Q. How can the environment be maintained in terms of housekeeping, debris management, and logistics at a project site to adhere to the Green Building concept?
Effective housekeeping and debris management are crucial for sustainable project sites adhering to Green Building principles.
Implement a waste segregation system to separate recyclables, compostables, and landfill waste.
Use eco-friendly materials and products to minimize environmental impact, such as low-VOC paints and sustainable timber.
Establish a regular cleaning schedule to maintain site cleanliness and prevent debris accumulation.
Incorporate green landscaping practices, ...read more

Asked in Vindhya Telelinks

Q. What is the bending radius of EHV cables?
The bending radius of EHV cables varies depending on the specific cable type and manufacturer.
The bending radius is typically specified by the cable manufacturer.
EHV cables generally have larger bending radii compared to lower voltage cables.
The bending radius is important to ensure proper installation and prevent damage to the cable.
EHV cables may have bending radii ranging from a few times the cable diameter to several meters.
Consult the cable manufacturer's specifications ...read more
General Manager Project Interview Questions and Answers for Freshers

Asked in Egis India Consulting Engineers

Q. What are the acceptance criteria for concrete compressive strength?
Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.
Specified strength should be determined by the project requirements or standards.
Testing frequency should be established to ensure consistent quality control.
Acceptance criteria may include minimum strength requirements and statistical analysis.
Example: Specified strength of 28 MPa, testing every 50 cubic meters, acceptance criteria of 95% passing rate.

Asked in Indian Oil Corporation

Q. Explain line of sight communication, including its pros and cons.
Line of sight communication involves direct visual contact between sender and receiver.
Pros: Secure communication as it is difficult to intercept, immediate feedback, no need for additional equipment
Cons: Limited range, susceptible to interference from obstacles, requires clear line of sight
Example: Using hand signals to communicate with someone across a crowded room

Asked in Capacit'e Infraprojects

Q. What measures can be implemented to control the wastage of various materials at a project site?
Implementing effective measures can significantly reduce material wastage at project sites, enhancing efficiency and sustainability.
Conduct regular training sessions for workers on waste management practices.
Implement a just-in-time inventory system to minimize excess materials.
Use technology like RFID tracking to monitor material usage and reduce losses.
Establish a recycling program for materials like metal, wood, and concrete.
Perform thorough project planning and estimation...read more

Asked in Egis India Consulting Engineers

Q. How do you handle a contractor who is not performing?
Address the issue directly with the contractor and set clear expectations for improvement.
Schedule a meeting with the contractor to discuss performance concerns
Clearly communicate the areas where the contractor is not meeting expectations
Set specific goals and deadlines for improvement
Offer support or resources to help the contractor improve
Consider consequences if performance does not improve, such as termination of contract
General Manager Project Jobs



Asked in Arora Construction

Q. What procedures are applicable to structural work that is nearing completion?
To expedite structural work, implement efficient planning, resource allocation, and quality control measures.
Conduct a thorough project assessment to identify critical tasks and dependencies.
Utilize project management software for real-time tracking and communication.
Implement lean construction techniques to minimize waste and optimize workflow.
Ensure adequate resource allocation, including labor, materials, and equipment.
Regularly review progress and adjust schedules to addr...read more

Asked in Vindhya Telelinks

Q. Detail of family members,Project management s curv.etc.
I'm sorry, but the question is unclear and irrelevant to project management.
The question is not related to project management or any relevant topic.
Detail of family members is not relevant to project management.
Project management S-curve is a tool used to track project progress and is not related to family members.
It is important to ask relevant questions in an interview to assess the candidate's knowledge and skills in project management.
Share interview questions and help millions of jobseekers 🌟

Asked in Vindhya Telelinks

Q. Various IS standards for EHV installation.
IS standards for EHV installation.
IS 2026
IS 2099
IS 2629
IS 3637
IS 375
IS 4722

Asked in Realtyacres Real Estate

Q. What are your career plans for the next 10 years?
My future plan after 10 years is to have expanded the company's reach globally and to have implemented innovative technologies.
Expand company's reach globally
Implement innovative technologies
Increase revenue and profitability
Develop and mentor future leaders
Maintain strong relationships with clients and stakeholders

Asked in Vindhya Telelinks

Q. What is an S-curve in project management?
S curve is a graphical representation of project progress over time.
S curve shows the planned progress, actual progress, and forecasted progress of a project.
It helps in tracking the project's performance and identifying any deviations from the plan.
The curve is named after its S-shape, which is formed due to the slow start, rapid progress, and slow finish of a project.
S curve is commonly used in construction, engineering, and manufacturing industries.
Example: If a project is...read more

Asked in Indian Oil Corporation

Q. Why IOCL for your carrier
IOCL offers a diverse range of projects and opportunities for career growth and development.
IOCL is a reputable company with a strong presence in the oil and gas industry
IOCL provides opportunities for professional growth and development through various projects and initiatives
IOCL offers a diverse range of projects in different sectors such as refining, marketing, and pipeline transportation
IOCL has a strong focus on innovation and sustainability in its projects

Asked in Egis India Consulting Engineers

Q. What do you mean by EPC contractor?
EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.
EPC stands for Engineering, Procurement, and Construction
EPC contractors are responsible for designing, procuring materials, and constructing projects
They are often hired for large-scale projects such as power plants, refineries, and infrastructure projects
Asked in Chhattisgarh Hydro Power llp

Q. What are the hydraulic losses in a tunnel?
Hydraulic losses in tunnels are caused by friction between the flowing water and the tunnel walls, as well as changes in cross-sectional area and flow velocity.
Frictional losses occur due to the roughness of the tunnel walls, which causes resistance to the flow of water.
Changes in cross-sectional area can lead to losses through expansion or contraction of the flow area, causing energy dissipation.
Changes in flow velocity can also result in losses, as sudden changes in speed c...read more
Asked in Chhattisgarh Hydro Power llp

Q. Why are linings required in tunnels?
Linings are required in tulle to provide structure, support, and coverage to the garment.
Linings help to prevent the tulle fabric from being see-through.
They add structure and shape to the garment, especially in full skirts or dresses.
Linings can also provide additional comfort by reducing itchiness or scratchiness from the tulle fabric rubbing against the skin.

Asked in J. Kumar Infraprojects

Q. What do you find good about this organization?
This organization excels in innovation, teamwork, and a strong commitment to quality, fostering a positive work environment.
Strong emphasis on collaboration, leading to successful project outcomes, as seen in the recent cross-departmental initiative.
Commitment to employee development through regular training programs, enhancing skills and career growth opportunities.
A culture of innovation, demonstrated by the introduction of cutting-edge technologies that improve efficiency ...read more

Asked in Accenture

Q. What is project management?
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.
Involves initiating, planning, executing, controlling, and closing a project
Focuses on achieving specific goals and meeting success criteria
Requires effective communication, coordination, and resource management
Utilizes tools and techniques such as Gantt charts, project schedules, and risk management pl...read more

Asked in Vindhya Telelinks

Q. Describe the EHV cable installation procedure.
EHV cable installation involves careful planning, site preparation, and adherence to safety standards for high voltage systems.
Conduct a site survey to assess environmental conditions and accessibility.
Prepare the trench or duct for cable laying, ensuring proper depth and width.
Use appropriate cable handling techniques to avoid damage during installation.
Install cable supports and spacers to maintain proper separation and alignment.
Perform electrical testing before and after ...read more

Asked in Oberoi Group of Hotels

Q. What is rate analysis?
Rate analysis is the process of determining the rates of various items of work to calculate the cost of a project.
Rate analysis involves breaking down the cost of materials, labor, equipment, and overhead for each item of work in a project.
It helps in determining the total cost of a project and ensures accurate budgeting.
Rate analysis is essential for preparing estimates, tender documents, and evaluating project feasibility.
For example, in construction projects, rate analysis...read more
Asked in Nirmal Realty Solutions

Q. How many years of experience do you have, and what is your expected salary package?
I have 10 years of experience in project management and am proficient in using various software packages.
10 years of experience in project management
Proficient in using various software packages

Asked in Plumber Bathware

Q. What is your experience in this field?
I have over 10 years of experience in project management, with a focus on delivering successful outcomes.
Managed multiple projects simultaneously, ensuring timely delivery and within budget
Developed and implemented project plans, including risk management and mitigation strategies
Led cross-functional teams, fostering collaboration and communication
Implemented process improvements resulting in increased efficiency and cost savings
Successfully delivered projects in various indu...read more
Asked in Urbania Realty

Q. Quality of construction
Quality of construction is a crucial aspect in project management.
Quality of construction directly impacts the durability and safety of the project.
It involves using high-quality materials, skilled labor, and adherence to industry standards.
Regular inspections and quality control measures ensure compliance with specifications.
Quality construction reduces maintenance costs and enhances the overall value of the project.
For example, using reinforced concrete instead of regular c...read more

Asked in Teerth Realties

Q. Quantum of Construction
The quantum of construction refers to the amount or volume of construction work that needs to be completed.
The quantum of construction can be measured in terms of the total area to be constructed, the number of units or buildings to be constructed, or the total volume of materials required.
It is important for a General Manager Project to accurately estimate the quantum of construction in order to plan resources, timelines, and budgets effectively.
For example, if a project inv...read more

Asked in J. Kumar Infraprojects

Q. Why do you want to leave your current role?
I'm seeking new challenges and opportunities for growth that align with my career aspirations and personal development goals.
Desire for professional growth: I want to take on larger projects that challenge my skills, like leading a multi-million dollar initiative.
Seeking a better cultural fit: My current organization has a different approach to teamwork, and I thrive in collaborative environments.
Looking for new industry exposure: I'm interested in exploring sectors like rene...read more
Asked in Pavilion Infrastructure

Q. Hi rise buildings experience
I have extensive experience working on high rise building projects, including design, construction, and project management.
Managed the construction of a 50-story office building in downtown Chicago
Collaborated with architects and engineers to ensure structural integrity and safety
Implemented cost-saving measures without compromising quality or safety

Asked in Greenmark Developers

Q. Latest formwork technology
The latest formwork technology includes modular systems, self-climbing formwork, and digital solutions.
Modular formwork systems allow for easy customization and reusability.
Self-climbing formwork reduces labor costs and increases efficiency.
Digital solutions such as Building Information Modeling (BIM) improve accuracy and coordination on site.
Interview Questions of Similar Designations
Interview Experiences of Popular Companies








Reviews
Interviews
Salaries
Users