Q1. How many days will take 1st Aluform mockup Concreting

Ans.

The 1st Aluform mockup concreting typically takes 1-2 days to complete.

  • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

  • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

  • Proper planning and coordination can help expedite the process

Q2. What is CPU , please describe all parts with its function

Ans.

The CPU (Central Processing Unit) is the brain of a computer, responsible for executing instructions and performing calculations.

  • The CPU consists of several parts, including the control unit, arithmetic logic unit (ALU), and registers.

  • The control unit manages the flow of data and instructions within the CPU and coordinates with other hardware components.

  • The ALU performs arithmetic and logical operations, such as addition, subtraction, and comparison.

  • Registers are small, high-...read more

Senior Site Engineer Interview Questions and Answers for Freshers

illustration image

Q3. Which electrode is use welding purpose for corbon steel to alloy steel

Ans.

For welding carbon steel to alloy steel, the electrode commonly used is E7018.

  • E7018 electrode is commonly used for welding carbon steel to alloy steel

  • It is a low-hydrogen electrode that provides strong welds with good impact resistance

  • The electrode operates on DC current and is suitable for both vertical and overhead welding positions

Q4. What is responsibality of civil engineer?

Ans.

The responsibility of a civil engineer is to plan, design, and oversee construction projects.

  • Planning and designing infrastructure projects

  • Ensuring compliance with building codes and regulations

  • Managing construction activities and supervising workers

  • Conducting site inspections and resolving any issues

  • Collaborating with architects, contractors, and other professionals

  • Preparing cost estimates and project schedules

  • Ensuring project quality and safety

  • Monitoring progress and making...read more

Are these interview questions helpful?

Q5. What is the procedure for water proofing?

Ans.

Waterproofing procedure involves surface preparation, application of waterproofing material and quality control measures.

  • Surface preparation involves cleaning and repairing the surface to be waterproofed.

  • Waterproofing material can be applied using various methods such as spraying, brushing or rolling.

  • Quality control measures include checking for leaks and ensuring proper curing of the waterproofing material.

  • Different types of waterproofing materials are available such as bitu...read more

Q6. What according to you is better for high rise Raft foundation or pile foundation

Ans.

It depends on various factors such as soil conditions, budget, timeline, and local regulations.

  • Raft foundation is suitable for uniform soil conditions and high water table areas.

  • Pile foundation is preferred for sites with poor soil conditions or where the load-bearing capacity of the soil is insufficient.

  • Raft foundation is cost-effective for smaller buildings with uniform loads, while pile foundation is more suitable for high-rise buildings with uneven loads.

  • Local regulations...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. What is centre line plan & how do you execute it on field

Ans.

Centre line plan is a layout plan showing the center line of a road or structure, used for construction purposes.

  • Prepare a detailed drawing showing the center line of the road or structure

  • Mark the center line on the ground using surveying equipment

  • Ensure the accuracy of measurements and markings to avoid errors during construction

  • Use the center line plan as a reference for setting out other components of the project

  • Regularly check and adjust the center line markings as constr...read more

Q8. Type of Transformer, size of ab cable , conductor Stringing, Pole Erection , Quality and Safety related Questions Contractor billing & JMS .

Ans.

The interviewer asked about transformer type, cable size, conductor stringing, pole erection, quality and safety, contractor billing, and JMS.

  • Transformer type should be selected based on the load requirement and voltage level.

  • Cable size should be determined based on the current carrying capacity and voltage drop.

  • Conductor stringing should be done as per the design and specifications.

  • Pole erection should be done as per the safety standards and guidelines.

  • Quality and safety sho...read more

Senior Site Engineer Jobs

Senior Site Engineer 7-10 years
360 Realtors
3.9
₹ 6 L/yr - ₹ 10 L/yr
Kudal
Senior Site Engineer / Lead Engineer 6-11 years
Galacon Infrastructure And Projects
3.6
₹ 3 L/yr - ₹ 8 L/yr
Golaghat
Senior Site Engineer 4-8 years
Kumar Metal Industries Pvt Ltd
3.6
Mumbai

Q9. What is the definition of quality construction How define the steel bar binding as structure design What type of concrete you preferred M200 or M250

Ans.

Quality construction is the process of building structures that meet or exceed the specified standards and requirements.

  • Quality construction involves using high-quality materials, skilled labor, and proper techniques to ensure durability and safety.

  • Steel bar binding in structure design refers to the process of securing steel bars together using wire to form a strong and stable framework.

  • Concrete with higher strength like M250 is preferred for structural elements like columns ...read more

Q10. What is the future in civil engineer ?

Ans.

The future in civil engineering is promising with advancements in technology, sustainable practices, and infrastructure development.

  • Advancements in technology will revolutionize the field, with the use of Building Information Modeling (BIM), drones, and automation.

  • Sustainable practices will play a crucial role, with a focus on green building, renewable energy, and efficient resource management.

  • Infrastructure development will continue to be a priority, with the need for improv...read more

Q11. Which type of brick work is better in high rise building?

Ans.

In high rise buildings, reinforced brick masonry is better due to its strength and durability.

  • Reinforced brick masonry is preferred for high rise buildings as it provides better structural stability.

  • It involves embedding steel reinforcement bars within the brickwork to enhance strength and load-bearing capacity.

  • This type of brickwork can withstand higher vertical and lateral loads, making it suitable for tall structures.

  • Examples of high rise buildings using reinforced brick m...read more

Q12. Where use cpvc and upvc pipe in building construction

Ans.

CPVC and UPVC pipes are commonly used in building construction for water supply and drainage systems.

  • CPVC pipes are used for hot and cold water supply due to their high temperature resistance.

  • UPVC pipes are used for drainage systems due to their chemical resistance and durability.

  • Both CPVC and UPVC pipes are lightweight, easy to install, and have low maintenance requirements.

  • Examples: CPVC pipes are used for supplying hot water to bathrooms and kitchens, while UPVC pipes are ...read more

Q13. Do you have a bike.. good would be required engineers to deliver flowers..

Ans.

Yes, I do have a bike and I am comfortable with delivering flowers if required.

  • I have a reliable bike that I use for commuting.

  • I am comfortable with navigating through traffic and delivering items on time.

  • I have experience delivering packages and documents on my bike.

  • I am willing to take on additional responsibilities as required.

Q14. What can we do the part time work in machinery valuation?

Ans.

Part time work in machinery valuation can be done by gaining knowledge of machinery, conducting inspections, and providing accurate valuations.

  • Gain knowledge of machinery and its market value

  • Conduct inspections and assess the condition of the machinery

  • Provide accurate valuations based on the market value and condition of the machinery

  • Keep up-to-date with industry trends and changes in market value

  • Network with potential clients and market your services

Q15. How to check the shuttering components in a order of sequence?

Ans.

Check shuttering components in a specific order

  • Start by checking the base plates to ensure they are properly positioned and secured

  • Next, inspect the vertical props to make sure they are plumb and properly braced

  • Then check the horizontal walers and ledger beams for proper alignment and support

  • Finally, examine the plywood sheets or formwork panels to ensure they are securely attached and in good condition

Q16. What is the object we use to perform as a reference to achieve cover for the reinforcement?

Ans.

The object used as a reference to achieve cover for reinforcement is a spacer.

  • Spacers are used to maintain the specified distance between the reinforcement bars and the formwork.

  • They help in ensuring that the reinforcement is properly covered by concrete to provide adequate protection against corrosion.

  • Common types of spacers include plastic spacers, wheel spacers, and bar spacers.

Q17. What are grades of steel used in construction and what are diameters available in construction.

Ans.

Different grades of steel used in construction include mild steel, high tensile steel, and stainless steel. Common diameters available range from 6mm to 50mm.

  • Grades of steel used in construction: mild steel, high tensile steel, stainless steel

  • Common diameters available in construction: 6mm, 8mm, 10mm, 12mm, 16mm, 20mm, 25mm, 32mm, 40mm, 50mm

  • Example: Mild steel (grade 250) is commonly used for general construction purposes due to its affordability and versatility

  • Example: High ...read more

Q18. 1) Column verticality tolerance limits 2) Types of roof sheet. 3) Permissible paint coating on Hot rolled sections. 4) Building erection procedure

Ans.

Questions related to Senior Site Engineer job role

  • Column verticality tolerance limits should be within +/- 5mm per 3m height

  • Types of roof sheet include metal, asphalt, and polycarbonate sheets

  • Permissible paint coating on Hot rolled sections should be as per the manufacturer's recommendation

  • Building erection procedure involves site preparation, foundation work, structural assembly, and finishing work

Q19. What are types of vitrified tile?

