Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Walk-in
About your job, location, CTC
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 27 Nov 2023
The process of a Water Treatment Plant (WTP) involves several stages to purify water for safe consumption.
Coagulation and Flocculation: Chemicals are added to water to remove suspended particles.
Sedimentation: The water is allowed to settle, and the solids are removed.
Filtration: Water passes through various filters to remove smaller particles.
Disinfection: Chlorine or other disinfectants are added to kill harmful micr...
The capacity of a Water Treatment Plant (WTP) is measured in million gallons per day (mgd).
WTP capacity is the maximum amount of water that can be treated and supplied per day.
It is an important factor in determining the water supply capability of a WTP.
Capacity can vary depending on the size and design of the plant.
For example, a WTP may have a capacity of 10 mgd, meaning it can treat and supply up to 10 million gallo
I am available to join immediately.
I can start working as soon as possible.
I am flexible with the joining date.
I am ready to begin work immediately.
I can join within a week of receiving the offer.
I am excited to start working on the specified joining date.
My notice period is 30 days.
My notice period is 30 days.
I am required to give a 30-day notice before leaving my current position.
I have already informed my current employer about my intention to leave and they are aware of my notice period.
posted on 11 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Anchorage of reinforcing bars refers to the method of securing the bars in concrete to ensure proper transfer of forces.
Anchorage length is the portion of the reinforcing bar embedded in concrete to transfer forces effectively.
Proper anchorage is crucial for the structural integrity of the concrete element.
Anchorage can be achieved through hooks, bends, or mechanical anchorage devices.
Development length is the minimum ...
The minimum development length in a column is the length required for the full transfer of stress from the steel reinforcement to the concrete.
The minimum development length is typically specified by design codes or standards.
It is influenced by factors such as the diameter of the reinforcement, concrete strength, and bond characteristics.
For example, in ACI 318, the minimum development length for a #5 bar is 12 inches...
Embedded length is the length of reinforcement bar embedded in concrete, while development length is the length required for the bar to transfer its load to the concrete.
Embedded length is the portion of the reinforcement bar that is embedded in concrete to provide structural support.
Development length is the length of reinforcement required for the bar to transfer its load to the concrete without slippage.
Embedded len...
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Site Engineer
120
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
88
salaries
| ₹3.8 L/yr - ₹8.5 L/yr |
Civil Site Engineer
62
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
QA QC Engineer
51
salaries
| ₹1.8 L/yr - ₹6.6 L/yr |
MEP Engineer
49
salaries
| ₹1.4 L/yr - ₹7 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
Dodsal Engineering & Construction