Quality control is a process used to ensure that products or services meet specified requirements and standards.
Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.
It also includes identifying defects or deviations from specifications and taking corrective actions.
Quality control helps to prevent defects, improve processes, and enhance customer satisfa...
This is company at the high economy
Number system and latter
On basis of defined structure
This check the soil testing
This is growth process in the employee
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
Lap length is the overlap of reinforcement bars in concrete, while development length is the length of bar required to transfer stress to concrete.
Lap length is used to ensure continuity of reinforcement across a joint or splice in concrete elements.
Development length is required to develop the full strength of the reinforcement bar and transfer it to the surrounding concrete.
Lap length is typically specified in terms ...
The weight of a solid block with dimensions 400*400*200mm depends on the material it is made of.
The weight can be calculated by multiplying the volume of the block by the density of the material.
Different materials have different densities, so the weight will vary depending on the material.
To calculate the volume, multiply the length, width, and height of the block.
To find the weight, multiply the volume by the density...
Top trending discussions
posted on 11 Mar 2022
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.
Cable (stress) helps to distribute the load of the bridge evenly.
It reduces the amount of material required for construction.
It also helps to improve the stability of the bridge.
Cable (stress) is commonly used in suspension bridges.
It allows for longer spans to be constructed without the need for additional support.
Cab...
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
The hydrotest pressure is 1.5 times the design pressure.
Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.
It is usually done before commissioning the system.
For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.
The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.
Classify the base metal
Clean the surface
Align the parts to be joined
Check the root gap and root face
Measure the bevel angle
Check for any mismatch or overlap
Ensure all specifications are met
I appeared for an interview in Jan 2025.
The hydraulic gradient line is a line representing the total head of water at various points along a flow path in a hydraulic system.
It is a graphical representation of the total head of water in a hydraulic system.
It shows the energy level of water at different points along a flow path.
The slope of the hydraulic gradient line indicates the direction and rate of flow of water.
It is used in analyzing flow patterns and d...
Methods for managing floods include structural measures, non-structural measures, and preparedness planning.
Structural measures include building dams, levees, and flood walls to control water flow.
Non-structural measures involve land-use planning, zoning regulations, and wetland preservation to reduce flood risk.
Preparedness planning includes early warning systems, evacuation plans, and community education on flood saf...
Prestressed concrete is a type of concrete that has been compressed prior to being subjected to loads.
Prestressed concrete is created by introducing internal stresses in the concrete before it is subjected to external loads.
This compression helps to counteract the tensile stresses that the concrete will experience during use.
Prestressed concrete is commonly used in bridges, parking structures, and high-rise buildings.
E...
A flood wall is a structure designed to prevent flooding by holding back water.
Flood walls are typically made of concrete, steel, or other strong materials.
They are commonly used along rivers, coastlines, and other areas prone to flooding.
Flood walls can vary in height and design depending on the level of protection needed.
Examples of flood walls include the Thames Barrier in London and the flood walls along the Missis
posted on 17 Feb 2022
I applied via Campus Placement and was interviewed in Aug 2021. There were 3 interview rounds.
M20 is a grade of concrete used in construction. Steel types include mild steel, high tensile steel, and stainless steel. Harbour topics may include dredging, breakwaters, and port design.
M20 is a mix of concrete with a compressive strength of 20 MPa
Mild steel is commonly used in construction for reinforcement
High tensile steel has a higher strength and is used in structures with greater stress
Stainless steel is corros...
Various types of steel and design codes are used in construction materials.
Common types of steel include carbon steel, stainless steel, and alloy steel.
Design codes for construction materials include ACI, AISC, ASCE, and ASTM.
ACI (American Concrete Institute) provides codes for concrete design.
AISC (American Institute of Steel Construction) provides codes for steel design.
ASCE (American Society of Civil Engineers) prov...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.
Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.
The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.
Leaks or deformations during the test indicate weaknesses in the pipes.
The test helps in iden...
I applied via Approached by Company and was interviewed in Feb 2022. There were 4 interview rounds.
based on 5 interviews
Interview experience
based on 25 reviews
Rating in categories
Site Engineer
100
salaries
| ₹2 L/yr - ₹6 L/yr |
Civil Site Engineer
82
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
78
salaries
| ₹4.1 L/yr - ₹8.4 L/yr |
Junior Engineer
39
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Junior Engineer Civil
36
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
L & W Constructions