B.L. Kashyap & Sons General Manager Project Interview Questions and Answers

Updated 3 Aug 2024

B.L. Kashyap & Sons General Manager Project Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Project related questions
Round 2 - HR 

(1 Question)

  • Q1. Discuss related work and Salary finaliza

Interview Preparation Tips

Interview preparation tips for other job seekers - NA
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General about your present and past projects background
Round 3 - Technical 

(1 Question)

  • Q1. There ware discussed general civil Engg based on codes / specifications those we are using at site in day to day working .

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready for daily use P&M in detail rather then codes / specifications based civil engg.

General Manager Project Interview Questions Asked at Other Companies

Q1. What is the bending radius of EHV cables?
Q2. What is the criteria of acceptance of a concrete compressive stre ... read more
Q3. Line of sight communication explanation with pros and cons
Q4. How to handle the contractor if he is not performing
Q5. Detail of family members,Project management s curv.etc.

Interview questions from similar companies

Round 1 - Technical 

(3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
Round 2 - HR 

(2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

B.L. Kashyap & Sons Interview FAQs

How many rounds are there in B.L. Kashyap & Sons General Manager Project interview?
B.L. Kashyap & Sons interview process usually has 2-3 rounds. The most common rounds in the B.L. Kashyap & Sons interview process are HR, Technical and Resume Shortlist.
How to prepare for B.L. Kashyap & Sons General Manager Project interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at B.L. Kashyap & Sons. The most common topics and skills that interviewers at B.L. Kashyap & Sons expect are Budgeting, General Management, Project Execution, Project Management and Client Management.
What are the top questions asked in B.L. Kashyap & Sons General Manager Project interview?

Some of the top questions asked at the B.L. Kashyap & Sons General Manager Project interview -

  1. There ware discussed general civil Engg based on codes / specifications those w...read more
  2. Project related questi...read more

Tell us how to improve this page.

B.L. Kashyap & Sons General Manager Project Interview Process

based on 5 interviews

Interview experience

4.8
  
Excellent
View more
B.L. Kashyap & Sons General Manager Project Salary
based on 4 salaries
₹28 L/yr - ₹59 L/yr
15% more than the average General Manager Project Salary in India
View more details

B.L. Kashyap & Sons General Manager Project Reviews and Ratings

based on 3 reviews

2.3/5

Rating in categories

2.3

Skill development

2.3

Work-life balance

1.7

Salary

2.3

Job security

2.3

Company culture

2.3

Promotions

2.3

Work satisfaction

Explore 3 Reviews and Ratings
Site Engineer
100 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
82 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
40 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare B.L. Kashyap & Sons with

Ahluwalia Contracts India

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview