i
Sterling & Wilson
Filter interviews by
posted on 24 Apr 2024
Water treatment process involves several steps to remove impurities and make water safe for consumption.
Coagulation and flocculation to remove particles
Sedimentation to settle out solids
Filtration to remove remaining particles
Disinfection to kill bacteria and viruses
pH adjustment to control acidity or alkalinity
posted on 22 Feb 2022
I applied via Company Website and was interviewed in Oct 2023. There were 2 interview rounds.
HDPE and Di pipe IS codes are standards set by the Bureau of Indian Standards for high-density polyethylene and ductile iron pipes.
IS 4984: High-density polyethylene (HDPE) pipes for potable water supplies
IS 8329: Ductile iron (DI) pipes and fittings for pressure pipelines
Aerators are devices used to add air into water or other liquids to increase oxygen levels.
Surface aerators
Submersible aerators
Diffused aerators
Mechanical aerators
Aspirating aerators
I applied via Walk-in
About your job, location, CTC
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Our plant follows strict safety protocols, efficient workflow procedures, and regular maintenance schedules.
We have daily safety meetings to discuss potential hazards and ensure compliance with safety regulations.
Our workflow procedures are designed to maximize efficiency and productivity, with regular reviews to identify areas for improvement.
We have a comprehensive maintenance schedule in place to prevent breakdowns ...
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 24 reviews
Rating in categories
Assistant Manager
239
salaries
| ₹4 L/yr - ₹15.5 L/yr |
Senior Engineer
239
salaries
| ₹3.2 L/yr - ₹9 L/yr |
Project Engineer
201
salaries
| ₹2.4 L/yr - ₹8.5 L/yr |
Electrical Engineer
187
salaries
| ₹1.8 L/yr - ₹8.4 L/yr |
Deputy Manager
138
salaries
| ₹5 L/yr - ₹18 L/yr |
Simplex Infrastructures
Aarvee Associates
Nasser S. Al Hajri Corporation
Ramky Infrastructure