i
B.L. Kashyap & Sons
Filter interviews by
I was interviewed in Jan 2025.
Labour rate of shuttering refers to the cost of labor required for constructing formwork for concrete structures.
Labour rate of shuttering is typically calculated per square foot or square meter of formwork used.
The rate can vary depending on the complexity of the formwork design and the skill level of the laborers.
For example, the labour rate for simple wooden formwork may be lower than the rate for complex steel form...
Productivity of shuttering and reinforcement is crucial for efficient construction operations.
Productivity of shuttering can be improved by using prefabricated formwork systems
Efficient scheduling and coordination of reinforcement work can increase productivity
Regular maintenance of equipment and tools used for shuttering and reinforcement is essential
Training and upskilling of workers can also enhance productivity in
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
B.L. Kashyap & Sons interview questions for popular designations
I applied via Company Website and was interviewed in Mar 2024. There were 9 interview rounds.
Quality control is a process used to ensure that products or services meet specified requirements and standards.
Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.
It also includes identifying defects or deviations from specifications and taking corrective actions.
Quality control helps to prevent defects, improve processes, and enhance customer satisfa...
This is company at the high economy
Number system and latter
On basis of defined structure
This check the soil testing
This is growth process in the employee
Get interview-ready with Top B.L. Kashyap & Sons Interview Questions
Standard deviation is a measure of the dispersion or spread of a set of data points from the mean.
Standard deviation is calculated by taking the square root of the variance.
It indicates how much the data points deviate from the mean.
A higher standard deviation means the data points are more spread out, while a lower standard deviation means they are closer to the mean.
For example, in a set of test scores, a high standa...
Concrete grade directly affects the development length of reinforcement bars in a structure.
Higher concrete grades typically require longer development lengths for reinforcement bars to achieve the desired bond strength.
Lower concrete grades may allow for shorter development lengths, but may compromise the overall strength and durability of the structure.
Development length is influenced by factors such as bar diameter,...
Accounting involves recording, analyzing, and reporting financial transactions of a business.
Recording financial transactions
Analyzing financial data
Preparing financial statements
Budgeting and forecasting
Understanding debits and credits
I applied via Approached by Company and was interviewed in Jul 2023. There were 4 interview rounds.
The current market labour rate and material price can vary depending on location, demand, and supply.
Labour rates can be influenced by factors such as skill level, experience, and union agreements.
Material prices can fluctuate due to changes in raw material costs, transportation expenses, and market demand.
It is important to regularly monitor market trends and industry news to stay informed about labour rates and mater
I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.
SWL in wire rope stands for Safe Working Load, which is the maximum load that a wire rope can safely handle under specific conditions.
SWL is the maximum load that a wire rope can safely handle without risk of breaking.
It is determined by factors such as the type of wire rope, diameter, construction, and condition.
Exceeding the SWL can lead to failure of the wire rope and potential accidents.
SWL is usually expressed in ...
Top trending discussions
The duration of B.L. Kashyap & Sons interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 52 interviews
Interview experience
based on 495 reviews
Rating in categories
Site Engineer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
78
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Larsen & Toubro Limited
Shapoorji Pallonji Group