Sterling & Wilson Civil Site Engineer Interview Questions and Answers

Updated 12 Mar 2024

Sterling & Wilson Civil Site Engineer Interview Experiences

2 interviews found

Civil Site Engineer Interview Questions & Answers

user image Krishan Kumar Pandey

posted on 12 Mar 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION

Round 2 - Technical 

(2 Questions)

  • Q1. Work process, work ability, and all releted civil function.
  • Q2. System of solar
  • Ans. 

    Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.

    • The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.

    • The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.

    • The Sun is the central star of our solar system, p...

  • Answered by AI

Civil Site Engineer Interview Questions & Answers

user image SANTOSH KUMAR YADAV

posted on 3 May 2019

I applied via Referral

Interview Questionnaire 

1 Question

  • Q1. Steel structure and billing contractor salary discussion

Interview Preparation Tips

General Tips: My interview best and excellent as per CIVIL ENGINEER job regarding.
Skills: Communication, Body Language, Problem Solving, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. What are the dimensions of a standard brick?
  • Ans. 

    The standard dimensions of a brick are 3 5/8 inches x 2 1/4 inches x 8 inches.

    • Standard brick size is 3 5/8 inches x 2 1/4 inches x 8 inches

    • Bricks can also come in different sizes based on region or purpose

    • Common brick sizes include modular, jumbo, and queen

  • Answered by AI
  • Q2. What is the water-cement ratio?
  • Ans. 

    The water-cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • It is a crucial factor in determining the strength and durability of concrete.

    • A lower water-cement ratio results in stronger and more durable concrete.

    • The typical range for water-cement ratio is between 0.4 to 0.6.

    • Excessive water in the mix can lead to lower strength and durability of concrete.

  • Answered by AI
  • Q3. What is the heat of hydration?
  • Ans. 

    Heat of hydration is the heat released when water is added to cement during the chemical reaction of hydration.

    • Heat of hydration is the heat released when water is added to cement during the chemical reaction of hydration.

    • It is an exothermic reaction, meaning it releases heat.

    • The heat of hydration is important to consider in concrete construction to prevent cracking and ensure proper curing.

    • Higher heat of hydration can...

  • Answered by AI
  • Q4. What is curing?
  • Ans. 

    Curing is the process of maintaining adequate moisture and temperature in concrete to ensure proper hydration and strength development.

    • Curing helps prevent cracking and ensures the concrete reaches its full strength potential.

    • Common curing methods include water curing, membrane curing, and curing compounds.

    • Proper curing typically lasts for at least 7 days, but can vary depending on the type of concrete mix and environm

  • Answered by AI
  • Q5. What is footing and foundation?
  • Ans. 

    Footing is the bottommost part of a foundation that distributes the load of the structure to the soil.

    • Footing is typically made of concrete and is wider than the foundation walls to provide stability.

    • Foundations are the lower portion of a building structure that transfers the load to the soil.

    • There are different types of foundations such as shallow foundations (like spread footings) and deep foundations (like piles).

  • Answered by AI
  • Q6. What is one way slab and two way slab?
  • Ans. 

    One way slab is supported on two opposite sides while two way slab is supported on all four sides.

    • One way slab is designed to carry loads along one direction only

    • Two way slab is designed to carry loads along both directions

    • One way slab is supported on two opposite sides

    • Two way slab is supported on all four sides

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Kirloskar Brothers Civil Site Engineer interview:
  • Hr Fresher
Interview preparation tips for other job seekers - Civil engineering is a significant contribution that is essential for our lives.

I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cement test ,initially setting time
  • Q2. Cube mould size
  • Ans. 

    Cube mould size is a standard size used for testing the compressive strength of concrete.

    • Cube moulds are typically made of steel or cast iron.

    • The standard size for cube moulds is 150mm x 150mm x 150mm.

    • Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.

    • The moulds are filled with concrete and left to cure before being tested for compressive strength.

    • Cube moulds are used to ensure that the c...

  • Answered by AI
  • Q3. 1m. 8mm Dia steel rod weight,how to calculate
  • Ans. 

    To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.

    • Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length

    • Find the density of steel, which is typically around 7850 kg/m^3

    • Multiply the volume by the density to get the weight of the rod

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical strong.This interview was both knowledge and communication between sub contractor and engineer. Most of the questions related to diploma circling.

I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Some equation of leveling or survey

Interview Preparation Tips

Interview preparation tips for other job seekers - Make connection with other to grow up. Finally change your company when you have enough experience. .

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

Interview Questionnaire 

6 Questions

  • Q1. What is strength of M25 grade.
  • Q2. Complete Process of tower foundation day by day.
  • Ans. 

    The process of tower foundation involves several steps that are carried out day by day.

    • Day 1: Site preparation and layout survey

    • Day 2: Excavation for foundation

    • Day 3: Reinforcement placement

    • Day 4: Formwork installation

    • Day 5: Concrete pouring

    • Day 6: Curing of concrete

    • Day 7: Removal of formwork

    • Day 8: Quality inspection and testing

    • Day 9: Backfilling around the foundation

    • Day 10: Final inspection and documentation

  • Answered by AI
  • Q3. What is cube mould size.?
  • Ans. 

    Cube mould size refers to the dimensions of the mould used to cast concrete cubes for testing.

    • Cube moulds are typically made of steel or cast iron.

    • The most common cube mould size used in construction is 150mm x 150mm x 150mm.

    • Other sizes like 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used depending on the requirements.

    • Cube moulds have removable base plates to facilitate easy removal of the hardened conc...

  • Answered by AI
  • Q4. What are quality point at the pouring time of concrete.?
  • Ans. 

    Quality points at the pouring time of concrete include proper mix proportions, correct placement, adequate compaction, and appropriate curing.

    • Proper mix proportions ensure the desired strength and durability of the concrete.

    • Correct placement involves placing the concrete in the designated location without segregation or excessive bleeding.

    • Adequate compaction ensures that there are no voids or air pockets in the concret...

  • Answered by AI
  • Q5. Proper vibrate and proper mixing of concrete and good shuttering with oil and not mix extra water in concrete.
  • Q6. What is sloped cutting..?
  • Ans. 

    Sloped cutting refers to the excavation of soil or rock at an inclined angle to create a slope or incline.

    • Sloped cutting is commonly used in construction projects to create roadways, railways, or canals on hilly terrains.

    • It involves removing the excess material from a higher elevation to a lower elevation, forming a sloping surface.

    • The angle of the slope is determined based on factors such as soil stability, desired gr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. computer science related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

Interview Questionnaire 

3 Questions

  • Q1. Some questions have not been asked yet sir if you tell the date then we are ready to give interview
  • Q2. Sir you tell me when to come I have one year experience on your site
  • Q3. 1 year experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes sir i am ready to give interview

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Why do you want this job?
  • Ans. I positively look forward to give my best to your organization.
  • Answered by Dhinesh Babu
  • Q2. What attracted you to this company?
  • Ans. The company is great are team work.
  • Answered by Dhinesh Babu
  • Q3. What are your strength?
  • Ans. I am very strong analytical skills.
  • Answered by Dhinesh Babu

Interview Preparation Tips

Interview preparation tips for other job seekers - Bring your sense of humor and smile.

Interview Questionnaire 

2 Questions

  • Q1. Many ques asking me in compay .. Size of brics and many .. More que
  • Q2. Size of bricks
  • Ans. 

    The size of bricks varies depending on the country and region they are used in.

    • In the United States, the standard size for bricks is 2 1/4 x 3 3/4 x 8 inches.

    • In the United Kingdom, the standard size for bricks is 65mm x 102.5mm x 215mm.

    • Bricks can also come in different shapes and sizes for specific purposes, such as bullnose bricks for rounded edges.

    • The size of bricks can affect the strength and stability of a structur...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Plsss i have better experience to adopt the interview
Contribute & help others!
anonymous
You can choose to be anonymous

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson Civil Site Engineer interview?
Sterling & Wilson interview process usually has 2 rounds. The most common rounds in the Sterling & Wilson interview process are Group Discussion and Technical.
How to prepare for Sterling & Wilson Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterling & Wilson. The most common topics and skills that interviewers at Sterling & Wilson expect are Civil Engineering, Civil Site Engineering, Columns, EPC and Foundation.
What are the top questions asked in Sterling & Wilson Civil Site Engineer interview?

Some of the top questions asked at the Sterling & Wilson Civil Site Engineer interview -

  1. System of so...read more
  2. Steel structure and billing contractor salary discussi...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

JOBS

Tata Technologies

No Jobs

INTERVIEWS

Sterling & Wilson

No Interviews

INTERVIEWS

KEC International

No Interviews

INTERVIEWS

KEC International

No Interviews

INTERVIEWS

KEC International

No Interviews

INTERVIEWS

Tata Technologies

No Interviews

JOBS

Creativve Constructiions

No Jobs

INTERVIEWS

Sterling & Wilson

No Interviews

Tell us how to improve this page.

Sterling & Wilson Civil Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Sterling & Wilson Civil Site Engineer Salary
based on 37 salaries
₹2.4 L/yr - ₹6.5 L/yr
15% more than the average Civil Site Engineer Salary in India
View more details

Sterling & Wilson Civil Site Engineer Reviews and Ratings

based on 9 reviews

3.4/5

Rating in categories

3.5

Skill development

3.9

Work-life balance

3.8

Salary

4.1

Job security

3.6

Company culture

3.5

Promotions

4.0

Work satisfaction

Explore 9 Reviews and Ratings
Electrical Engineer
270 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
246 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
235 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
165 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
137 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Sterling & Wilson with

Larsen & Toubro Limited

4.0
Compare

Tata Power

3.9
Compare

Thermax Limited

4.1
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview