Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Sterling & Wilson Civil Engineer Interview Questions and Answers

Updated 28 Aug 2021

Sterling & Wilson Civil Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What are the things to check before casting a tower foundation?
  • Ans. 

    Before casting a tower foundation, several things need to be checked to ensure its stability and durability.

    • Check the soil condition and bearing capacity

    • Ensure proper reinforcement and formwork

    • Verify the dimensions and alignment of the foundation

    • Check for any obstructions or utilities in the excavation area

    • Ensure proper curing of the concrete

    • Verify compliance with local building codes and regulations

  • Answered by AI
  • Q2. How is trapezoidal foundation quantity calculated?
  • Ans. 

    Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.

    • Measure the length and depth of the foundation

    • Measure the width at both ends and find the average width

    • Multiply the average width by the length and depth to get the volume

    • Calculate the quantity by multiplying the volume with the unit weight of concrete

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your answers even if you are not 100% sure about that. No one is judgi9 you by that one wrong answer but your confidence do make a difference.

Interview questions from similar companies

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI
Round 1 - Technical 

(1 Question)

  • Q1. Question about metro projects and pile foundation.
Round 2 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why we will hire you?

Interview Preparation Tips

Interview preparation tips for other job seekers - Ok.You can join there. Currently they have a lot of projects in india.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - HR 

(7 Questions)

  • Q1. What is your current workplace?
  • Ans. 

    I am currently working at a construction company specializing in infrastructure projects.

    • Specializing in infrastructure projects

    • Working at a construction company

    • Dealing with civil engineering tasks

  • Answered by AI
  • Q2. What is your experience in this field?
  • Ans. 

    I have 5 years of experience working on various civil engineering projects, including site development, infrastructure design, and construction management.

    • Managed site development projects from concept to completion

    • Designed infrastructure systems such as water supply and drainage

    • Performed construction management duties to ensure projects stayed on schedule and within budget

    • Worked on projects ranging from residential de...

  • Answered by AI
  • Q3. How do you handle a site in the transmission sector?
  • Ans. 

    Handling a site in the transmission sector involves coordinating with various stakeholders, ensuring compliance with regulations, and overseeing the construction process.

    • Coordinate with utility companies to ensure proper installation of transmission lines

    • Ensure compliance with safety regulations and environmental standards

    • Oversee the construction process to ensure quality and timely completion

    • Manage and resolve any iss...

  • Answered by AI
  • Q4. What are the key considerations for the foundation in transmission line construction?
  • Ans. 

    Key considerations for foundation in transmission line construction

    • Soil type and bearing capacity must be assessed

    • Proper foundation design to support the weight and wind loads of the transmission line towers

    • Consideration of environmental factors such as seismic activity and flooding

    • Accessibility for construction equipment and maintenance

    • Proper drainage to prevent erosion and foundation instability

  • Answered by AI
  • Q5. What is the best method for erection in transmission?
  • Ans. 

    The best method for erection in transmission is using cranes and specialized equipment.

    • Use cranes for lifting and placing heavy transmission components

    • Ensure proper planning and coordination to avoid delays

    • Utilize specialized equipment for precise positioning

    • Follow safety protocols to prevent accidents

    • Consider environmental factors such as wind and terrain

  • Answered by AI
  • Q6. How do you adapt to various challenging situations?
  • Ans. 

    I adapt to challenging situations by staying calm, analyzing the problem, seeking advice from colleagues, and coming up with creative solutions.

    • Stay calm and composed under pressure

    • Analyze the problem thoroughly before taking action

    • Seek advice and input from colleagues or experts

    • Think creatively to come up with innovative solutions

  • Answered by AI
  • Q7. What is the role of the diagonal in the transmission sector?
  • Ans. 

    The diagonal in the transmission sector plays a crucial role in providing structural stability and support to the transmission towers.

    • The diagonal members in transmission towers help to distribute the load and provide stability against wind and seismic forces.

    • They prevent the tower from buckling or collapsing under various loads.

