Upload Button Icon Add office photos

Filter interviews by

L & W Constructions Site Engineer Interview Questions and Answers

Updated 16 Jan 2023

L & W Constructions Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Jan 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions such as experience, last salary, etc
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Interview usually by manager or higher management. Questions about previous job experience and how well you know your field

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company for freshers. Can build and boost your career in 3 years.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Asking to me...... Only civil engineering questions
  • Q2. Only waste water treatment plants related questions
  • Q3. What is hydro power test of DI pipes...?
  • Ans. 

    Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.

    • Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.

    • The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.

    • Leaks or deformations during the test indicate weaknesses in the pipes.

    • The test helps in iden...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Only waste water treatment plants related questions
  • Q2. RCC spun related question
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Slump cone top diameter ?
  • Ans. 

    The top diameter of a slump cone is typically 4 inches.

    • The top diameter of a slump cone is usually 4 inches.

    • The slump cone is used to measure the consistency of fresh concrete.

    • The top diameter of the slump cone affects the flow of the concrete mix.

    • A larger top diameter will result in a higher slump value.

  • Answered by AI
  • Q2. Full from of TMT ?
  • Ans. 

    Thermo-Mechanically Treated

    • TMT stands for Thermo-Mechanically Treated

    • TMT bars are commonly used in construction for reinforcement

    • The process involves heating the steel bars and then rapidly cooling them to increase their strength

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I was interviewed in Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. As per site conditions. Shaul the technical eshu..
  • Q2. All technical issue Solve.
Round 2 - Technical 

(1 Question)

  • Q1. As per site technical essu.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Previous experience and which projects have been worked.
Round 3 - HR 

(1 Question)

  • Q1. How many years worked in one company.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be smart to ask what you want at the interview stage.

Interview Questionnaire 

1 Question

  • Q1. About myself, working ability, knowledge about work

Interview Preparation Tips

Interview preparation tips for other job seekers - Friendly to say truth
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the hydrotest pressure? Ans:- 1.5 times of design pressure.
  • Ans. 

    The hydrotest pressure is 1.5 times the design pressure.

    • Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.

    • It is usually done before commissioning the system.

    • For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.

  • Answered by AI
  • Q2. Q:- What is the procedure for fit up inspection? Ans:- Base metal Classification, cleaning, Alignment, Root gap, root face, Bevel angle & mismatch or overlap.
  • Ans. 

    The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.

    • Classify the base metal

    • Clean the surface

    • Align the parts to be joined

    • Check the root gap and root face

    • Measure the bevel angle

    • Check for any mismatch or overlap

    • Ensure all specifications are met

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You was achieved goal in oil and gas sector and pipe line construction project of CGD.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION

Round 2 - Technical 

(2 Questions)

  • Q1. Work process, work ability, and all releted civil function.
  • Q2. System of solar
  • Ans. 

    Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.

    • The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.

    • The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.

    • The Sun is the central star of our solar system, p...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Regarding what is the stage in Erection procedure or process
Technical related questions like troque tightening values of bolts and other work procedure and what are the documents to be maintained for Erection works and for also for billing

Round 2 - One-on-one 

(2 Questions)

  • Q1. Questions asked related work experience and personal details and hobbies
  • Q2. What is your Hobbies
Round 3 - Technical 

(1 Question)

  • Q1. Where do start erection at first
  • Ans. 

    The erection process typically starts at the foundation level.

    • Start by setting out the reference points for the foundation

    • Excavate the foundation trenches and pour concrete footings

    • Proceed with building up the structural elements from the foundation upwards

    • Ensure proper alignment and leveling at each stage of erection

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job related knowledge is main
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About the CGD ?
Round 3 - One-on-one 

(1 Question)

  • Q1. About work experience ?
Round 4 - HR 

(1 Question)

  • Q1. They asked me about Salary ?

L & W Constructions Interview FAQs

How many rounds are there in L & W Constructions Site Engineer interview?
L & W Constructions interview process usually has 3 rounds. The most common rounds in the L & W Constructions interview process are HR, One-on-one Round and Resume Shortlist.
How to prepare for L & W Constructions Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L & W Constructions. The most common topics and skills that interviewers at L & W Constructions expect are Civil Engineering, Client Satisfaction, Inspection, Monitoring and Process Compliance.

Tell us how to improve this page.

L & W Constructions Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
L & W Constructions Site Engineer Salary
based on 120 salaries
₹2.4 L/yr - ₹6 L/yr
9% more than the average Site Engineer Salary in India
View more details

L & W Constructions Site Engineer Reviews and Ratings

based on 34 reviews

3.3/5

Rating in categories

3.3

Skill development

3.0

Work-life balance

3.8

Salary

3.4

Job security

3.1

Company culture

2.9

Promotions

3.1

Work satisfaction

Explore 34 Reviews and Ratings
Site Engineer
120 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Senior Engineer
88 salaries
unlock blur

₹3.8 L/yr - ₹9 L/yr

QA QC Engineer
53 salaries
unlock blur

₹1.8 L/yr - ₹6.6 L/yr

Civil Site Engineer
52 salaries
unlock blur

₹2.7 L/yr - ₹5.6 L/yr

MEP Engineer
49 salaries
unlock blur

₹1.4 L/yr - ₹7 L/yr

Explore more salaries
Compare L & W Constructions with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview