The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Top trending discussions
I appeared for an interview in Aug 2017.
posted on 12 May 2024
I applied via Approached by Company
Yes, code is a mode of measurement used in quantity surveying.
Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.
It helps in accurately estimating the quantities of materials and labor required for a project.
Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
It was pretty easy,
Patterns, logical reasoning kinda stuff
The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.
Standard size for concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Other sizes may be used for specific projects or requirements
posted on 24 Dec 2024
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
PQC mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures for pavement quality concrete.
PQC stands for Pavement Quality Concrete
Mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures
Factors such as strength requirements, durability, workability, and environmental conditions are considered in mix design
Example: A t...
posted on 20 Nov 2023
I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.
Qc relented matarial testing
Seive analysis of aggregate is a method used to determine the particle size distribution of aggregates.
Seive analysis involves passing a sample of aggregate through a series of sieves with progressively smaller openings.
The amount of material retained on each sieve is weighed and used to calculate the percentage of material passing through each sieve.
The results of seive analysis are used to determine the gradation of ...
Some of the top questions asked at the Hindustan Construction Company Quantity Surveyor interview -
based on 2 interviews
Interview experience
based on 11 reviews
Rating in categories
Civil Site Engineer
215
salaries
| ₹1.8 L/yr - ₹7.2 L/yr |
Site Engineer
209
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Quantity Surveyor
54
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Senior Planning Engineer
53
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Mechanical Engineer
49
salaries
| ₹2 L/yr - ₹6.8 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon