Q1. How much asscelerate we used in shotcrete

Ans.

The amount of accelerator used in shotcrete depends on various factors.

  • The type of accelerator used affects the amount required.

  • The desired strength and setting time also play a role.

  • The ambient temperature and humidity can affect the amount needed.

  • Typically, 1-5% of the cement weight is used as accelerator.

  • The manufacturer's recommendations should be followed for best results.

Add your answer

Q2. What is proholes and what it's uses

Ans.

Proholes is not a known term in engineering. No data available.

    Add your answer

    Q3. How to cut 150 hill in 60 degree slope

    Ans.

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

    Add your answer

    Q4. How we do Protection in 150m height

    Ans.

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

    Add your answer
    Discover Reliance Industries interview dos and don'ts from real experiences

    Q5. How do we protect cavity in tunnel

    Ans.

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

    Add your answer

    Q6. Which grade of bitumin used in hill area

    Ans.

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deformation.

    Add your answer
    Are these interview questions helpful?

    Q7. How much we drill holes in face

    Ans.

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute drilling operations to ensure the safety of workers and th...read more

    Add your answer

    Q8. How do we concrete in min temp

    Ans.

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after placement.

    • Consider using accelerators to speed up the setti...read more

    Add your answer
    Share interview questions and help millions of jobseekers 🌟

    Q9. Why is drain holes we do

    Ans.

    Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

    • Drain holes allow water to escape from areas where it can cause damage or corrosion.

    • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

    • Drain holes can also be used in machinery to prevent damage from water or other liquids.

    • Proper placement and size of drain holes is important to ensure effective drainage and prevent clogging.

    Add your answer

    Q10. NATM full form

    Ans.

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples of NATM projects include the Channel Tunnel between Englan...read more

    Add your answer

    Q11. Cycle time in tunnel

    Ans.

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Efficient cycle time management is important for optimizing ...read more

    Add your answer
    Contribute & help others!
    Write a review
    Share interview
    Contribute salary
    Add office photos
    Interview Tips & Stories
    Ace your next interview with expert advice and inspiring stories

    Top Project Engineer Interview Questions from Similar Companies

    3.7
     • 284 Interview Questions
    4.1
     • 24 Interview Questions
    4.2
     • 19 Interview Questions
    4.1
     • 10 Interview Questions
    View all
    Share an Interview
    Stay ahead in your career. Get AmbitionBox app
    qr-code
    Helping over 1 Crore job seekers every month in choosing their right fit company
    70 Lakh+

    Reviews

    5 Lakh+

    Interviews

    4 Crore+

    Salaries

    1 Cr+

    Users/Month

    Contribute to help millions
    Get AmbitionBox app

    Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

    Follow us
    • Youtube
    • Instagram
    • LinkedIn
    • Facebook
    • Twitter