Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Walk-in
About your job, location, CTC
Top trending discussions
posted on 19 Feb 2025
posted on 8 Sep 2024
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
I have extensive experience in overseeing the finishing work of building projects, ensuring high quality and timely completion.
Managed finishing work such as painting, flooring, and fixtures to meet project deadlines
Coordinated with subcontractors and vendors to ensure materials and labor were on schedule
Implemented quality control measures to maintain high standards of workmanship
Resolved any issues or discrepancies d...
DPR stands for Daily Progress Report. DLP period refers to Data Loss Prevention period.
DPR is a report that documents the daily progress of a project, including tasks completed, challenges faced, and plans for the next day.
DLP period is the time frame during which Data Loss Prevention measures are in effect to protect sensitive information from unauthorized access or disclosure.
Seeking new challenges, growth opportunities, and a better work-life balance.
Looking for new challenges and opportunities to grow professionally.
Seeking a better work-life balance.
Interested in working with new technologies or industries.
Want to expand my skill set and knowledge.
Seeking a more supportive or collaborative work environment.
I expect a competitive salary based on my experience, skills, and the market standards.
Expectation of a salary package that reflects my qualifications and experience
Consideration of market standards and industry norms
Open to negotiation based on additional benefits or perks offered
Looking for a fair and transparent compensation structure
posted on 26 Jan 2025
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.
IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies
IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines
Aerators are devices used to add air into water or other liquids to increase oxygen levels.
Surface aerators
Submersible aerators
Diffused aerators
Mechanical aerators
Aspirating aerators
posted on 14 Feb 2023
I applied via Referral and was interviewed in Jan 2023. There were 2 interview rounds.
Productivity of machinery and manpower is crucial for efficient operations.
Efficient machinery and skilled manpower can increase productivity.
Regular maintenance of machinery can prevent downtime and increase productivity.
Proper training and motivation of manpower can also improve productivity.
Use of automation and technology can further enhance productivity.
Productivity can be measured using metrics such as output per
Standard thumb rule in estimation
Thumb rule is a rough estimate based on experience
It is not accurate and can vary based on project
Example: 1 hour per page for content writing
Example: 1 month per developer for a software project
based on 2 interviews
Interview experience
based on 20 reviews
Rating in categories
Assistant Manager
101
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Engineer
94
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Senior Engineer
72
salaries
| ₹2.8 L/yr - ₹7.3 L/yr |
Deputy Manager
57
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Senior Assistant Manager
51
salaries
| ₹5.2 L/yr - ₹9.2 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
Nagarjuna Construction Company