Filter interviews by
I applied via Company Website and was interviewed in Oct 2020.Β There were 4 interview rounds.
Cutting 150 hill in 60 degree slope requires careful planning and execution.
Conduct a thorough survey of the area to determine the best approach
Use heavy machinery such as excavators and bulldozers to remove the hill
Ensure safety measures are in place to prevent accidents
Consider environmental impact and take necessary precautions
Consult with experts in the field for advice and guidance
Protection in 150m height can be achieved through various means.
Use of safety harness and fall protection equipment
Installation of guardrails and safety nets
Implementation of a comprehensive safety plan
Regular inspection and maintenance of equipment
Training and education of workers on safety procedures
The grade of bitumen used in hill areas depends on the temperature and altitude of the region.
The higher the altitude, the harder the bitumen used.
The temperature also plays a crucial role in determining the grade of bitumen.
For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.
In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform
Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.
Use a mix design with low water-cement ratio and proper amount of cement and admixtures.
Ensure proper curing by covering the concrete with blankets or insulating materials.
Protect the concrete from freezing by using heaters or insulating blankets.
Monitor the temperature of the concrete and the environment during and after p...
Cavity in tunnels can be protected by using various methods.
Waterproofing the tunnel lining
Using grouting techniques to fill the cavity
Installing drainage systems to prevent water accumulation
Regular inspections and maintenance
Using shotcrete to reinforce the tunnel lining
Applying rock bolts to stabilize the surrounding rock
Using steel ribs to support the tunnel lining
Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.
Cycle time can vary depending on the type of tunnel and the process being carried out.
For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.
In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.
Ef...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction.
NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.
It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.
NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.
Examples ...
The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.
The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.
Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.
It is important to carefully plan and execute ...
Proholes is not a known term in engineering. No data available.
Drain holes are necessary to prevent water accumulation and damage to structures or equipment.
Drain holes allow water to escape from areas where it can cause damage or corrosion.
They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.
Drain holes can also be used in machinery to prevent damage from water or other liquids.
Proper placement and size of drain holes is important to ens
The amount of accelerator used in shotcrete depends on various factors.
The type of accelerator used affects the amount required.
The desired strength and setting time also play a role.
The ambient temperature and humidity can affect the amount needed.
Typically, 1-5% of the cement weight is used as accelerator.
The manufacturer's recommendations should be followed for best results.
I applied via Walk-in and was interviewed in Aug 2024.Β There were 2 interview rounds.
The thickness of a tile can vary depending on the type and size of the tile being used.
Tile thickness typically ranges from 1/4 inch to 3/4 inch.
Larger tiles may have a thicker thickness to support their weight.
Thin tiles are often used for wall applications, while thicker tiles are used for flooring.
Porcelain tiles are usually thicker than ceramic tiles.
The thickness of marble can vary depending on the type and purpose, but it is typically between 3/4 inch to 1 1/4 inches.
Marble thickness can range from 3/4 inch to 1 1/4 inches
Thicker marble is often used for countertops and flooring
Thinner marble may be used for wall cladding or decorative purposes
The process of flooring involves selecting the appropriate materials, preparing the subfloor, laying the flooring material, and finishing with trim.
Selecting the appropriate flooring material based on the location and usage (e.g. hardwood, laminate, tile, carpet)
Preparing the subfloor by ensuring it is clean, level, and dry
Laying the flooring material according to manufacturer's instructions, starting from the center o...
Types of tiles include ceramic, porcelain, glass, and natural stone. Cement ratio in tile installation varies depending on the type of tile and substrate.
Types of tiles: ceramic, porcelain, glass, natural stone
Cement ratio varies based on tile type and substrate
Ceramic tiles typically require a 1:4 cement to water ratio for installation
Porcelain tiles may need a 1:3 cement to water ratio for proper adhesion
Flooring process involves selecting materials, preparing the subfloor, installing the flooring, and finishing with trim.
Selecting appropriate flooring material based on budget, durability, and aesthetics (e.g. hardwood, laminate, tile, carpet)
Preparing the subfloor by ensuring it is clean, level, and dry before installation
Installing the flooring by following manufacturer's instructions and using proper tools (e.g. adh...
The cement ratio for flooring depends on the type of flooring and the strength required.
The typical cement ratio for standard concrete flooring is 1:2:4 (cement:sand:aggregate)
For high strength flooring, the ratio can be increased to 1:1.5:3
For decorative or polished concrete flooring, a lower water-cement ratio is used to achieve a smoother finish
Be careful any problem with sefty me & other
Safety is first every work in maintenance & brack down important is safety without safety no work i ignore it
No knowledge work no should bhi try to repair & change
I applied via Walk-in and was interviewed in Oct 2024.Β There was 1 interview round.
Hindustan Construction Company interview questions for popular designations
I applied via Approached by Company and was interviewed in Sep 2024.Β There were 2 interview rounds.
I am a dedicated HSE Engineer with a strong background in ensuring workplace safety and compliance with regulations.
Experienced in conducting safety inspections and audits
Skilled in developing and implementing safety procedures and protocols
Proficient in conducting risk assessments and incident investigations
Strong communication and interpersonal skills for training and educating employees on safety practices
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge
Interested in exploring new opportunities for career advancement
Seeking a company with a stronger focus on safety and compliance
Want to work in a more dynamic and innovative environment
Hierarchy of control refers to a system used to minimize or eliminate hazards in the workplace by prioritizing control measures.
Elimination - removing the hazard completely (e.g. replacing a toxic chemical with a safer alternative)
Substitution - replacing the hazard with a less hazardous alternative (e.g. using a less toxic cleaning product)
Engineering controls - isolating people from the hazard (e.g. installing ventil...
Get interview-ready with Top Hindustan Construction Company Interview Questions
I applied via Recruitment Consulltant and was interviewed in Dec 2024.Β There was 1 interview round.
Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material
I applied via Naukri.com and was interviewed in Jan 2024.Β There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I applied via Company Website and was interviewed in Jul 2024.Β There was 1 interview round.
I applied via Company Website and was interviewed in May 2024.Β There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jan 2024.Β There was 1 interview round.
The thickness of floor tiles can vary depending on the type and material used.
Floor tiles can range in thickness from 1/4 inch to 3/4 inch.
Common thickness for ceramic tiles is around 1/4 inch.
Porcelain tiles are typically thicker, around 3/8 inch to 1/2 inch.
Natural stone tiles can vary in thickness depending on the type of stone.
Thin tiles, known as slim tiles, can be as thin as 3mm.
Thicker tiles are more durable and
Types of tiles include ceramic, porcelain, glass, mosaic, and natural stone.
Ceramic tiles are made from clay and other natural materials, and are popular for their durability and versatility.
Porcelain tiles are also made from clay but are denser and less porous than ceramic tiles, making them more water-resistant.
Glass tiles are known for their unique appearance and ability to reflect light, making them popular for bac...
Top trending discussions
The duration of Hindustan Construction Company interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 77 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Civil Site Engineer
215
salaries
| βΉ1.8 L/yr - βΉ7.2 L/yr |
Site Engineer
209
salaries
| βΉ2.7 L/yr - βΉ7.2 L/yr |
Quantity Surveyor
54
salaries
| βΉ3 L/yr - βΉ7.2 L/yr |
Senior Planning Engineer
53
salaries
| βΉ5 L/yr - βΉ8.6 L/yr |
Mechanical Engineer
49
salaries
| βΉ2 L/yr - βΉ6.8 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon