I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Top trending discussions
posted on 24 Dec 2021
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
posted on 23 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
Mode of measurement refers to the standard method used to measure quantities in construction projects.
It is important to establish a clear mode of measurement to ensure consistency and accuracy in cost estimation.
Common modes of measurement include SMM7, CESMM, and NRM.
SMM7 (Standard Method of Measurement) is widely used in the UK for building works.
CESMM (Civil Engineering Standard Method of Measurement) is used for c...
Deduction as per IS code for Connecte, Shuttering & Plaster
As per IS code, deduction for connected items is 2.5% of the total quantity
For shuttering, deduction is 10% of the total surface area
For plaster, deduction is 20% of the total surface area
These deductions are made to account for wastage and overlapping
The consumption for mortar 1:3 and 1:6 ratio depends on the area to be covered and thickness of the layer.
The consumption of mortar is calculated in terms of volume.
For 1:3 ratio, the mix proportion is 1 part cement and 3 parts sand.
For 1:6 ratio, the mix proportion is 1 part cement and 6 parts sand.
The thickness of the layer also affects the consumption of mortar.
The area to be covered is calculated by multiplying the...
posted on 26 Jan 2021
I applied via Naukri.com and was interviewed in Dec 2020. There were 4 interview rounds.
posted on 21 Dec 2024
I was interviewed before Dec 2023.
The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.
The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.
It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.
The purpose of the standard deduction is...
Material properties refer to the characteristics and behavior of materials used in construction projects.
Material properties include density, strength, durability, thermal conductivity, and elasticity.
Understanding material properties is crucial for selecting the right materials for a project.
Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.
posted on 24 Sep 2022
I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.
Some basic questions of mathematics up to 10th class.
posted on 6 Jul 2024
posted on 9 Apr 2022
I applied via Approached by Company
HDPE pipe is a type of plastic pipe used for water supply and drainage systems. A supervisor oversees the installation and maintenance of the pipes.
HDPE pipes are lightweight and flexible, making them easy to install and transport.
They are resistant to corrosion and chemicals, making them ideal for use in harsh environments.
Supervisors ensure that the pipes are installed correctly and that any issues are addressed prom...
XXXXX
posted on 5 Jul 2017
I was interviewed in Jul 2017.
Experienced Quality Engineer with a background in manufacturing and process improvement.
Bachelor's degree in Engineering
Certified Six Sigma Black Belt
Proficient in statistical analysis tools like Minitab
Led cross-functional teams to implement quality initiatives
Experience in root cause analysis and corrective action
I have a Bachelor's degree in Mechanical Engineering from XYZ University.
Bachelor's degree in Mechanical Engineering
Graduated from XYZ University
Specialized in quality control and assurance
Some of the top questions asked at the Hindustan Construction Company Quantity Surveyor interview -
based on 2 interviews
Interview experience
based on 11 reviews
Rating in categories
Site Engineer
206
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
185
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Planning Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA