Cutting 150 hill in 60 degree slope requires careful planning and execution.
Conduct a thorough survey of the area to determine the best approach
Use heavy machinery such as excavators and bulldozers to remove the hill
Ensure safety measures are in place to prevent accidents
Consider environmental impact and take necessary precautions
Consult with experts in the field for advice and guidance
Protection in 150m height can be achieved through various means.
Use of safety harness and fall protection equipment
Installation of guardrails and safety nets
Implementation of a comprehensive safety plan
Regular inspection and maintenance of equipment
Training and education of workers on safety procedures
The grade of bitumen used in hill areas depends on the temperature and altitude of the region.
The higher the altitude, the harder the bitumen used.
The temperature also plays a crucial role in determining the grade of bitumen.
For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.
In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform
Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.
Use a mix design with low water-cement ratio and proper amount of cement and admixtures.
Ensure proper curing by covering the concrete with blankets or insulating materials.
Protect the concrete from freezing by using heaters or insulating blankets.
Monitor the temperature of the concrete and the environment during and after p...
Cavity in tunnels can be protected by using various methods.
Waterproofing the tunnel lining
Using grouting techniques to fill the cavity
Installing drainage systems to prevent water accumulation
Regular inspections and maintenance
Using shotcrete to reinforce the tunnel lining
Applying rock bolts to stabilize the surrounding rock
Using steel ribs to support the tunnel lining
Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.
Cycle time can vary depending on the type of tunnel and the process being carried out.
For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.
In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.
Ef...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction.
NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.
It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.
NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.
Examples ...
The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.
The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.
Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.
It is important to carefully plan and execute ...
Proholes is not a known term in engineering. No data available.
Drain holes are necessary to prevent water accumulation and damage to structures or equipment.
Drain holes allow water to escape from areas where it can cause damage or corrosion.
They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.
Drain holes can also be used in machinery to prevent damage from water or other liquids.
Proper placement and size of drain holes is important to ens
The amount of accelerator used in shotcrete depends on various factors.
The type of accelerator used affects the amount required.
The desired strength and setting time also play a role.
The ambient temperature and humidity can affect the amount needed.
Typically, 1-5% of the cement weight is used as accelerator.
The manufacturer's recommendations should be followed for best results.
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
It was pretty easy,
Patterns, logical reasoning kinda stuff
The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.
Standard size for concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Other sizes may be used for specific projects or requirements
posted on 24 Dec 2024
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
PQC mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures for pavement quality concrete.
PQC stands for Pavement Quality Concrete
Mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures
Factors such as strength requirements, durability, workability, and environmental conditions are considered in mix design
Example: A t...
posted on 20 Nov 2023
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Qc relented matarial testing
Seive analysis of aggregate is a method used to determine the particle size distribution of aggregates.
Seive analysis involves passing a sample of aggregate through a series of sieves with progressively smaller openings.
The amount of material retained on each sieve is weighed and used to calculate the percentage of material passing through each sieve.
The results of seive analysis are used to determine the gradation of ...
posted on 11 Nov 2024
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I previously worked at XYZ Company as a Quality Engineer for 3 years.
Worked at XYZ Company as a Quality Engineer
Experience of 3 years in the role
Implemented quality control processes and procedures
Collaborated with cross-functional teams to improve product quality
I was responsible for ensuring the quality of products and processes in my previous company.
Developed and implemented quality control procedures
Conducted quality audits and inspections
Collaborated with cross-functional teams to address quality issues
Provided training on quality standards and best practices
posted on 23 Dec 2022
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 13 Jul 2023
posted on 26 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 3 interview rounds.
Time shifting can cause problems in quality control.
Time shifting can lead to incorrect data analysis and interpretation.
It can also cause delays in identifying and addressing quality issues.
Examples include delayed detection of defects in production processes or incorrect measurements due to time differences.
Proper time synchronization and documentation can help prevent time shifting problems.
based on 3 reviews
Rating in categories
Civil Site Engineer
215
salaries
| ₹1.8 L/yr - ₹7.2 L/yr |
Site Engineer
209
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Quantity Surveyor
54
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Mechanical Engineer
49
salaries
| ₹2 L/yr - ₹6.8 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon