Senior Quantity Surveyor
20+ Senior Quantity Surveyor Interview Questions and Answers
Q1. What is the Mix design criteria of IS 456
The mix design criteria of IS 456 refers to the specifications for designing concrete mixes.
IS 456 is the Indian Standard code of practice for plain and reinforced concrete.
The mix design criteria include the proportions of various ingredients in the concrete mix.
The criteria also consider the strength, workability, and durability requirements of the concrete.
The mix design criteria of IS 456 provide guidelines for selecting the appropriate mix proportions based on the desire...read more
Q2. What is Secured advance in client billing ?
Secured advance in client billing is a payment made by the client to the contractor before the work is completed.
It is a form of pre-payment made by the client to the contractor
It is usually made to help the contractor cover the cost of materials and labor before the work is completed
The amount of the secured advance is usually a percentage of the total contract value
The contractor must provide security for the advance, such as a bank guarantee or insurance policy
The secured ...read more
Senior Quantity Surveyor Interview Questions and Answers for Freshers
Q3. How much slump required for pumble concrete
The slump required for pumble concrete depends on various factors such as the type of construction, weather conditions, and desired workability.
Slump is a measure of the consistency or fluidity of concrete.
For pumble concrete, the slump requirement may vary depending on the specific project requirements.
In general, a slump of 4 to 6 inches is commonly used for pumble concrete.
However, it is important to consult the project specifications and design requirements to determine t...read more
Q4. how to fo manual calculation of the shuttering and volume for the construction of a building
To manually calculate shuttering and volume for building construction, measurements of the structure and materials used must be taken into account.
Calculate the area of each component of the building (walls, slabs, columns, etc.) that require shuttering.
Determine the thickness of the shuttering material to be used for each component.
Multiply the area of each component by the thickness of the shuttering material to get the volume of shuttering needed.
Consider any additional fa...read more
Q5. Shear force max at which point ?
Shear force max depends on the material and cross-sectional shape of the beam.
Shear force max is the maximum force that a beam can withstand before it fails in shear.
It depends on the material properties of the beam, such as its yield strength and modulus of elasticity.
It also depends on the cross-sectional shape of the beam, such as whether it is rectangular, circular, or I-shaped.
Calculating shear force max requires knowledge of the beam's dimensions and loading conditions....read more
Q6. types of beam. what is mean by depth variation beam
Types of beams include cantilever, simply supported, fixed, and continuous beams. Depth variation beam refers to beams with varying depths along their length.
Types of beams: cantilever, simply supported, fixed, continuous
Depth variation beam: refers to beams with varying depths along their length
Example: A beam that starts with a depth of 300mm and gradually increases to 500mm along its length
Share interview questions and help millions of jobseekers 🌟
Q7. what is the volume of concrete of a column(dimensions given)
The volume of concrete in a column can be calculated by multiplying the dimensions of the column.
Calculate the volume by multiplying the length, width, and height of the column
For example, if the column dimensions are 1m x 1m x 3m, the volume would be 3 cubic meters
Ensure all measurements are in the same unit before multiplying
Q8. Wastage percentage of diff types of work
The wastage percentage varies depending on the type of work.
Wastage percentage for construction work can range from 5% to 20% depending on the type of material used.
For electrical work, the wastage percentage can be around 2% to 5% due to damaged or defective components.
In plumbing work, the wastage percentage can be around 10% to 15% due to incorrect measurements or damaged pipes.
For painting work, the wastage percentage can be around 10% to 15% due to spillage or overspray....read more
Senior Quantity Surveyor Jobs
Q9. How do you approach reviewing payment applications.
I approach reviewing payment applications methodically and thoroughly to ensure accuracy and fairness.
Start by comparing the payment application to the contract terms and scope of work
Verify quantities, rates, and calculations for accuracy
Check for any deviations or changes that may impact the payment
Ensure all necessary documentation and supporting information is included
Communicate any discrepancies or issues with the relevant parties for resolution
Q10. What is the Miximum dosage admixture
The maximum dosage admixture depends on the type of admixture and the concrete mix design.
The maximum dosage admixture is the highest amount of admixture that can be added to a concrete mix without compromising its strength or durability.
The maximum dosage admixture varies depending on the type of admixture used, such as water reducers, air-entraining agents, or set accelerators.
The maximum dosage admixture also depends on the concrete mix design, including the type of cement...read more
Q11. what is mean by inverted beam. where we will use inverted beam
An inverted beam is a beam that is constructed below the slab level instead of above it.
Inverted beams are used to provide additional headroom in basements or underground structures.
They are also used to transfer loads from the slab to the columns or walls below.
Inverted beams are commonly used in parking garages, basements, and underground structures.
They can also be used in areas where there are height restrictions or where a flat ceiling is desired.
Q12. Chemical admixtures how many types
Chemical admixtures are substances added to concrete to enhance its properties and performance.
Chemical admixtures are used in concrete construction to improve workability, durability, and strength.
There are several types of chemical admixtures, including water-reducing admixtures, air-entraining admixtures, accelerating admixtures, and retarding admixtures.
Water-reducing admixtures reduce the amount of water needed in the concrete mix, improving its strength and workability....read more
Q13. Which code follows design mix
The code that follows design mix is the Building Code.
The Building Code provides guidelines and regulations for the design and construction of buildings.
It includes specifications for materials, structural design, fire safety, and other aspects of building construction.
Compliance with the Building Code ensures that the design mix of a building meets the required standards.
Different countries or regions may have their own specific Building Codes.
For example, in the United Stat...read more
Q14. How to calculate pipe and fittings.
Pipe and fittings are calculated based on the length and type of pipe, as well as the number and type of fittings required.
Calculate the total length of pipe needed for the project
Determine the type and size of pipe required for the project
Calculate the number and type of fittings needed based on the pipe layout
Consider factors such as bends, tees, reducers, and valves when calculating fittings
Add extra length for allowances such as cutting and threading
Q15. What is action points at site level
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necessary permits, or scheduling inspections.
Tracking and addres...read more
Q16. What is productive of a bar bender
A bar bender is productive when they efficiently bend reinforcing bars according to specifications.
Ability to accurately read and interpret construction drawings
Skill in using bending machines and tools
Knowledge of different types of reinforcement bars and bending techniques
Attention to detail to ensure bars are bent to the correct angles and dimensions
Efficiency in completing tasks to meet project deadlines
Q17. Foundation Layout and excavation as per standard.
Foundation layout and excavation must be done according to industry standards to ensure structural integrity.
Ensure foundation layout is in accordance with structural drawings and specifications
Excavate the area to the required depth and dimensions as per design requirements
Check for any underground utilities or obstructions before excavation begins
Use proper equipment and techniques to prevent damage to surrounding structures or property
Regularly inspect and monitor the exca...read more
Q18. How do you manage variations?
I manage variations by carefully reviewing the scope of work, documenting changes, assessing cost impacts, and negotiating with stakeholders.
Review the scope of work to understand the original requirements
Document any changes in scope or specifications
Assess the cost impacts of variations on the project budget
Negotiate with stakeholders to reach agreements on the changes
Q19. What is material statement
A material statement is a document that lists all the materials used in a construction project and their associated costs.
It is used by quantity surveyors to keep track of the materials used and their costs
It includes details such as the quantity, unit price, and total cost of each material
It is an important tool for budgeting and cost control in construction projects
Examples of materials that may be included in a material statement are cement, steel, bricks, and electrical w...read more
Q20. What is the education
A degree in Quantity Surveying, Construction Management, or a related field is typically required for a Senior Quantity Surveyor role.
Bachelor's degree in Quantity Surveying, Construction Management, or a related field is essential
Professional certifications such as RICS or CIOB may be preferred
Advanced degrees or specialized training can be beneficial for career advancement
Q21. What is employee growth
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Q22. What is status of company
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Q23. Explain cost estimation process?
Cost estimation process involves analyzing project requirements, materials, labor, and other factors to determine the overall cost.
Gather project requirements and specifications
Identify materials and quantities needed
Estimate labor costs based on project scope and duration
Consider overhead costs and profit margins
Use historical data and industry benchmarks for accuracy
Adjust estimates as needed based on changes in project scope or market conditions
Q24. What is rolling margin
Rolling margin is the difference between the actual cost and the estimated cost of a project, calculated at various stages of the project.
Rolling margin helps in tracking the financial performance of a project over time.
It is calculated by subtracting the estimated cost from the actual cost at different intervals.
For example, if the estimated cost of a project is $100,000 and the actual cost at the halfway point is $60,000, the rolling margin would be $40,000.
Q25. What is analysis of rates
Analysis of rates is a process of breaking down the cost of a construction project into individual components.
It involves identifying the cost of materials, labor, equipment, and other expenses required for the project.
It helps in estimating the total cost of the project and in preparing a budget.
It is used by quantity surveyors to compare the cost of different projects and to identify areas where cost savings can be made.
For example, if a project requires a large amount of c...read more
Q26. What is the name
The name of the Senior Quantity Surveyor is not provided in the question.
The name of the Senior Quantity Surveyor was not mentioned in the question.
It is important to focus on the qualifications and experience of the candidate instead of their name.
Q27. Explain in detail in depth.
The question requires a detailed and in-depth explanation of a specific topic or concept related to quantity surveying.
Start by providing a comprehensive overview of the topic being discussed
Break down the key components or processes involved in the topic
Include relevant examples or case studies to illustrate your points
Discuss any challenges or considerations that may arise in relation to the topic
Conclude by summarizing the importance or impact of the topic in the field of ...read more
Q28. What is the state
The state refers to the condition or status of something at a particular point in time.
State can refer to the physical condition of a building or structure.
State can also refer to the legal status of a project or contract.
State can also refer to the progress or completion level of a task or project.
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month