i
B.L. Kashyap & Sons
Filter interviews by
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
Top trending discussions
posted on 30 Jan 2024
I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.
Residence: New York, Qualification: Bachelor's degree in Civil Engineering, Hobbies: Reading, Experience: 5 years in planning and scheduling
Residence: New York
Qualification: Bachelor's degree in Civil Engineering
Hobbies: Reading
Experience: 5 years in planning and scheduling
M stands for 'Mix' in M20.
M20 is a designation for a concrete mix with a compressive strength of 20 megapascals (MPa).
The 'M' in M20 represents the word 'Mix', indicating that it is a mix of cement, sand, and aggregate.
The number following 'M' in M20 denotes the compressive strength of the concrete mix.
Different grades of concrete have different compressive strength requirements, and the 'M' designation helps in identi
Curing is necessary for concrete to ensure proper hydration and strength development.
Curing prevents moisture loss from the concrete, allowing it to maintain its desired water-cement ratio.
It helps in reducing shrinkage and cracking by providing a controlled environment for the concrete to cure.
Curing promotes the formation of calcium silicate hydrate (CSH) gel, which contributes to the strength and durability of concr...
Water is added to concrete after casting to maintain moisture content and achieve early strength and resist creep formation.
Adding water to concrete after casting helps to prevent excessive moisture loss.
Maintaining moisture content in concrete is important for proper hydration of cement particles.
Watering concrete can also help in reducing shrinkage and cracking.
By providing moisture, the concrete gains strength faste...
The steps involved in concreting include site preparation, formwork, reinforcement, mixing, pouring, leveling, finishing, and curing.
Site preparation involves clearing the area and ensuring proper drainage.
Formwork is constructed to shape and support the concrete.
Reinforcement is placed to provide strength to the concrete structure.
Concrete ingredients are mixed in the correct proportions.
The mixed concrete is poured i...
The allowable height for free fall for concrete depends on several factors.
The allowable height for free fall for concrete is typically specified by the project specifications or industry standards.
The height is influenced by factors such as the type of concrete mix, slump value, and the presence of reinforcing steel.
For example, for normal weight concrete with a slump of 3 to 4 inches and no reinforcing steel, the all...
Segregation is the separation of coarse and fine particles in concrete mix, while bleeding is the upward movement of water in fresh concrete.
Segregation occurs when the coarse aggregates settle down due to gravity, resulting in a non-uniform distribution of particles in the mix.
Bleeding happens when excess water in the concrete mix rises to the surface, leaving behind a layer of water on top.
Segregation can lead to a d...
Bleeding and segregation are common issues in concrete construction.
Bleeding occurs when excess water in the concrete mixture rises to the surface, leaving behind a layer of water.
Segregation happens when the coarse aggregates separate from the rest of the concrete mixture.
Both bleeding and segregation can negatively impact the strength and durability of the concrete.
Proper mix design, adequate compaction, and appropri...
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
Primavera P6 is a project management software used for planning, scheduling, and controlling projects.
Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
The software helps in optimizing project plans, identifying critical paths, and managing project risks.
Users can...
posted on 22 Jul 2023
Yes, I am able to fill measurement books provided by clients.
I have experience in accurately recording measurements and quantities in measurement books.
I am familiar with the format and requirements of measurement books provided by clients.
I ensure all necessary details are included in the measurement book, such as date, location, description of work, measurements, and signatures.
I am proficient in using measurement to...
Rolling margin is the difference between the planned value and the earned value at a specific point in time.
Rolling margin helps in measuring the efficiency of a project by comparing planned and actual progress.
It is calculated by subtracting the earned value from the planned value.
A positive rolling margin indicates that the project is ahead of schedule, while a negative rolling margin indicates that the project is be
Consumption ratios in civil work refer to the quantities of materials used in construction projects.
Consumption ratios vary depending on the type of civil work being done.
Common consumption ratios include cement:sand:aggregate ratios for concrete mixes.
Other consumption ratios may include steel reinforcement ratios for structural elements.
Accurate consumption ratios are essential for cost estimation and project plannin
I was interviewed in Aug 2023.
posted on 8 Apr 2024
posted on 12 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 4 interview rounds.
Demonetization, pros and cons, 5 people in the discussion. HR were friendly and make possible way to comfort the candidates.
Aptitude and technical question-mostly difficult questions.
based on 4 reviews
Rating in categories
Site Engineer
106
salaries
| ₹2 L/yr - ₹6 L/yr |
Civil Site Engineer
92
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
77
salaries
| ₹4.1 L/yr - ₹8 L/yr |
Junior Engineer
41
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Junior Engineer Civil
36
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Larsen & Toubro Limited
Shapoorji Pallonji Group