Anchorage of reinforcing bars refers to the method of securing the bars in concrete to ensure proper transfer of forces.
Anchorage length is the portion of the reinforcing bar embedded in concrete to transfer forces effectively.
Proper anchorage is crucial for the structural integrity of the concrete element.
Anchorage can be achieved through hooks, bends, or mechanical anchorage devices.
Development length is the minimum ...
The minimum development length in a column is the length required for the full transfer of stress from the steel reinforcement to the concrete.
The minimum development length is typically specified by design codes or standards.
It is influenced by factors such as the diameter of the reinforcement, concrete strength, and bond characteristics.
For example, in ACI 318, the minimum development length for a #5 bar is 12 inches...
Embedded length is the length of reinforcement bar embedded in concrete, while development length is the length required for the bar to transfer its load to the concrete.
Embedded length is the portion of the reinforcement bar that is embedded in concrete to provide structural support.
Development length is the length of reinforcement required for the bar to transfer its load to the concrete without slippage.
Embedded len...
The process of a Water Treatment Plant (WTP) involves several stages to purify water for safe consumption.
Coagulation and Flocculation: Chemicals are added to water to remove suspended particles.
Sedimentation: The water is allowed to settle, and the solids are removed.
Filtration: Water passes through various filters to remove smaller particles.
Disinfection: Chlorine or other disinfectants are added to kill harmful micr...
The capacity of a Water Treatment Plant (WTP) is measured in million gallons per day (mgd).
WTP capacity is the maximum amount of water that can be treated and supplied per day.
It is an important factor in determining the water supply capability of a WTP.
Capacity can vary depending on the size and design of the plant.
For example, a WTP may have a capacity of 10 mgd, meaning it can treat and supply up to 10 million gallo
I am available to join immediately.
I can start working as soon as possible.
I am flexible with the joining date.
I am ready to begin work immediately.
I can join within a week of receiving the offer.
I am excited to start working on the specified joining date.
My notice period is 30 days.
My notice period is 30 days.
I am required to give a 30-day notice before leaving my current position.
I have already informed my current employer about my intention to leave and they are aware of my notice period.
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
Top trending discussions
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
posted on 14 Jul 2021
posted on 22 Feb 2023
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 30 Aug 2021
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
posted on 4 May 2019
posted on 10 Sep 2015
I applied via PLACEMENT
based on 4 interviews
1 Interview rounds
based on 14 reviews
Rating in categories
Assistant Manager
111
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Engineer
95
salaries
| ₹2.2 L/yr - ₹4.9 L/yr |
Senior Engineer
72
salaries
| ₹2.8 L/yr - ₹7.3 L/yr |
Deputy Manager
59
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Senior Assistant Manager
52
salaries
| ₹5.2 L/yr - ₹9.2 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
Nagarjuna Construction Company