    • Diagonals also help in reducing the overall weight of the tower by transferring some of the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You should prepare for work by acquiring knowledge about all the processes in this field, including any difficulties or problems related to this transmission line.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical specifications for IS code
  • Ans. 

    IS code refers to Indian Standards code which provides technical specifications for various products and services.

    • IS codes are developed by the Bureau of Indian Standards (BIS)

    • They cover a wide range of products and services such as construction materials, electrical appliances, food products, and more

    • IS codes provide technical specifications for quality, safety, and performance of products and services

    • Compliance with ...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectation
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

What is the colume
The vertical part of the building and base of the slab, distribution of load

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the footing
  • Ans. 

    A footing is a structural element that transfers the load from a building to the soil below.

    • Footing is typically made of concrete and is wider than the foundation walls it supports

    • Types of footings include spread footings, mat foundations, and pile foundations

    • Footing design is crucial for ensuring the stability and safety of a structure

  • Answered by AI
  • Q2. The base of the building

I applied via Recruitment Consultant and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Grade of concrete , reinforcement dia
  • Ans. 

    Grade of concrete and reinforcement diameter are important factors in civil engineering design.

    • The grade of concrete determines its strength and durability.

    • Common grades of concrete include M20, M25, and M30.

    • Reinforcement diameter affects the strength and stability of the structure.

    • Common reinforcement diameters include 8mm, 10mm, and 12mm.

    • The appropriate grade of concrete and reinforcement diameter depend on the speci

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical round is very important for all interviewer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the HDPE and Di pipe is code ??
  • Ans. 

    HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.

    • IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies

    • IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines

  • Answered by AI
  • Q2. Types of Aerator.
  • Ans. 

    Aerators are devices used to add air into water or other liquids to increase oxygen levels.

    • Surface aerators

    • Submersible aerators

    • Diffused aerators

    • Mechanical aerators

    • Aspirating aerators

  • Answered by AI
  • Q3. 3 Types of Aerator - 1) cascade 2) Tray tower 3) spray nozal

Interview Preparation Tips

Topics to prepare for Welspun Enterprises Senior Engineer interview:
  • Environmental Engineering
  • Building Construction
  • Water Treatment Plant
Interview preparation tips for other job seekers - Be confident and
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

Sterling & Wilson Interview FAQs

How to prepare for Sterling & Wilson Civil Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterling & Wilson. The most common topics and skills that interviewers at Sterling & Wilson expect are Civil Construction, Civil Engineering, Concrete, Construction and Construction Coordination.
What are the top questions asked in Sterling & Wilson Civil Engineer interview?

Some of the top questions asked at the Sterling & Wilson Civil Engineer interview -

  1. What are the things to check before casting a tower foundati...read more
  2. How is trapezoidal foundation quantity calculat...read more

Tell us how to improve this page.

Sterling & Wilson Civil Engineer Salary
based on 29 salaries
₹3 L/yr - ₹10 L/yr
26% more than the average Civil Engineer Salary in India
View more details

Sterling & Wilson Civil Engineer Reviews and Ratings

based on 7 reviews

3.6/5

Rating in categories

3.8

Skill development

2.9

Work-life balance

4.9

Salary

4.9

Job security

3.2

Company culture

4.1

Promotions

4.9

Work satisfaction

Explore 7 Reviews and Ratings
Senior Engineer
239 salaries
unlock blur

₹3.2 L/yr - ₹9.1 L/yr

Project Engineer
198 salaries
unlock blur

₹2.4 L/yr - ₹8.5 L/yr

Electrical Engineer
187 salaries
unlock blur

₹1.8 L/yr - ₹8.4 L/yr

Assistant Manager
185 salaries
unlock blur

₹4.2 L/yr - ₹15.5 L/yr

Deputy Manager
146 salaries
unlock blur

₹5.7 L/yr - ₹22 L/yr

Explore more salaries
Compare Sterling & Wilson with

Simplex Infrastructures

3.4
Compare

Aarvee Associates

3.9
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Ramky Infrastructure

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview