Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves collaboration with architects, contractors, an...
The construction of a 33kV Substation depends on various factors such as location, size, design, and availability of materials.
Construction time can vary based on the complexity of the project and the efficiency of the construction team.
Availability of all materials on time is crucial to avoid delays in the construction process.
Factors like weather conditions, permits, and inspections can also impact the construction t...
Density of steel is higher than fresh water and sea water.
Density of steel is around 7850 kg/m^3
Density of fresh water is around 1000 kg/m^3
Density of sea water is around 1025 kg/m^3
On subject matter related to legal compliance.
Tata Projects interview questions for designations
Get interview-ready with Top Tata Projects Interview Questions
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I worked at XYZ Company as a Deputy Manager.
Managed a team of 10 employees
Implemented new strategies to increase productivity
Achieved a 20% increase in sales within the first year
Streamlined processes to improve efficiency
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Cracks in PQC occur due to various reasons such as improper curing, poor quality of materials, and inadequate thickness. Tests and checks performed during PQC include slump test, compressive strength test, and surface hardness test. Pre-checks include ensuring proper subgrade preparation and post-checks include checking for cracks and surface defects. Cracks can be arrested by using epoxy injection or polyurethane grou...
I have experience in airfield marking using various types of markings such as runway centerline, taxiway edge, and hold line markings.
I have used paint and thermoplastic materials for marking.
I have followed FAA regulations and guidelines for marking dimensions and placement.
I have also assisted in the maintenance and repainting of existing markings.
Examples of markings I have done include runway threshold markings, to...
I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Oct 2022. There were 4 interview rounds.
Quantity surveying is the process of managing costs and budgets for construction projects.
Involves estimating and monitoring costs throughout the project
Includes preparing tender documents, negotiating contracts, and valuing completed work
Helps ensure projects are completed within budget and on time
Requires knowledge of construction methods, materials, and regulations
Quantity surveyors are responsible for managing costs and budgets for construction projects.
Preparing cost estimates and budgets for construction projects
Monitoring and controlling project costs
Advising on procurement strategies to obtain the best value for money
Assessing and valuing variations to the contract
Preparing and submitting final accounts
Mode of measurement refers to the method or tool used to collect data in order to quantify a particular variable.
Different modes of measurement include self-report surveys, observational methods, and physiological measurements.
For example, in a study on stress levels, self-report surveys may be used to measure perceived stress, while physiological measurements like heart rate or cortisol levels can provide objective da...
Top trending discussions
1 Interview rounds
based on 273 reviews
Rating in categories
Deputy Manager
1.1k
salaries
| ₹5.7 L/yr - ₹17 L/yr |
Assistant Manager
713
salaries
| ₹5 L/yr - ₹14.8 L/yr |
Manager
389
salaries
| ₹8 L/yr - ₹24.1 L/yr |
Senior Engineer
373
salaries
| ₹3.5 L/yr - ₹13 L/yr |
Senior Manager
315
salaries
| ₹10.4 L/yr - ₹32.5 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company