Ans.

Vitrified tiles are of two types - soluble salt and double charge.

  • Soluble salt vitrified tiles have a pattern that is printed on the surface of the tile and then coated with a layer of liquid glass.

  • Double charge vitrified tiles have two layers of pigment that are baked together to create a pattern that goes all the way through the tile.

  • Other types of vitrified tiles include glazed vitrified tiles, full-body vitrified tiles, and digital vitrified tiles.

Q20. Compressive strength of concrete after 14 & 28 days and also persentage of strength.

Ans.

Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.

  • Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).

  • After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.

  • After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.

  • The percentage of strength gained from 14 to 28 days can vary depending on th...read more

Q21. What is Router,Hub, Switch,Lane ,Basic command

Ans.

A router is a networking device that forwards data packets between computer networks. A hub is a device that connects multiple Ethernet devices together. A switch is a networking device that connects devices on a computer network. A lane refers to a physical or logical channel for data transmission. Basic commands include configuring network settings, troubleshooting connectivity issues, and managing network devices.

  • Router: Forwards data packets between networks

  • Hub: Connects ...read more

Q22. How many cement bags in one cubic metre

Ans.

The number of cement bags in one cubic metre depends on the density of the cement.

  • The density of cement varies between 1,200 to 1,800 kg/m³

  • The weight of one cement bag is usually 50 kg

  • Therefore, the number of cement bags in one cubic metre ranges from 55 to 83 bags

Q23. What is the reason of honeycomb in concrete?

Ans.

Honeycomb in concrete is caused by incomplete filling of the formwork resulting in voids or air pockets in the concrete.

  • Honeycomb can weaken the structure and reduce its durability.

  • It can be caused by improper vibration during pouring or inadequate compaction.

  • Honeycomb can be prevented by using proper formwork and ensuring complete filling of the formwork.

  • If honeycomb is detected, it can be repaired by chipping away the affected area and filling it with fresh concrete.

  • Honeyco...read more

Q24. Weight of reinforcement in slab with the help of drawing

Ans.

The weight of reinforcement in a slab can be determined from the provided drawing.

  • Calculate the area of the slab

  • Determine the spacing and diameter of the reinforcement bars

  • Calculate the weight of a single bar using the formula: weight = (d^2/162) * L, where d is the diameter and L is the length of the bar

  • Multiply the weight of a single bar by the total number of bars in the slab

  • Add the weight of all the bars to get the total weight of reinforcement in the slab

Q25. How many reputation of the slab to slab

Ans.

I'm sorry, but I don't understand the question. Could you please provide more context?

  • Please provide more information about what you mean by 'reputation of the slab to slab.'

  • Are you asking about the structural integrity of the slab-to-slab connection?

  • Without more information, I cannot provide a meaningful answer.

Q26. How to find circular column concrete quantity.

Ans.

Circular column concrete quantity can be found using the formula: Volume = πr^2h

  • Calculate the area of the circular column using the formula A = πr^2

  • Measure the height of the column

  • Multiply the area by the height to get the volume of concrete needed

  • Consider any additional factors such as wastage or reinforcement bars

Q27. How making a BBS of Footing or column steel

Ans.

Creating a Bill of Quantities (BBS) for footing or column steel involves calculating the quantities of steel bars required based on the design drawings and specifications.

  • Review the structural drawings and specifications to understand the design requirements

  • Calculate the total length of steel bars required for each size and type of bar

  • Determine the number of bars needed for each footing or column

  • Prepare a detailed list of quantities, sizes, and types of steel bars for the BBS...read more

Q28. Type of beam Plaster process Tile quality check Steel quality and quantity estimate

Ans.

The type of beam used, plaster process, tile quality check, and steel quality and quantity estimation are important aspects of a Senior Site Engineer's job.

  • Different types of beams include I-beams, H-beams, and T-beams.

  • Plaster process involves applying a coat of plaster to walls or ceilings for finishing.

  • Tile quality check includes checking for cracks, chips, and proper alignment.

  • Steel quality estimation involves checking for grade, strength, and corrosion resistance.

  • Quantity...read more

Q29. What are grade of steel available in market

Ans.

Grade of steel available in the market include mild steel, stainless steel, high carbon steel, and alloy steel.

  • Mild steel is commonly used for construction due to its low cost and high strength.

  • Stainless steel is corrosion resistant and often used in food processing and medical equipment.

  • High carbon steel is known for its hardness and is used in cutting tools and knives.

  • Alloy steel is a combination of different metals to enhance properties like strength and durability.

Q30. Wht kind of way you make company as a more profits

Ans.

By optimizing project timelines, reducing costs, and increasing efficiency.

  • Optimizing project timelines to reduce overall project duration

  • Reducing costs by identifying cost-saving opportunities in procurement and construction

  • Increasing efficiency by implementing lean construction practices

  • Improving quality control to reduce rework and increase client satisfaction

  • Developing and maintaining strong relationships with clients to secure repeat business

  • Identifying and pursuing new ...read more

Q31. Difference between mivan and conventional

Ans.

Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

  • Mivan is faster and more efficient than conventional construction methods.

  • Mivan requires skilled labor for installation of aluminum formwork.

  • Conventional construction is more labor-intensive and time-consuming.

  • Mivan provides better quality finishes compared to conventional methods.

  • Cost of construction using Mivan is higher initia...read more

Q32. How to maintain the quality?

Ans.

Maintaining quality requires a systematic approach and attention to detail.

  • Establish clear quality standards and communicate them to the team

  • Regularly inspect and test materials, equipment, and workmanship

  • Implement quality control measures and corrective actions

  • Provide training and guidance to ensure understanding and adherence to quality standards

  • Monitor and evaluate performance to identify areas for improvement

  • Collaborate with suppliers and subcontractors to maintain qualit...read more

Q33. What is using this toilet room in waterproofing

Ans.

Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.

  • Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.

  • Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.

  • Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.

  • Examples of waterproofing methods include tanking, waterproof memb...read more

Q34. How to calculate gypsum plaster quantity per sqft

Ans.

Gypsum plaster quantity per sqft can be calculated by determining the thickness of the plaster and the coverage area.

  • Calculate the total area to be plastered in square feet

  • Determine the thickness of the gypsum plaster in inches

  • Use the formula: Quantity = (Total area x Thickness) / 12

  • Convert the quantity to bags based on the packaging size of gypsum plaster

Q35. Reason of De-grading of module and how it's avoid?

Ans.

Module de-grading can occur due to various reasons such as poor maintenance, environmental factors, or outdated technology.

  • Regular maintenance and inspections can help identify issues before they lead to de-grading.

  • Using high-quality materials and components can prevent premature de-grading.

  • Updating technology and equipment to keep up with industry standards can avoid de-grading.

  • Implementing proper training for staff to ensure correct usage and maintenance of modules.

Q36. Density of steel, cement, concrete, sand, aggregates.

Ans.

Density of common construction materials

  • Steel: 7850 kg/m^3

  • Cement: 1440 kg/m^3

  • Concrete: 2400 kg/m^3

  • Sand: 1600-1700 kg/m^3

  • Aggregates: 1500-1750 kg/m^3

Q37. What is the plans for civil engineer

Ans.

Civil engineers plan, design, and oversee construction and maintenance of infrastructure.

  • Civil engineers plan and design infrastructure projects such as roads, bridges, and buildings

  • They oversee the construction and maintenance of these projects

  • They use computer-aided design (CAD) software to create plans and blueprints

  • They ensure that projects comply with regulations and safety standards

  • They work with other professionals such as architects and construction managers

Q38. What is bar bending schedule

Ans.

Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

  • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

  • Helps in estimating the quantity of steel required for construction.

  • Ensures proper placement and bending of reinforcement bars as per design specifications.

  • Used by contractors, engineers, and construction workers for reference during construction.

  • Example: Bar bending schedule ...read more

Q39. What is self leveling concrete

Ans.

Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

  • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

  • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

  • Self leveling concrete can be applied in thicknesses ranging from a featheredge to several inches, depending on the specific product and...read more

Q40. How do you fix honeycomb in concrete?

Ans.

Honeycomb in concrete can be fixed by chipping away the damaged area, cleaning it thoroughly, and then filling it with fresh concrete.

  • Chip away the damaged area using a chisel or hammer drill

  • Clean the area thoroughly to remove any loose debris or dust

  • Apply a bonding agent to the area to help the new concrete adhere to the old

  • Mix fresh concrete and fill the area, making sure to compact it well

  • Smooth the surface of the new concrete and allow it to cure properly

Q41. What are test conducted on steel......????

Ans.

Various tests conducted on steel include tensile test, hardness test, impact test, bend test, and microstructure analysis.

  • Tensile test measures the strength of steel by applying a pulling force until it breaks.

  • Hardness test determines the resistance of steel to deformation.

  • Impact test assesses the toughness of steel by subjecting it to sudden loading.

  • Bend test evaluates the ductility of steel by bending it to a specific angle without fracture.

  • Microstructure analysis examines ...read more

Q42. Where do start erection at first

Ans.

The erection process typically starts at the foundation level.

  • Start by setting out the reference points for the foundation

  • Excavate the foundation trenches and pour concrete footings

  • Proceed with building up the structural elements from the foundation upwards

  • Ensure proper alignment and leveling at each stage of erection

Q43. How to find triangle concrete quantity.

Ans.

Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.

  • Calculate the area of the triangle using the formula: 1/2 * base * height.

  • Multiply the area by the thickness to get the concrete quantity.

  • For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.

Q44. Water absorption percentage of 1st class brick

Ans.

Water absorption of 1st class brick is around 20%

  • Water absorption is the amount of water absorbed by a brick when it is immersed in water for a specified period of time

  • 1st class bricks have a water absorption percentage of around 20%

  • Water absorption affects the strength and durability of the brick

Q45. What is OSI LAYER,TCP/IP,DNS,IP

Ans.

OSI LAYER, TCP/IP, DNS, and IP are all fundamental concepts in computer networking.

  • OSI LAYER is a conceptual model that describes how data is transmitted over a network.

  • TCP/IP is a set of protocols that govern how data is transmitted over the internet.

  • DNS is a system that translates domain names into IP addresses.

  • IP is a protocol that governs how data is transmitted over a network.

Q46. How much 1meter lenth how much kg

Ans.

The weight of 1 meter length depends on the material being measured.

  • The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.

  • To calculate the weight, you need to know the density of the material.

  • For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.

Q47. What is the grade concrete use by slab

Ans.

The grade of concrete used by a slab depends on the load it needs to bear.

  • The grade of concrete used for a slab is typically between M20 to M50.

  • The higher the grade of concrete, the stronger it is and the more load it can bear.

  • The grade of concrete used also depends on the thickness of the slab and the type of reinforcement used.

  • For example, a residential slab may use M20 grade concrete while a commercial or industrial slab may use M30 or higher grade concrete.

Q48. Different between accounts and accountability

Ans.

Accounts are financial records, while accountability is the responsibility to justify actions and decisions.

  • Accounts refer to financial records of transactions, while accountability refers to the obligation to explain and justify actions.

  • Accounts are used to track financial activities and performance, while accountability ensures transparency and integrity in decision-making.

  • Examples: Keeping accurate accounts of project expenses vs being accountable for project delays or err...read more

Q49. Minimum dia of steel used in column

Ans.

The minimum diameter of steel used in a column depends on the load it needs to bear and the height of the column.

  • The minimum diameter of steel used in a column is typically 12mm.

  • However, it can vary depending on the load it needs to bear and the height of the column.

  • For taller columns, larger diameter steel bars may be required to ensure structural stability.

  • The diameter of steel used in a column should be specified in the design drawings and approved by a structural engineer...read more

Q50. Which concrete ratio is good ?

Ans.

The concrete ratio depends on the specific requirements of the project, such as strength, durability, and workability.

  • The most common concrete ratio is 1:2:4, which consists of 1 part cement, 2 parts sand, and 4 parts gravel.

  • For high-strength concrete, a ratio of 1:1.5:3 with additives like silica fume or fly ash may be used.

  • For projects requiring increased workability, a ratio of 1:2:3 with a higher water-cement ratio can be chosen.

  • It is important to consult with structural ...read more

1
2
3
Next
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.3
 • 487 Interviews
4.2
 • 229 Interviews
4.0
 • 156 Interviews
3.9
 • 121 Interviews
4.0
 • 118 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Senior Site Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter