QA/QC Engineers ensure construction quality and compliance with standards through inspections, testing, and documentation.
Conduct regular site inspections to ensure compliance with project specifications and standards.
Review and approve materials and equipment before use, ensuring they meet quality requirements.
Implement and maintain a quality management system to track and document quality-related issues.
Coordinate wi...
The root cause of a Non-Conformance Report (NCR) often stems from process failures, inadequate training, or lack of adherence to standards.
Process Failures: Inadequate procedures can lead to errors, e.g., missing steps in a manufacturing process.
Inadequate Training: Employees not properly trained may misinterpret procedures, e.g., incorrect use of equipment.
Lack of Adherence to Standards: Ignoring established protocols...
Controlling cracking in concrete during casting involves proper mix design, curing, and environmental management.
Use proper mix design: Ensure the concrete mix has the right water-cement ratio to minimize shrinkage.
Control temperature: Avoid casting in extreme temperatures; use insulation or cooling methods if necessary.
Implement curing methods: Apply curing compounds or cover with wet burlap to retain moisture and pre...
RFI (Request for Information) is a formal process to clarify project details and resolve uncertainties in construction and engineering.
Initiation: An RFI is typically initiated by a contractor or subcontractor when they need clarification on project specifications.
Submission: The RFI is submitted to the relevant party, often the architect or project manager, detailing the specific information needed.
Response: The recip...
MIS stands for Management Information System, which supports decision-making through data management and analysis.
MIS integrates data from various sources to provide comprehensive reports.
It helps in tracking performance metrics, such as sales figures or production rates.
Example: A retail MIS can analyze sales data to identify trends and optimize inventory.
MIS can enhance communication within an organization by providi...
PWHT stands for Post Weld Heat Treatment, a process used to reduce residual stresses and improve the mechanical properties of welded joints.
PWHT involves heating the welded component to a specific temperature for a certain period of time, followed by controlled cooling.
The process helps to eliminate hydrogen cracking, improve toughness, and reduce distortion in the welded joint.
Common methods of PWHT include furnace he...
WQT range refers to the range of values for Water Quality Testing in a specific context.
WQT range can vary depending on the parameters being tested, such as pH, turbidity, dissolved oxygen, etc.
For example, the WQT range for pH in drinking water may be 6.5-8.5.
Monitoring and maintaining WQT range is crucial for ensuring safe and clean water supply.
Regular testing and analysis of water samples help in determining if the
LPT acceptance criteria ensure that the test results meet specified requirements.
Test results must meet specified requirements outlined in the acceptance criteria
Acceptance criteria should be clearly defined and documented
Criteria may include specific performance metrics or thresholds
Examples: minimum tensile strength, maximum elongation percentage
I applied via Naukri.com and was interviewed before Feb 2023. There were 3 interview rounds.
Quality assurance is the process of ensuring that products or services meet specified requirements and standards.
Quality assurance involves creating and implementing processes and procedures to prevent defects or errors in products or services.
It includes activities such as planning, designing, testing, and monitoring to ensure that quality standards are met.
Quality assurance aims to improve customer satisfaction by de...
A proactive process to implement activities involves identifying potential issues, taking preventive measures, and continuously improving the quality of work.
Identify potential risks and issues before they occur
Develop and implement preventive measures
Regularly review and update processes and procedures
Encourage open communication and collaboration within the team
Provide training and support to ensure everyone understa...
I appeared for an interview in Nov 2022.
The required concrete aggregate crushing value is determined by testing the strength of the aggregate.
The crushing value should not exceed a certain limit to ensure the quality of the concrete.
It is typically measured using a compression testing machine.
The standard limit for aggregate crushing value is usually around 30-45% for concrete used in construction.
Yes, I have conducted the highest grade of concrete in various construction projects.
I have experience working with Grade 60 and Grade 80 concrete mixes.
I have overseen the testing and quality control of Grade 100 concrete for a high-rise building project.
I have ensured that the concrete mix design met the required specifications and standards for strength and durability.
I am open to discussing salary based on the responsibilities and requirements of the position.
Salary expectations are based on industry standards and the specific job responsibilities.
I am flexible and open to negotiation based on the overall compensation package.
I am more focused on finding the right fit for my skills and experience rather than a specific salary number.
Tata Projects interview questions for designations
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
Get interview-ready with Top Tata Projects Interview Questions
The concrete workability testing process involves evaluating the ease of placing, compacting, and finishing concrete.
Conduct slump test to measure the consistency of fresh concrete.
Perform flow table test to determine the flowability of self-compacting concrete.
Use the Vebe test to assess the workability of concrete with vibration.
Conduct compaction factor test to measure the workability of heavily reinforced concrete.
...
I applied via Naukri.com
Process piping works involve the installation, inspection, and maintenance of pipes used in industrial processes.
Process piping works include the design, fabrication, and installation of pipes for conveying fluids or gases in industrial settings.
QA QC engineers ensure that the piping systems meet the required standards and specifications.
Inspection and testing of process piping is done to check for leaks, pressure, and...
Bolts tightening procedure involves following a specific torque value and sequence to ensure proper fastening of bolts.
Check the torque value specified in the design or manual
Use a torque wrench to tighten the bolts to the specified value
Tighten the bolts in a specific sequence to ensure even distribution of load
Recheck the torque value after tightening all bolts
Record the torque value and sequence for future reference
Hydrotest and pneumatic test are methods used to test the integrity of piping systems.
Hydrotest involves filling the piping system with water and pressurizing it to a specified level for a set duration.
Pneumatic test involves filling the piping system with compressed air or nitrogen and pressurizing it to a specified level for a set duration.
Both tests are used to ensure that the piping system can withstand the expecte...
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
based on 9 interviews
2 Interview rounds
based on 39 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹5.8 L/yr - ₹17 L/yr |
Assistant Manager
717
salaries
| ₹4 L/yr - ₹14.8 L/yr |
Manager
413
salaries
| ₹8 L/yr - ₹22 L/yr |
Senior Engineer
390
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Safety Officer
353
salaries
| ₹2.1 L/yr - ₹7.7 L/yr |
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company
KEC International