Quality Engineer for 3 years.

      • Worked at XYZ Company as a Quality Engineer

      • Experience of 3 years in the role

      • Implemented quality control processes and procedures

      • Collaborated with cross-functional teams to improve product quality

    • Answered by AI
    • Q2. What is your role in your previous company
    • Ans. 

      I was responsible for ensuring the quality of products and processes in my previous company.

      • Developed and implemented quality control procedures

      • Conducted quality audits and inspections

      • Collaborated with cross-functional teams to address quality issues

      • Provided training on quality standards and best practices

    • Answered by AI
    • Q3. Why we hire you

    Interview Preparation Tips

    Interview preparation tips for other job seekers - We have any work experience in our previous companies, but here we join as fresher not here only all over at any company

    I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. Steel and SHUTTERING, project management
    • Q2. Hook lenght, deduction of steel in bends

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be positive always , face with your knowledge and attitude
    Interview experience
    5
    Excellent
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (3 Questions)

    • Q1. About last company works
    • Q2. About steel and concrete
    • Q3. Handling labours and supervisors
    Round 3 - HR 

    (2 Questions)

    • Q1. About last paid salary
    • Q2. 1)Marital status 2) accomodation
    Interview experience
    3
    Average
    Difficulty level
    Moderate
    Process Duration
    -
    Result
    Selected Selected

    I applied via Referral and was interviewed in Feb 2023. There were 3 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. Introduction. Subjects have you in confidence. About project had you done in your college, what's your role.
    • Q2. Are you able to doing this work.
    Round 3 - HR 

    (2 Questions)

    • Q1. Self introduction and family background
    • Q2. Is there any problem in time shifting (A/B/C)
    • Ans. 

      Time shifting can cause problems in quality control.

      • Time shifting can lead to incorrect data analysis and interpretation.

      • It can also cause delays in identifying and addressing quality issues.

      • Examples include delayed detection of defects in production processes or incorrect measurements due to time differences.

      • Proper time synchronization and documentation can help prevent time shifting problems.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be Prepare yourself in whatever you write in your resume.

    Hindustan Construction Company Interview FAQs

    What are the top questions asked in Hindustan Construction Company Project Engineer interview?

    Some of the top questions asked at the Hindustan Construction Company Project Engineer interview -

    1. How much asscelerate we used in shotcr...read more
    2. What is proholes and what it's u...read more
    3. How to cut 150 hill in 60 degree sl...read more

    Tell us how to improve this page.

    Hindustan Construction Company Project Engineer Salary
    based on 10 salaries
    ₹3.5 L/yr - ₹8.3 L/yr
    At par with the average Project Engineer Salary in India
    View more details

    Hindustan Construction Company Project Engineer Reviews and Ratings

    based on 3 reviews

    4.7/5

    Rating in categories

    4.7

    Skill development

    4.7

    Work-life balance

    4.2

    Salary

    4.7

    Job security

    4.6

    Company culture

    1.5

    Promotions

    1.6

    Work satisfaction

    Explore 3 Reviews and Ratings
    Civil Site Engineer
    215 salaries
    unlock blur

    ₹1.8 L/yr - ₹7.2 L/yr

    Site Engineer
    209 salaries
    unlock blur

    ₹2.7 L/yr - ₹7.2 L/yr

    Quantity Surveyor
    54 salaries
    unlock blur

    ₹3 L/yr - ₹7.2 L/yr

    Senior Planning Engineer
    53 salaries
    unlock blur

    ₹5 L/yr - ₹8.6 L/yr

    Mechanical Engineer
    49 salaries
    unlock blur

    ₹2 L/yr - ₹6.8 L/yr

    Explore more salaries
    Compare Hindustan Construction Company with

    L&T Construction

    4.0
    Compare

    Simplex Infrastructures

    3.4
    Compare

    ITD Cementation India

    4.3
    Compare

    Ashoka Buildcon

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview