I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Oct 2022. There were 4 interview rounds.
Quantity surveying is the process of managing costs and budgets for construction projects.
Involves estimating and monitoring costs throughout the project
Includes preparing tender documents, negotiating contracts, and valuing completed work
Helps ensure projects are completed within budget and on time
Requires knowledge of construction methods, materials, and regulations
Quantity surveyors are responsible for managing costs and budgets for construction projects.
Preparing cost estimates and budgets for construction projects
Monitoring and controlling project costs
Advising on procurement strategies to obtain the best value for money
Assessing and valuing variations to the contract
Preparing and submitting final accounts
Mode of measurement refers to the method or tool used to collect data in order to quantify a particular variable.
Different modes of measurement include self-report surveys, observational methods, and physiological measurements.
For example, in a study on stress levels, self-report surveys may be used to measure perceived stress, while physiological measurements like heart rate or cortisol levels can provide objective da...
I applied via Approached by Company and was interviewed in May 2022. There were 3 interview rounds.
(1) Introduction (2)Technical round and (3) Describe you working at all previous site.
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
The acceptable tolerance in % value during receipts depends on the company's policies and industry standards.
The acceptable tolerance in % value during receipts can vary depending on the nature of the business.
Some companies may have a strict tolerance limit of 1-2% to ensure accuracy in financial records.
Other industries, such as retail, may have a higher tolerance limit of 5-10% due to factors like pricing errors or ...
Acceptable tolerance refers to the maximum deviation allowed from a desired value or standard.
Acceptable tolerance is a measure of how much variation is considered acceptable in a particular context.
It is often used in quality control to determine if a product or process meets the required standards.
For example, if the acceptable tolerance for a weight measurement is 0.5%, a weight of 100 grams can vary by up to 0.5 gr...
Tata Projects interview questions for designations
I applied via Campus Placement and was interviewed before Jul 2022. There were 4 interview rounds.
General questions like time speed distance, clocks, seating arrangement, probability etc.
Very generic topic as earlier it was for a site engineer post.
Types of road failures, types of contracts, FIDIC red book and silver book, critical path definition
Types of road failures include rutting, cracking, potholes, and edge cracking
Types of contracts in construction projects include lump sum contracts, cost plus contracts, and unit price contracts
FIDIC red book is a standard form of contract for construction, and FIDIC silver book is for turnkey projects
Critical path is th...
Workability of concrete refers to its ease of placement and compaction. Slump value of M30 concrete is measured using a slump cone. Bar bending schedule is a document detailing the reinforcement steel bars in a structure.
Workability of concrete refers to how easily it can be mixed, placed, and compacted.
Slump value of M30 concrete is measured using a slump cone test, where the concrete is placed in the cone and then th...
To remove voids between aggregates while concreting, proper compaction techniques should be used.
Use vibrating equipment to settle the concrete and remove air voids
Ensure proper grading and mix design to minimize voids
Use additives like superplasticizers to improve workability and reduce voids
Properly consolidate the concrete by using appropriate techniques such as rodding or tamping
Get interview-ready with Top Tata Projects Interview Questions
The permissible wastage of steel and cement varies depending on the project and the contractor's agreement.
Permissible wastage of steel and cement is usually specified in the contract agreement between the contractor and the client.
The percentage of permissible wastage can vary depending on the project and the type of steel and cement being used.
In general, the permissible wastage of steel is around 3-5%, while for cem...
Reconciliation is prepared by comparing two sets of records to ensure they are in agreement.
Identify the two sets of records to be compared
Ensure that the records are complete and accurate
Match the records based on common identifiers
Identify and investigate any discrepancies
Make necessary adjustments to bring the records into agreement
Document the reconciliation process and results
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Tata Projects Deputy Manager interview -
based on 32 interviews
3 Interview rounds
based on 280 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
366
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company