Upload Button Icon Add office photos

Filter interviews by

L & W Constructions Interview Questions, Process, and Tips

Updated 17 Oct 2024

Top L & W Constructions Interview Questions and Answers

View all 14 questions

L & W Constructions Interview Experiences

Popular Designations

24 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Role related questions
  • Q2. Duties of Admin in work place
Round 2 - One-on-one 

(1 Question)

  • Q1. Role related questions

Senior HR Executive and Administrator Interview Questions asked at other Companies

Q1. What HR Software tools are you familiar with?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Site planning , binding work ,
  • Q2. Drawing work auto CAD
  • Q3. Billing engineer, work s
  • Q4. Salary Client al

Interview Preparation Tips

Topics to prepare for L & W Constructions Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site engineer

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Good process from management side

Interview Preparation Tips

Interview preparation tips for other job seekers - Java coding, C# coding, Unity

Software Developer Interview Questions asked at other Companies

Q1. Maximum Subarray SumGiven an array of numbers, find the maximum sum of any contiguous subarray of the array. For example, given the array [34, -50, 42, 14, -5, 86], the maximum sum would be 137, since we would take elements 42, 14, -5, and ... read more
View answer (39)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical RCC and Finishing

Interview Preparation Tips

Interview preparation tips for other job seekers - Good for Commercial

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)

L & W Constructions interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (2)

 Senior Engineer Mechanical

 (2)

 Architectural Coordinator

 (1)

 Architectural Draughtsman

 (1)

 Assistant Engineer - Civil

 (1)

 Civil Engineer

 (1)

 Civil Site Engineer

 (1)

 Engineer

 (1)

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Handling of Planning Software & MS office
  • Q2. Basic Field knowledge
  • Q3. Planning and scheduling and quantity take offs
Round 3 - HR 

(1 Question)

  • Q1. Previous company exposure
  • Ans. 

    I have previous company exposure in project management and engineering roles.

    • Worked as a Project Engineer at XYZ Company for 3 years

    • Managed multiple projects simultaneously, ensuring timely completion and within budget

    • Collaborated with cross-functional teams to identify project requirements and deliverables

    • Implemented project management methodologies and tools to streamline processes

    • Led a team of engineers to successfu...

  • Answered by AI

Get interview-ready with Top L & W Constructions Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Details of coordination and technical competency
  • Q2. Procedure involved in design coordination, documentation, value engineering etc
  • Ans. 

    Design coordination involves documentation, value engineering, and collaboration with various stakeholders.

    • Identify project stakeholders and their roles

    • Establish communication channels and protocols

    • Review design documents and identify potential conflicts

    • Collaborate with architects, engineers, contractors, and other stakeholders to resolve conflicts

    • Conduct value engineering to optimize design and reduce costs

    • Document al...

  • Answered by AI

Architectural Coordinator Interview Questions asked at other Companies

Q1. Procedure involved in design coordination, documentation, value engineering etc
View answer (1)

Jobs at L & W Constructions

View all

Concert Foreman Interview Questions & Answers

user image Anonymous

posted on 20 May 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before May 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Concert gread RIQAID
  • Q2. Concert quality
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Archi related and structurer coordinate
  • Q2. MEP coordinate with archi
  • Ans. 

    MEP (Mechanical, Electrical, and Plumbing) coordination is essential for architectural projects.

    • MEP systems need to be integrated with architectural designs to ensure functionality and efficiency.

    • Architects and MEP engineers collaborate to coordinate the placement of MEP elements within the building design.

    • MEP coordination involves considering factors like space requirements, structural limitations, and aesthetic consi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Architectural Draughtsman Interview Questions asked at other Companies

Q1. Do you know work on layers and different scales in AutoCAD?
View answer (6)

Store Incharge Interview Questions & Answers

user image Bappa Mondal

posted on 27 Oct 2022

I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Nothing like a professional question, What is your job role in previous co, what is the work timing, etc
  • Q2. What is bulk material
  • Ans. 

    Bulk material refers to large quantities of a substance that is typically stored, transported, and handled in loose form.

    • Bulk material is often measured by weight or volume.

    • Examples of bulk materials include grains, coal, sand, gravel, and liquids like oil and gas.

    • Bulk materials are typically stored in silos, tanks, or containers designed for easy handling and transportation.

    • Handling bulk materials requires specialized...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm work hare 5 years, thare is no job security if you are not belongs south indian.

Store Incharge Interview Questions asked at other Companies

Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
View answer (4)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. How much hike you asking
  • Q2. What will be your contribution to company
  • Q3. Why should i paying you
Round 2 - HR 

(1 Question)

  • Q1. Why company paying you

Interview Preparation Tips

Interview preparation tips for other job seekers - be positive

Senior Site Engineer Interview Questions asked at other Companies

Q1. How many days will take 1st Aluform mockup Concreting
View answer (1)

L & W Constructions Interview FAQs

How many rounds are there in L & W Constructions interview?
L & W Constructions interview process usually has 1-2 rounds. The most common rounds in the L & W Constructions interview process are Resume Shortlist, Technical and One-on-one Round.
How to prepare for L & W Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L & W Constructions. The most common topics and skills that interviewers at L & W Constructions expect are Construction, Architecture, Procurement, Inspection and Management.
What are the top questions asked in L & W Constructions interview?

Some of the top questions asked at the L & W Constructions interview -

  1. Why maintenance of machineries so importa...read more
  2. What is full form ...read more
  3. Can you withstand the pressure in the sit...read more
How long is the L & W Constructions interview process?

The duration of L & W Constructions interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

L & W Constructions Interview Process

based on 6 interviews in last 1 year

Interview experience

4.8
  
Excellent
View more

People are getting interviews through

based on 15 L & W Constructions interviews
Job Portal
WalkIn
Referral
Campus Placement
Recruitment Consultant
33%
20%
13%
7%
7%
20% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 399 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

L & W Constructions Reviews and Ratings

based on 446 reviews

3.6/5

Rating in categories

3.7

Skill development

3.4

Work-Life balance

3.8

Salary & Benefits

3.5

Job Security

3.4

Company culture

3.2

Promotions/Appraisal

3.4

Work Satisfaction

Explore 446 Reviews and Ratings
Assistant Manager

Mumbai

5-9 Yrs

Not Disclosed

Explore more jobs
Site Engineer
131 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Senior Engineer
88 salaries
unlock blur

₹3.8 L/yr - ₹9 L/yr

QA QC Engineer
55 salaries
unlock blur

₹2.1 L/yr - ₹6.7 L/yr

Civil Site Engineer
52 salaries
unlock blur

₹2.7 L/yr - ₹5.6 L/yr

MEP Engineer
48 salaries
unlock blur

₹1.4 L/yr - ₹7.2 L/yr

Explore more salaries
Compare L & W Constructions with

Tata Projects

4.3
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview