Hindustan Construction Company Quantity Surveyor Interview Questions, Process, and Tips

Updated 19 Jun 2024

Top Hindustan Construction Company Quantity Surveyor Interview Questions and Answers

  • Q1. What are work procedure in your organization in RA Bill preparation ?
  • Q2. Tell me about the importance of contact documents in any type of bill prepation.
  • Q3. Explain about the different types of bills you know about.

Hindustan Construction Company Quantity Surveyor Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. What are your exact responsibility in your organization?
  • Q2. What are your additional qualities?
  • Q3. AutoCAD, Excel, Friendly with all types of docs , Even the Contract Documents also
  • Ans. Maintain good relationship with Clients on the basis of my performance.
  • Answered by Atul anand
Round 2 - Technical 

(6 Questions)

  • Q1. What are work procedure in your organization in RA Bill preparation ?
  • Ans. 

    The work procedure in our organization for RA Bill preparation involves several steps.

    • Gathering all relevant project documents and information

    • Analyzing the project scope and specifications

    • Measuring and quantifying the work done on-site

    • Preparing detailed rate analysis for each item of work

    • Calculating the quantities and rates for each item

    • Preparing the bill of quantities (BOQ)

    • Cross-checking the BOQ with the project speci...

  • Answered by AI
  • Q2. Explain about the different types of bills you know about.
  • Ans. 

    Different types of bills in quantity surveying

    • Measurement bill: It includes the detailed measurements of various items of work.

    • Abstract bill: It provides a summary of all the measurements and quantities of work done.

    • Cost bill: It includes the cost of each item of work and the total cost of the project.

    • Final bill: It is the final settlement bill after completion of the project.

    • Interim bill: It is prepared at regular int...

  • Answered by AI
  • Q3. Tell me about the importance of contact documents in any type of bill prepation.
  • Ans. 

    Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.

    • Contact documents define the legal agreement between the parties involved in a construction project.

    • They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.

    • Contact documents provide clarity...

  • Answered by AI
  • Q4. How reconciliation performed?
  • Ans. 

    Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.

    • Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.

    • The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.

    • Reconciliation can be performed manually or using softw...

  • Answered by AI
  • Q5. What are the client instructions in your current project about document controlling?
  • Ans. As according to client, we have prepare and submit all the prepour and postpour docs with all test certificate if any even in mechanical or civil works before submission of Monthly RA bill.
  • Answered by Atul anand
  • Q6. Do you know AutoCAD & Excel well ?
  • Ans. 

    Yes, I am proficient in AutoCAD and Excel.

    • I have extensive experience using AutoCAD for creating and editing technical drawings.

    • I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.

    • I have successfully completed projects where I utilized both AutoCAD and Excel.

    • I am familiar with the various features and functions of both software.

    • I can efficiently generate quantity take-offs and cost es

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating yourself as according to Employer demands and market requirements and Always be honest to your interview that helps in your progress also.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Client Bill Related Question
Round 2 - One-on-one 

(1 Question)

  • Q1. Client Bill Related Question

Quantity Surveyor Interview Questions Asked at Other Companies

asked in TCE
Q1. What will you do if the site qty differ from Drawing qty
Q2. What are the evidential documents required to scrutiny the RA Bil ... read more
Q3. Deduction as per IS code for Connecte, Shuttering & Plaster
asked in AECOM
Q4. What are the components to be considered in the Rate analysis?
asked in TCE
Q5. What is reconciliation of steel

Interview questions from similar companies

I appeared for an interview in Aug 2017.

Interview Questionnaire 

2 Questions

  • Q1. Salary offer
  • Q2. Technical Question

Interview Preparation Tips

Round: HR Interview
Experience: They are offer salary upto 14,500 AED Only.

Round: HR Interview
Experience: I can't work with in that much offering salary with family staying and children studying.

Round: Technical + HR Interview
Experience: Interview success but salary not satisfy .

Skills: Technical Skill And Speaking Skill
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(1 Question)

  • Q1. Is code for the mode of measurement?
  • Ans. 

    Yes, code is a mode of measurement used in quantity surveying.

    • Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.

    • It helps in accurately estimating the quantities of materials and labor required for a project.

    • Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Basic Knowledge
  • Q2. What You Studies and about your experience
Round 2 - Technical 

(2 Questions)

  • Q1. Not specific Questions
  • Q2. Depend upon your knowledge and experience you must share with them

Interview Preparation Tips

Interview preparation tips for other job seekers - You need strong Basics if you are fresher and If you are experiance person then it's cherry on top

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

It was pretty easy,
Patterns, logical reasoning kinda stuff

Round 2 - One-on-one 

(1 Question)

  • Q1. General introduction Some questions of automobile Thermodynamics laws, Newton's law, About welding. Some general questions I remember How far have you travelled? If you get a posting in south/away from na...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm, if you want to work in a construction company at sites you don't have to be extremely talented the only thing required is that you should be tough & you can handle things.
Be honest
Best of luck!
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of concrete cube
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm for standard testing purposes.

    • Standard size for concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes may be used for specific projects or requirements

  • Answered by AI
  • Q2. 150mm*150mm*150mm
Interview experience
3
Average
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Mix design of PQC
  • Ans. 

    PQC mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures for pavement quality concrete.

    • PQC stands for Pavement Quality Concrete

    • Mix design involves determining the proportions of materials like cement, aggregates, water, and admixtures

    • Factors such as strength requirements, durability, workability, and environmental conditions are considered in mix design

    • Example: A t...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Qc relented matarial testing

Round 3 - One-on-one 

(2 Questions)

  • Q1. Civil engineering related aggregate test
  • Q2. Seive analysis of aggregate.
  • Ans. 

    Seive analysis of aggregate is a method used to determine the particle size distribution of aggregates.

    • Seive analysis involves passing a sample of aggregate through a series of sieves with progressively smaller openings.

    • The amount of material retained on each sieve is weighed and used to calculate the percentage of material passing through each sieve.

    • The results of seive analysis are used to determine the gradation of ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for H.G. Infra Engineering Quality Engineer interview:
  • Sand testing
Interview preparation tips for other job seekers - The vest aparchuntis of this platform

Hindustan Construction Company Interview FAQs

How many rounds are there in Hindustan Construction Company Quantity Surveyor interview?
Hindustan Construction Company interview process usually has 2 rounds. The most common rounds in the Hindustan Construction Company interview process are Technical, HR and One-on-one Round.
How to prepare for Hindustan Construction Company Quantity Surveyor interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Hindustan Construction Company. The most common topics and skills that interviewers at Hindustan Construction Company expect are Quantity Surveyor Activities.
What are the top questions asked in Hindustan Construction Company Quantity Surveyor interview?

Some of the top questions asked at the Hindustan Construction Company Quantity Surveyor interview -

  1. What are work procedure in your organization in RA Bill preparatio...read more
  2. Tell me about the importance of contact documents in any type of bill prepati...read more
  3. Explain about the different types of bills you know abo...read more

Tell us how to improve this page.

Hindustan Construction Company Quantity Surveyor Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Hindustan Construction Company Quantity Surveyor Salary
based on 54 salaries
₹3 L/yr - ₹7.2 L/yr
12% less than the average Quantity Surveyor Salary in India
View more details

Hindustan Construction Company Quantity Surveyor Reviews and Ratings

based on 11 reviews

3.4/5

Rating in categories

3.6

Skill development

3.7

Work-life balance

2.6

Salary

4.3

Job security

3.8

Company culture

2.9

Promotions

3.5

Work satisfaction

Explore 11 Reviews and Ratings
Civil Site Engineer
215 salaries
unlock blur

₹1.8 L/yr - ₹7.2 L/yr

Site Engineer
209 salaries
unlock blur

₹2.7 L/yr - ₹7.2 L/yr

Quantity Surveyor
54 salaries
unlock blur

₹3 L/yr - ₹7.2 L/yr

Senior Planning Engineer
53 salaries
unlock blur

₹5 L/yr - ₹8.6 L/yr

Mechanical Engineer
49 salaries
unlock blur

₹2 L/yr - ₹6.8 L/yr

Explore more salaries
Compare Hindustan Construction Company with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview