B.L. Kashyap & Sons Planning Engineer Interview Questions and Answers

Updated 20 Apr 2024

B.L. Kashyap & Sons Planning Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Basics of your previous company's project. 2. Questions regarding MSP & Primavera. 3. Sequencing of construction activities. 4. Brief knowledge of Crictical Path method. 5. Basics of Civil Engineering. ...

Interview Preparation Tips

Topics to prepare for B.L. Kashyap & Sons Planning Engineer interview:
  • MS Project
  • Primavera
Interview preparation tips for other job seekers - Focus more on your Basics.

I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with your basics

Planning Engineer Interview Questions Asked at Other Companies

Q1. Prepare a small given example site schedule with sequencing and d ... read more
Q2. What is CPI & SPI how to do that how to load resources into t ... read more
Q3. What software using for planning? How much proficiency you have o ... read more
Q4. what is clim digger function? How much total float is allowed in ... read more
asked in KPMG India
Q5. Productivity of workers and how to calculate task duration from t ... read more

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Personal Details
  • Q2. Name Residence Qualification hobbies experience etc
  • Ans. 

    Residence: New York, Qualification: Bachelor's degree in Civil Engineering, Hobbies: Reading, Experience: 5 years in planning and scheduling

    • Residence: New York

    • Qualification: Bachelor's degree in Civil Engineering

    • Hobbies: Reading

    • Experience: 5 years in planning and scheduling

  • Answered by AI
Round 2 - Technical 

(12 Questions)

  • Q1. In M20 what does M stands for
  • Ans. 

    M stands for 'Mix' in M20.

    • M20 is a designation for a concrete mix with a compressive strength of 20 megapascals (MPa).

    • The 'M' in M20 represents the word 'Mix', indicating that it is a mix of cement, sand, and aggregate.

    • The number following 'M' in M20 denotes the compressive strength of the concrete mix.

    • Different grades of concrete have different compressive strength requirements, and the 'M' designation helps in identi

  • Answered by AI
  • Q2. M stands for Mix and 20 is compressive strength after 28 days
  • Q3. Why do we need curing for concrete
  • Ans. 

    Curing is necessary for concrete to ensure proper hydration and strength development.

    • Curing prevents moisture loss from the concrete, allowing it to maintain its desired water-cement ratio.

    • It helps in reducing shrinkage and cracking by providing a controlled environment for the concrete to cure.

    • Curing promotes the formation of calcium silicate hydrate (CSH) gel, which contributes to the strength and durability of concr...

  • Answered by AI
  • Q4. After casting...concrete loss it's moisture content in order to maintain moisture content we give water to concrete to gain early strength and also resist creep formation
  • Ans. 

    Water is added to concrete after casting to maintain moisture content and achieve early strength and resist creep formation.

    • Adding water to concrete after casting helps to prevent excessive moisture loss.

    • Maintaining moisture content in concrete is important for proper hydration of cement particles.

    • Watering concrete can also help in reducing shrinkage and cracking.

    • By providing moisture, the concrete gains strength faste...

  • Answered by AI
  • Q5. Steps involved in concreting
  • Ans. 

    The steps involved in concreting include site preparation, formwork, reinforcement, mixing, pouring, leveling, finishing, and curing.

    • Site preparation involves clearing the area and ensuring proper drainage.

    • Formwork is constructed to shape and support the concrete.

    • Reinforcement is placed to provide strength to the concrete structure.

    • Concrete ingredients are mixed in the correct proportions.

    • The mixed concrete is poured i...

  • Answered by AI
  • Q6. 1.Batching 2.Mixing 3.Transportation 4.Placing 5.Compaction & Finishing
  • Q7. Allowable Height for Free fall for concrete
  • Ans. 

    The allowable height for free fall for concrete depends on several factors.

    • The allowable height for free fall for concrete is typically specified by the project specifications or industry standards.

    • The height is influenced by factors such as the type of concrete mix, slump value, and the presence of reinforcing steel.

    • For example, for normal weight concrete with a slump of 3 to 4 inches and no reinforcing steel, the all...

  • Answered by AI
  • Q8. 1.5m in order to avoid segregation and bleeding
  • Q9. Difference between segregation and bleeding
  • Ans. 

    Segregation is the separation of coarse and fine particles in concrete mix, while bleeding is the upward movement of water in fresh concrete.

    • Segregation occurs when the coarse aggregates settle down due to gravity, resulting in a non-uniform distribution of particles in the mix.

    • Bleeding happens when excess water in the concrete mix rises to the surface, leaving behind a layer of water on top.

    • Segregation can lead to a d...

  • Answered by AI
  • Q10. In bleeding water comes out from concrete and in segregation aggregate separates from concrete
  • Ans. 

    Bleeding and segregation are common issues in concrete construction.

    • Bleeding occurs when excess water in the concrete mixture rises to the surface, leaving behind a layer of water.

    • Segregation happens when the coarse aggregates separate from the rest of the concrete mixture.

    • Both bleeding and segregation can negatively impact the strength and durability of the concrete.

    • Proper mix design, adequate compaction, and appropri...

  • Answered by AI
  • Q11. Do you know about latence
  • Q12. Yes sir....when water comes out from concrete along with a cement it makes a layer on the top of the concrete that layer we call latence....

I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Previous experience in detail

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your answers short specific and clear.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Detailed about planning
  • Ans. Planning is art of creating and arranging task and activities for a certain predefined goal .
  • Answered Anonymously
  • Q2. Primavera P6 and its applications in Planning
  • Ans. 

    Primavera P6 is a project management software used for planning, scheduling, and controlling projects.

    • Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.

    • It allows users to create project schedules, allocate resources, track progress, and analyze project performance.

    • The software helps in optimizing project plans, identifying critical paths, and managing project risks.

    • Users can...

  • Answered by AI
  • Q3. Project Management
  • Q4. Cost Control and Capex

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about planning
In-Depth knowledge of your work and WBS
Primavera P6 tool
Advance Excel will added advantage
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Past experience
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Primavera p6 performanc required
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Ans. 

    The hydraulic gradient line is a line representing the total head of water at various points along a flow path in a hydraulic system.

    • It is a graphical representation of the total head of water in a hydraulic system.

    • It shows the energy level of water at different points along a flow path.

    • The slope of the hydraulic gradient line indicates the direction and rate of flow of water.

    • It is used in analyzing flow patterns and d...

  • Answered by AI
  • Q2. What are the methods for managing floods?
  • Ans. 

    Methods for managing floods include structural measures, non-structural measures, and preparedness planning.

    • Structural measures include building dams, levees, and flood walls to control water flow.

    • Non-structural measures involve land-use planning, zoning regulations, and wetland preservation to reduce flood risk.

    • Preparedness planning includes early warning systems, evacuation plans, and community education on flood saf...

  • Answered by AI
  • Q3. What is prestress concrete?
  • Ans. 

    Prestressed concrete is a type of concrete that has been compressed prior to being subjected to loads.

    • Prestressed concrete is created by introducing internal stresses in the concrete before it is subjected to external loads.

    • This compression helps to counteract the tensile stresses that the concrete will experience during use.

    • Prestressed concrete is commonly used in bridges, parking structures, and high-rise buildings.

    • E...

  • Answered by AI
  • Q4. What is Flood Wall?
  • Ans. 

    A flood wall is a structure designed to prevent flooding by holding back water.

    • Flood walls are typically made of concrete, steel, or other strong materials.

    • They are commonly used along rivers, coastlines, and other areas prone to flooding.

    • Flood walls can vary in height and design depending on the level of protection needed.

    • Examples of flood walls include the Thames Barrier in London and the flood walls along the Missis

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.

I applied via Campus Placement and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Civil basic concepts
  • Q2. What isM20,What are the types of steel,Harbour topics etc
  • Ans. 

    M20 is a grade of concrete used in construction. Steel types include mild steel, high tensile steel, and stainless steel. Harbour topics may include dredging, breakwaters, and port design.

    • M20 is a mix of concrete with a compressive strength of 20 MPa

    • Mild steel is commonly used in construction for reinforcement

    • High tensile steel has a higher strength and is used in structures with greater stress

    • Stainless steel is corros...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Types of steel & design codes of construction materials,
  • Ans. 

    Various types of steel and design codes are used in construction materials.

    • Common types of steel include carbon steel, stainless steel, and alloy steel.

    • Design codes for construction materials include ACI, AISC, ASCE, and ASTM.

    • ACI (American Concrete Institute) provides codes for concrete design.

    • AISC (American Institute of Steel Construction) provides codes for steel design.

    • ASCE (American Society of Civil Engineers) prov...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why should we hire you?

Interview Preparation Tips

Topics to prepare for Navayuga Engineering Company Site Engineer interview:
  • Concrete technology
  • Types of machines used in site
  • Strength of materials
Interview preparation tips for other job seekers - We are all well known about our stream basic concepts & Right or wrong be frank open your tongue to answer the interviewer qns

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions related pipeline

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with your basic knowledge

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons Planning Engineer interview?
B.L. Kashyap & Sons interview process usually has 1 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are Technical.
How to prepare for B.L. Kashyap & Sons Planning Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at B.L. Kashyap & Sons. The most common topics and skills that interviewers at B.L. Kashyap & Sons expect are MS Project, MSP, Planning Engineering, Primavera and Project Management.

Tell us how to improve this page.

B.L. Kashyap & Sons Planning Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
B.L. Kashyap & Sons Planning Engineer Salary
based on 14 salaries
₹4.4 L/yr - ₹7.8 L/yr
8% less than the average Planning Engineer Salary in India
View more details

B.L. Kashyap & Sons Planning Engineer Reviews and Ratings

based on 4 reviews

3.8/5

Rating in categories

2.9

Skill development

4.2

Work-life balance

3.2

Salary

3.8

Job security

3.5

Company culture

3.2

Promotions

3.5

Work satisfaction

Explore 4 Reviews and Ratings
Site Engineer
100 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Civil Site Engineer
82 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
77 salaries
unlock blur

₹4.1 L/yr - ₹8 L/yr

Junior Engineer
39 salaries
unlock blur

₹2.5 L/yr - ₹5 L/yr

Junior Engineer Civil
36 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

4.0
Compare

L & W Constructions

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview